Your SlideShare is downloading. ×
Fuel Monitoring Requirements and Alternative Monitoring Petition
Fuel Monitoring Requirements and Alternative Monitoring Petition
Fuel Monitoring Requirements and Alternative Monitoring Petition
Fuel Monitoring Requirements and Alternative Monitoring Petition
Fuel Monitoring Requirements and Alternative Monitoring Petition
Fuel Monitoring Requirements and Alternative Monitoring Petition
Fuel Monitoring Requirements and Alternative Monitoring Petition
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Fuel Monitoring Requirements and Alternative Monitoring Petition

393

Published on

Eric Swisher of All4 Inc. presents "Fuel Monitoring Requirements" and "Alternative Monitoring Petition" in order to educate industry about the options available regarding alternative monitoring or …

Eric Swisher of All4 Inc. presents "Fuel Monitoring Requirements" and "Alternative Monitoring Petition" in order to educate industry about the options available regarding alternative monitoring or various processes.

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
393
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide
  • Control device or combination of control devices are not covered in Table 4
  • Transcript

    • 1. Fuel Monitoring Requirements Presented to AF&PA, AWC, & NCASI by All4 Inc. Eric M Swisher| eswisher@all4inc.com | 610.933.5246 ext. 17 March 14, 2013 www.all4inc.com Kimberton, PA | 610.933.5246 Columbus, GA | 706.221.7688
    • 2. Fuel Monitoring Requirements  Recordkeeping • Type and amount of fuel combusted on a monthly basis  Monthly Fuel Analysis • Each type of fuel combusted • Sampling programs separated by at least 14 calendar days  Quarterly Fuel Analysis • Each type of fuel combusted • 12 consecutive monthly fuel analyses are ≤ 75% of the compliance level • Resume monthly fuel analysis for new fuels or if quarterly fuel analysis is > 75% of the compliance level 2 Your environmental compliance is clearly our business.
    • 3. Alternative Monitoring Petition Presented to AF&PA, AWC, & NCASI by All4 Inc. Eric M Swisher| eswisher@all4inc.com | 610.933.5246 ext. 17 March 14, 2013 www.all4inc.com Kimberton, PA | 610.933.5246 Columbus, GA | 706.221.7688
    • 4. Alternative Monitoring Petition (AMP)   4 Operating limits for specific control device not listed in Table 4 Establish an alternative operating limit with alternative monitoring parameter(s) Your environmental compliance is clearly our business.
    • 5. AMP Elements  Process & Control Device Description • Diagrams  Four (4) elements of monitoring • • • •   5 Indicator(s) of performance Measurement techniques Monitoring frequency Averaging time Performance Evaluation Test Plan (if applicable) Quality Assurance Activities Your environmental compliance is clearly our business.
    • 6. AMP Process   Alternative Monitoring Identification Alternative Monitoring Strategy • Review U.S. EPA’s Applicability Determination Index (ADI)   Application Development Submittal to U.S. EPA • At least 60 days prior to the Performance Test  Approval or intention to deny from U.S. EPA • Within 30 calendar days after AMP (and any additional information) has been received by U.S. EPA  6 Expect Several Iterations Your environmental compliance is clearly our business.
    • 7. Questions ? Eric M Swisher| eswisher@all4inc.com | 610.933.5246 ext. 17 www.all4inc.com Kimberton, PA | 610.933.5246 Columbus, GA | 706.221.7688

    ×