Outline


Drivers and tools
• Boiler MACT
• NSR Reform rules
• Improve operational flexibility while decreasing actual
emissions
• Reduce operating and compliance costs
• Timing: Outages? Agency processing? Procurement?



2

Case study
• Existing Kraft mill – increase pulp production, BLS rate
• Boiler conversion – multi-fuel to gas, limited coal
• PSD avoidance; reduced Boiler MACT obligations

Your environmental compliance is clearly our business.
Boiler MACT and
Strategic Air Permitting
Drivers and Tools
Drivers and Tools – Boiler MACT


Typical Boiler MACT project begins with:
•
•
•
•



Establishing your subcategory (initial notification)
Fuels combusted and design type
Design heat input capacity
Annual heat input basis 12-months prior to compliance event

Identify applicable emission limits
• Install APC; TSM option; output based standards
• Engineering testing for compliance strategy




Derating < 10 MMBtu/hr or retiring units
Change fuel mix or introduce new fuels (e.g., TDF)
• Our project: Accept limitation on fuel usage to switch
subcategory, and generate actual emission decreases

4

Your environmental compliance is clearly our business.
Drivers and Tools – NSR Reform


NSR reform allows creative
accounting, particularly for existing emission units
• Identify modified and affected units






Projects with boilers: Boilers; Woodyard; Fuel handling
equipment
Debottlenecking….More steam = more production?

Baseline actual to projected actual test
• Testing: Opportunity to re-establish baselines based
on engineering testing for Boiler MACT compliance or
other updated data
• Historical factors < testing results = good thing

5

Your environmental compliance is clearly our business.
Drivers and Tools – NSR Reform




If production increase project exceeds PSD
significance, Boiler MACT project can provide
contemporaneous decreases to net out of PSD (case
study)
Projected actual emissions
• Consider multiple scenarios to maximum flexibility


Changes to types and rates of fuels and/or production materials

• Excludable emissions – historical peak monthly levels during
baseline
• Remember timing: consider outage schedules, permit
preparation and processing time, capital procurement process

6

New units more limited: based on potential to emit (PTE)
• Consider air pollution control devices and fuel or production

Your environmental compliance is clearly our business.
Drivers and Tools – NSR Reform


Boiler MACT projects & contemporaneous decreases
•
•
•
•







7

Retired (past) units
Shutdown currently permitted units
Limited use units (e.g., change to a backup boiler)
Be careful with contemporaneous PSD avoidance projects!

Actual reductions to comply with MACT considered
surplus for NSR netting and can be used (U.S. EPA memo)
Source obligation tracking
Are additional regulations triggered (e.g., NSPS)?
Don’t forget about NAAQS considerations
Your environmental compliance is clearly our business.
Boiler MACT and
Strategic Air Permitting
Case Study
Case Study


Existing unbleached Kraft pulp mill
• Project to increase pulp production and BLS firing rate







Existing recovery furnace physically modified
Affected sources: Recovery Area; Pulping System; Washing;
Paper Machines; Woodyard
Causticizing & kiln unaffected due to historical operations
Baseline actual to projected actual emissions

• Convert combination boiler to natural gas power
boiler




9

Consider various scenarios of coal firing for backup fuel
Annual capacity factor limitation
Key to viability: contemporaneous decrease
Your environmental compliance is clearly our business.
Case Study


Current combination boiler
• Coal, wood, natural gas, fuel oil
• Existing source with respect to Boiler MACT




Coal/solid fossil fuel, stoker subcategories

Natural gas conversion project
• Natural gas and coal only


Coal limited to annual capacity factor <10%

• Reclassified as Gas 2 (other) unit subcategory


10

Comparison of Boiler MACT emission limits

Your environmental compliance is clearly our business.
Case Study


Boiler MACT emission limits comparison
Pollutant

1.7E-03 lb/MMBtu

5.7E-06 lb/MMBtu

7.9E-06 lb/MMBtu

PM

4.0E-02 lb/MMBtu

6.7E-03 lb/MMBtu

CO

11

2.2E-02 lb/MMBtu

Hg



Gas 2 Subcategory

HCl



Coal Subcategory

160 ppmvd @ 3% O2

130 ppmvd @ 3% O2

Testing for HCl, Hg, PM (coal); CO (gas)
Fuel sampling limited to 100% coal firing scenario
Your environmental compliance is clearly our business.
Case Study


Existing emission units so….baseline actual emissions
• NSR Reform






Consecutive 24-month period in 10-year look back
Average annual rate for the 24-month period
Influenced by use of non-natural gas fuels

Projected actual emissions
• Based on reduced coal usage and elimination of fuel oil and
wood waste in boiler
• Mill production levels based on maximum BLS firing with the
maximum amount of natural gas firing
• Maintain some backup fuel capacity with coal
• Excludable emissions not considered to conservatively estimate
projected actual emissions

12

Your environmental compliance is clearly our business.
Case Study




Project related increases significant for
VOC, NOX, PM, PM10, and PM2.5
Netting of contemporaneous projects
• Decreases consisted of reductions attributable to
boiler coal limitation
• Decreases for all pollutants except VOC after netting
(though VOC net increase not significant)
• PSD avoided

13

Your environmental compliance is clearly our business.
Boiler MACT and
Strategic Air Permitting
Conclusions
Conclusions


Increase in production achieved
• ~15% increase in BLS firing rate over current limit
• ~25% increase in pulp production over current limit




PSD avoidance
Simpler Boiler MACT obligations
• No need for add-on control
• Less complicated testing and fuel sampling
requirements

15

Your environmental compliance is clearly our business.
Questions and Open
Discussions

Mark Wenclawiak, CCM | mwenclawiak@all4inc.com | 678-460-0324

www.all4inc.com
Kimberton, PA | 610.933.5246
Kennesaw, GA | 678.460.0324

More Related Content

What's hot

Gas reinjection and flaring reduction Norway's experience - Steinar Nja (Norw...
Gas reinjection and flaring reduction Norway's experience - Steinar Nja (Norw...Gas reinjection and flaring reduction Norway's experience - Steinar Nja (Norw...
Gas reinjection and flaring reduction Norway's experience - Steinar Nja (Norw...Esther Petrilli-Massey
 
Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...
Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...
Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...Kevin Perry
 
Membrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) PresentationMembrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) PresentationGlobal CCS Institute
 
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...All4 Inc.
 
Primer Taller Gold Standard en Colombia: Metodologías GS Estufas eficientes p...
Primer Taller Gold Standard en Colombia: Metodologías GS Estufas eficientes p...Primer Taller Gold Standard en Colombia: Metodologías GS Estufas eficientes p...
Primer Taller Gold Standard en Colombia: Metodologías GS Estufas eficientes p...Fundación Natura Colombia
 
Ian tuena (1) nrc presentation hpe2016
Ian tuena (1) nrc presentation hpe2016Ian tuena (1) nrc presentation hpe2016
Ian tuena (1) nrc presentation hpe2016ARAaus
 
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...Global CCS Institute
 
Co2 capture-technologies
Co2 capture-technologiesCo2 capture-technologies
Co2 capture-technologiesDzung Le
 
The complexities of nsr permitting ddix
The complexities of nsr permitting ddixThe complexities of nsr permitting ddix
The complexities of nsr permitting ddixAll4 Inc.
 
Barcelona refining summit 2014
Barcelona refining summit 2014Barcelona refining summit 2014
Barcelona refining summit 2014BRONSWERK
 
Potential PM2.5 and CPM Pitfalls in Permitting, Testing, and Compliance
Potential PM2.5 and CPM Pitfalls in Permitting, Testing, and CompliancePotential PM2.5 and CPM Pitfalls in Permitting, Testing, and Compliance
Potential PM2.5 and CPM Pitfalls in Permitting, Testing, and ComplianceAll4 Inc.
 
100+ year journey of using ammonia, carbon dioxide, and hydrocarbons
100+ year journey of using ammonia, carbon dioxide, and hydrocarbons100+ year journey of using ammonia, carbon dioxide, and hydrocarbons
100+ year journey of using ammonia, carbon dioxide, and hydrocarbonsATMOsphere Conferences & Events
 
Sans healthcare watch
Sans healthcare watchSans healthcare watch
Sans healthcare watchSA FHE
 
New technology evaluation for SAGD facilities in oil sands
New technology evaluation for SAGD facilities in oil sandsNew technology evaluation for SAGD facilities in oil sands
New technology evaluation for SAGD facilities in oil sandsProcess Ecology Inc
 
Mission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation ChallengeMission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation ChallengeGlobal CCS Institute
 
Barik Gas Blow Down FDP - Europec2010 Paper
Barik Gas Blow Down FDP - Europec2010 PaperBarik Gas Blow Down FDP - Europec2010 Paper
Barik Gas Blow Down FDP - Europec2010 PaperSai_Garimella
 

What's hot (20)

Commercial Condensing Boiler Optimization
Commercial Condensing Boiler OptimizationCommercial Condensing Boiler Optimization
Commercial Condensing Boiler Optimization
 
Gas reinjection and flaring reduction Norway's experience - Steinar Nja (Norw...
Gas reinjection and flaring reduction Norway's experience - Steinar Nja (Norw...Gas reinjection and flaring reduction Norway's experience - Steinar Nja (Norw...
Gas reinjection and flaring reduction Norway's experience - Steinar Nja (Norw...
 
Part l presentation
Part l presentationPart l presentation
Part l presentation
 
Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...
Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...
Ellis, Melissa, Tellevate, New Source Performance Standards for Grain Elevato...
 
Membrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) PresentationMembrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) Presentation
 
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
 
Primer Taller Gold Standard en Colombia: Metodologías GS Estufas eficientes p...
Primer Taller Gold Standard en Colombia: Metodologías GS Estufas eficientes p...Primer Taller Gold Standard en Colombia: Metodologías GS Estufas eficientes p...
Primer Taller Gold Standard en Colombia: Metodologías GS Estufas eficientes p...
 
Ian tuena (1) nrc presentation hpe2016
Ian tuena (1) nrc presentation hpe2016Ian tuena (1) nrc presentation hpe2016
Ian tuena (1) nrc presentation hpe2016
 
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
 
Co2 capture-technologies
Co2 capture-technologiesCo2 capture-technologies
Co2 capture-technologies
 
Global CCS Institute Presentation
Global CCS Institute PresentationGlobal CCS Institute Presentation
Global CCS Institute Presentation
 
The complexities of nsr permitting ddix
The complexities of nsr permitting ddixThe complexities of nsr permitting ddix
The complexities of nsr permitting ddix
 
Barcelona refining summit 2014
Barcelona refining summit 2014Barcelona refining summit 2014
Barcelona refining summit 2014
 
Potential PM2.5 and CPM Pitfalls in Permitting, Testing, and Compliance
Potential PM2.5 and CPM Pitfalls in Permitting, Testing, and CompliancePotential PM2.5 and CPM Pitfalls in Permitting, Testing, and Compliance
Potential PM2.5 and CPM Pitfalls in Permitting, Testing, and Compliance
 
ION Engineering Presentation
ION Engineering PresentationION Engineering Presentation
ION Engineering Presentation
 
100+ year journey of using ammonia, carbon dioxide, and hydrocarbons
100+ year journey of using ammonia, carbon dioxide, and hydrocarbons100+ year journey of using ammonia, carbon dioxide, and hydrocarbons
100+ year journey of using ammonia, carbon dioxide, and hydrocarbons
 
Sans healthcare watch
Sans healthcare watchSans healthcare watch
Sans healthcare watch
 
New technology evaluation for SAGD facilities in oil sands
New technology evaluation for SAGD facilities in oil sandsNew technology evaluation for SAGD facilities in oil sands
New technology evaluation for SAGD facilities in oil sands
 
Mission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation ChallengeMission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation Challenge
 
Barik Gas Blow Down FDP - Europec2010 Paper
Barik Gas Blow Down FDP - Europec2010 PaperBarik Gas Blow Down FDP - Europec2010 Paper
Barik Gas Blow Down FDP - Europec2010 Paper
 

Viewers also liked

Improve Your Business Operations and Project Success with Gordon Tredgold
Improve Your Business Operations and Project Success with Gordon TredgoldImprove Your Business Operations and Project Success with Gordon Tredgold
Improve Your Business Operations and Project Success with Gordon TredgoldQuickBase, Inc.
 
GanttChart for ClearQuest 1.4 and 1.3.1
GanttChart for ClearQuest 1.4 and 1.3.1GanttChart for ClearQuest 1.4 and 1.3.1
GanttChart for ClearQuest 1.4 and 1.3.1Alexander Novichkov
 
MB0038 – Management Process and Organization Behavior
 MB0038 – Management Process and Organization Behavior MB0038 – Management Process and Organization Behavior
MB0038 – Management Process and Organization Behaviorswejs
 
Intern operations project
Intern operations projectIntern operations project
Intern operations projectKidd Khazini
 
Bus 606 operations analysis project - rip curl
Bus 606   operations analysis project - rip curlBus 606   operations analysis project - rip curl
Bus 606 operations analysis project - rip curlRipCurlTeamPhotos
 
Energy Management by Food&Beverage Industry
Energy Management by Food&Beverage IndustryEnergy Management by Food&Beverage Industry
Energy Management by Food&Beverage IndustryAvanceon
 
Project work efficiency of boilers
Project work   efficiency of boilersProject work   efficiency of boilers
Project work efficiency of boilersRodrigo Barcelos
 
CSTPS training REPORT
CSTPS training REPORTCSTPS training REPORT
CSTPS training REPORTUday Wankar
 
Microsoft project 2003
Microsoft project 2003Microsoft project 2003
Microsoft project 2003pparakh
 
Scheduling
SchedulingScheduling
Schedulingjaya_22
 
Project Report on Analysis of Boiler- Aditya
Project Report on Analysis of Boiler- AdityaProject Report on Analysis of Boiler- Aditya
Project Report on Analysis of Boiler- AdityaAditya Bhattacharjee
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPriyanka Modugu
 
Royal dutch shell
Royal dutch shell Royal dutch shell
Royal dutch shell Bhavna Pant
 
Using Microsoft Project 2003
Using Microsoft Project 2003Using Microsoft Project 2003
Using Microsoft Project 2003pparakh
 
Operations management project
Operations management projectOperations management project
Operations management projectSai Htike
 
Chapter 9 Planning Tools Techniques Ppt09
Chapter 9 Planning Tools Techniques Ppt09Chapter 9 Planning Tools Techniques Ppt09
Chapter 9 Planning Tools Techniques Ppt09D
 

Viewers also liked (20)

Improve Your Business Operations and Project Success with Gordon Tredgold
Improve Your Business Operations and Project Success with Gordon TredgoldImprove Your Business Operations and Project Success with Gordon Tredgold
Improve Your Business Operations and Project Success with Gordon Tredgold
 
GanttChart for ClearQuest 1.4 and 1.3.1
GanttChart for ClearQuest 1.4 and 1.3.1GanttChart for ClearQuest 1.4 and 1.3.1
GanttChart for ClearQuest 1.4 and 1.3.1
 
MB0038 – Management Process and Organization Behavior
 MB0038 – Management Process and Organization Behavior MB0038 – Management Process and Organization Behavior
MB0038 – Management Process and Organization Behavior
 
BRASS MBA in a Day
BRASS MBA in a DayBRASS MBA in a Day
BRASS MBA in a Day
 
Intern operations project
Intern operations projectIntern operations project
Intern operations project
 
Commercial Condensing Boiler Optimizaiton
Commercial Condensing Boiler OptimizaitonCommercial Condensing Boiler Optimizaiton
Commercial Condensing Boiler Optimizaiton
 
Bus 606 operations analysis project - rip curl
Bus 606   operations analysis project - rip curlBus 606   operations analysis project - rip curl
Bus 606 operations analysis project - rip curl
 
Energy Management by Food&Beverage Industry
Energy Management by Food&Beverage IndustryEnergy Management by Food&Beverage Industry
Energy Management by Food&Beverage Industry
 
Project work efficiency of boilers
Project work   efficiency of boilersProject work   efficiency of boilers
Project work efficiency of boilers
 
Boiler
BoilerBoiler
Boiler
 
CSTPS training REPORT
CSTPS training REPORTCSTPS training REPORT
CSTPS training REPORT
 
Microsoft project 2003
Microsoft project 2003Microsoft project 2003
Microsoft project 2003
 
Scheduling
SchedulingScheduling
Scheduling
 
Project Report on Analysis of Boiler- Aditya
Project Report on Analysis of Boiler- AdityaProject Report on Analysis of Boiler- Aditya
Project Report on Analysis of Boiler- Aditya
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
Royal dutch shell
Royal dutch shell Royal dutch shell
Royal dutch shell
 
Ent300 Module09
Ent300 Module09Ent300 Module09
Ent300 Module09
 
Using Microsoft Project 2003
Using Microsoft Project 2003Using Microsoft Project 2003
Using Microsoft Project 2003
 
Operations management project
Operations management projectOperations management project
Operations management project
 
Chapter 9 Planning Tools Techniques Ppt09
Chapter 9 Planning Tools Techniques Ppt09Chapter 9 Planning Tools Techniques Ppt09
Chapter 9 Planning Tools Techniques Ppt09
 

Similar to Boiler MACT and Strategic Air Permitting

Overview of Current Directions in Carbon Capture R&D
Overview of Current Directions in Carbon Capture R&DOverview of Current Directions in Carbon Capture R&D
Overview of Current Directions in Carbon Capture R&DGlobal CCS Institute
 
Costs of capturing CO2 from industrial sources - Morgan Summers, National Ene...
Costs of capturing CO2 from industrial sources - Morgan Summers, National Ene...Costs of capturing CO2 from industrial sources - Morgan Summers, National Ene...
Costs of capturing CO2 from industrial sources - Morgan Summers, National Ene...Global CCS Institute
 
Design basis - PROCESS DESIGN FUNDAMENTALS
Design basis  - PROCESS DESIGN FUNDAMENTALSDesign basis  - PROCESS DESIGN FUNDAMENTALS
Design basis - PROCESS DESIGN FUNDAMENTALSiFluids Engineering
 
Design basis - PROCESS DESIGN FUNDAMENTALS
Design basis  - PROCESS DESIGN FUNDAMENTALSDesign basis  - PROCESS DESIGN FUNDAMENTALS
Design basis - PROCESS DESIGN FUNDAMENTALSiFluids Engineering
 
Case Study - NSR 2010
Case Study - NSR 2010Case Study - NSR 2010
Case Study - NSR 2010All4 Inc.
 
Maximizing Profit of Steel Production by Integrated Optimisation Technology
Maximizing Profit of Steel Production by Integrated Optimisation TechnologyMaximizing Profit of Steel Production by Integrated Optimisation Technology
Maximizing Profit of Steel Production by Integrated Optimisation TechnologyN-SIDE
 
BlueScape Air Quality in 2015: What You Need to Know Webinar 2-10-15
BlueScape Air Quality in 2015: What You Need to Know Webinar 2-10-15BlueScape Air Quality in 2015: What You Need to Know Webinar 2-10-15
BlueScape Air Quality in 2015: What You Need to Know Webinar 2-10-15BlueScape
 
BlueScape GHG Tailoring Rule Webinar 9-9-10
BlueScape GHG Tailoring Rule Webinar  9-9-10BlueScape GHG Tailoring Rule Webinar  9-9-10
BlueScape GHG Tailoring Rule Webinar 9-9-10BlueScape
 
CatFT(r) Fischer-Tropsch Process presentation
CatFT(r) Fischer-Tropsch Process presentationCatFT(r) Fischer-Tropsch Process presentation
CatFT(r) Fischer-Tropsch Process presentationThomas Holcombe
 
Webinar: Post-combusion carbon capture - Thermodynamic modelling
Webinar: Post-combusion carbon capture - Thermodynamic modellingWebinar: Post-combusion carbon capture - Thermodynamic modelling
Webinar: Post-combusion carbon capture - Thermodynamic modellingGlobal CCS Institute
 
BlueScape EPA Air Toxics Standards for Boilers and Process Heaters 03-15-11
BlueScape EPA Air Toxics Standards for Boilers and Process Heaters 03-15-11BlueScape EPA Air Toxics Standards for Boilers and Process Heaters 03-15-11
BlueScape EPA Air Toxics Standards for Boilers and Process Heaters 03-15-11BlueScape
 
Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and F...
Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and F...Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and F...
Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and F...All4 Inc.
 
Project services offering (november 2016)
Project services offering (november 2016)Project services offering (november 2016)
Project services offering (november 2016)Luis Domínguez
 
Project services offering (november 2016)
Project services offering (november 2016)Project services offering (november 2016)
Project services offering (november 2016)Process Ecology Inc
 

Similar to Boiler MACT and Strategic Air Permitting (20)

Overview of Current Directions in Carbon Capture R&D
Overview of Current Directions in Carbon Capture R&DOverview of Current Directions in Carbon Capture R&D
Overview of Current Directions in Carbon Capture R&D
 
Costs of capturing CO2 from industrial sources - Morgan Summers, National Ene...
Costs of capturing CO2 from industrial sources - Morgan Summers, National Ene...Costs of capturing CO2 from industrial sources - Morgan Summers, National Ene...
Costs of capturing CO2 from industrial sources - Morgan Summers, National Ene...
 
Design basis - PROCESS DESIGN FUNDAMENTALS
Design basis  - PROCESS DESIGN FUNDAMENTALSDesign basis  - PROCESS DESIGN FUNDAMENTALS
Design basis - PROCESS DESIGN FUNDAMENTALS
 
Design basis - PROCESS DESIGN FUNDAMENTALS
Design basis  - PROCESS DESIGN FUNDAMENTALSDesign basis  - PROCESS DESIGN FUNDAMENTALS
Design basis - PROCESS DESIGN FUNDAMENTALS
 
Measure your carbon footprint
Measure your carbon footprintMeasure your carbon footprint
Measure your carbon footprint
 
Paul Fennell (Imperial College London) - Cost comparison of different technol...
Paul Fennell (Imperial College London) - Cost comparison of different technol...Paul Fennell (Imperial College London) - Cost comparison of different technol...
Paul Fennell (Imperial College London) - Cost comparison of different technol...
 
Case Study - NSR 2010
Case Study - NSR 2010Case Study - NSR 2010
Case Study - NSR 2010
 
Renewable Natural Gas
Renewable Natural GasRenewable Natural Gas
Renewable Natural Gas
 
Maximizing Profit of Steel Production by Integrated Optimisation Technology
Maximizing Profit of Steel Production by Integrated Optimisation TechnologyMaximizing Profit of Steel Production by Integrated Optimisation Technology
Maximizing Profit of Steel Production by Integrated Optimisation Technology
 
BlueScape Air Quality in 2015: What You Need to Know Webinar 2-10-15
BlueScape Air Quality in 2015: What You Need to Know Webinar 2-10-15BlueScape Air Quality in 2015: What You Need to Know Webinar 2-10-15
BlueScape Air Quality in 2015: What You Need to Know Webinar 2-10-15
 
Banff Presentation
Banff PresentationBanff Presentation
Banff Presentation
 
BlueScape GHG Tailoring Rule Webinar 9-9-10
BlueScape GHG Tailoring Rule Webinar  9-9-10BlueScape GHG Tailoring Rule Webinar  9-9-10
BlueScape GHG Tailoring Rule Webinar 9-9-10
 
Sgcp14beckmanncp
Sgcp14beckmanncpSgcp14beckmanncp
Sgcp14beckmanncp
 
CatFT(r) Fischer-Tropsch Process presentation
CatFT(r) Fischer-Tropsch Process presentationCatFT(r) Fischer-Tropsch Process presentation
CatFT(r) Fischer-Tropsch Process presentation
 
Webinar: Post-combusion carbon capture - Thermodynamic modelling
Webinar: Post-combusion carbon capture - Thermodynamic modellingWebinar: Post-combusion carbon capture - Thermodynamic modelling
Webinar: Post-combusion carbon capture - Thermodynamic modelling
 
BlueScape EPA Air Toxics Standards for Boilers and Process Heaters 03-15-11
BlueScape EPA Air Toxics Standards for Boilers and Process Heaters 03-15-11BlueScape EPA Air Toxics Standards for Boilers and Process Heaters 03-15-11
BlueScape EPA Air Toxics Standards for Boilers and Process Heaters 03-15-11
 
Techno-economic assessment and global sensitivity analysis for biomass-based ...
Techno-economic assessment and global sensitivity analysis for biomass-based ...Techno-economic assessment and global sensitivity analysis for biomass-based ...
Techno-economic assessment and global sensitivity analysis for biomass-based ...
 
Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and F...
Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and F...Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and F...
Implications of Greenhouse Gas (GHG), Volatile Organic Compounds (VOC), and F...
 
Project services offering (november 2016)
Project services offering (november 2016)Project services offering (november 2016)
Project services offering (november 2016)
 
Project services offering (november 2016)
Project services offering (november 2016)Project services offering (november 2016)
Project services offering (november 2016)
 

More from All4 Inc.

Impacts of U.S. EPA Region 6 Guidance on CMS Downtime and Data Calculations
Impacts of U.S. EPA Region 6 Guidance on CMS Downtime and Data CalculationsImpacts of U.S. EPA Region 6 Guidance on CMS Downtime and Data Calculations
Impacts of U.S. EPA Region 6 Guidance on CMS Downtime and Data CalculationsAll4 Inc.
 
Implementing a DAHS for Compliance with the Refinery Sector Rule
Implementing a DAHS for Compliance with the Refinery Sector RuleImplementing a DAHS for Compliance with the Refinery Sector Rule
Implementing a DAHS for Compliance with the Refinery Sector RuleAll4 Inc.
 
NSR Reform Updates
NSR Reform Updates NSR Reform Updates
NSR Reform Updates All4 Inc.
 
Tceq recent permitting changes 4 c-2019-f_dougherty (1-31-19)
Tceq recent permitting changes 4 c-2019-f_dougherty (1-31-19)Tceq recent permitting changes 4 c-2019-f_dougherty (1-31-19)
Tceq recent permitting changes 4 c-2019-f_dougherty (1-31-19)All4 Inc.
 
All4 impacts of recent u.s. epa region 6 guidance on cms downtime and data ...
All4   impacts of recent u.s. epa region 6 guidance on cms downtime and data ...All4   impacts of recent u.s. epa region 6 guidance on cms downtime and data ...
All4 impacts of recent u.s. epa region 6 guidance on cms downtime and data ...All4 Inc.
 
D dix awma conference air toxics evaluation requirements 062718
D dix awma conference air toxics evaluation requirements 062718D dix awma conference air toxics evaluation requirements 062718
D dix awma conference air toxics evaluation requirements 062718All4 Inc.
 
4 c nsr presentation 032318 all4 mccall
4 c nsr presentation 032318   all4 mccall4 c nsr presentation 032318   all4 mccall
4 c nsr presentation 032318 all4 mccallAll4 Inc.
 
All4 inc awma re-entrainment
All4 inc awma re-entrainmentAll4 inc awma re-entrainment
All4 inc awma re-entrainmentAll4 Inc.
 
All4 tcc acit pres ipt guidance 2017
All4 tcc acit pres ipt guidance 2017All4 tcc acit pres ipt guidance 2017
All4 tcc acit pres ipt guidance 2017All4 Inc.
 
Air Quality Compliance Training 12-8-16
Air Quality Compliance Training 12-8-16Air Quality Compliance Training 12-8-16
Air Quality Compliance Training 12-8-16All4 Inc.
 
CEDRI-NextGen
CEDRI-NextGenCEDRI-NextGen
CEDRI-NextGenAll4 Inc.
 
understanding the validity and increased scrutiny of data used for compliance...
understanding the validity and increased scrutiny of data used for compliance...understanding the validity and increased scrutiny of data used for compliance...
understanding the validity and increased scrutiny of data used for compliance...All4 Inc.
 
CUHMMC Presentation
CUHMMC PresentationCUHMMC Presentation
CUHMMC PresentationAll4 Inc.
 
Preview of ALL4 Air Quality Compliance - PIOGATech
Preview of ALL4 Air Quality Compliance - PIOGATechPreview of ALL4 Air Quality Compliance - PIOGATech
Preview of ALL4 Air Quality Compliance - PIOGATechAll4 Inc.
 
Top 5 Environmental Compliance Issues for Engineers and Managers
Top 5 Environmental Compliance Issues for Engineers and ManagersTop 5 Environmental Compliance Issues for Engineers and Managers
Top 5 Environmental Compliance Issues for Engineers and ManagersAll4 Inc.
 
SO2 Data Requirements Rule Modeling Strategies
SO2 Data Requirements Rule Modeling StrategiesSO2 Data Requirements Rule Modeling Strategies
SO2 Data Requirements Rule Modeling StrategiesAll4 Inc.
 
The complexities of new source review air permitting – a case study ddix 020116
The complexities of new source review air permitting – a case study ddix 020116The complexities of new source review air permitting – a case study ddix 020116
The complexities of new source review air permitting – a case study ddix 020116All4 Inc.
 
The Good vs. Bad: The Specifics for Validating CMS Data
The Good vs. Bad: The Specifics for Validating CMS DataThe Good vs. Bad: The Specifics for Validating CMS Data
The Good vs. Bad: The Specifics for Validating CMS DataAll4 Inc.
 
Benzene Fenceline Monitoring: An Introduction and What the Regulations Don’...
Benzene Fenceline Monitoring:  An Introduction and What the Regulations Don’...Benzene Fenceline Monitoring:  An Introduction and What the Regulations Don’...
Benzene Fenceline Monitoring: An Introduction and What the Regulations Don’...All4 Inc.
 
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...All4 Inc.
 

More from All4 Inc. (20)

Impacts of U.S. EPA Region 6 Guidance on CMS Downtime and Data Calculations
Impacts of U.S. EPA Region 6 Guidance on CMS Downtime and Data CalculationsImpacts of U.S. EPA Region 6 Guidance on CMS Downtime and Data Calculations
Impacts of U.S. EPA Region 6 Guidance on CMS Downtime and Data Calculations
 
Implementing a DAHS for Compliance with the Refinery Sector Rule
Implementing a DAHS for Compliance with the Refinery Sector RuleImplementing a DAHS for Compliance with the Refinery Sector Rule
Implementing a DAHS for Compliance with the Refinery Sector Rule
 
NSR Reform Updates
NSR Reform Updates NSR Reform Updates
NSR Reform Updates
 
Tceq recent permitting changes 4 c-2019-f_dougherty (1-31-19)
Tceq recent permitting changes 4 c-2019-f_dougherty (1-31-19)Tceq recent permitting changes 4 c-2019-f_dougherty (1-31-19)
Tceq recent permitting changes 4 c-2019-f_dougherty (1-31-19)
 
All4 impacts of recent u.s. epa region 6 guidance on cms downtime and data ...
All4   impacts of recent u.s. epa region 6 guidance on cms downtime and data ...All4   impacts of recent u.s. epa region 6 guidance on cms downtime and data ...
All4 impacts of recent u.s. epa region 6 guidance on cms downtime and data ...
 
D dix awma conference air toxics evaluation requirements 062718
D dix awma conference air toxics evaluation requirements 062718D dix awma conference air toxics evaluation requirements 062718
D dix awma conference air toxics evaluation requirements 062718
 
4 c nsr presentation 032318 all4 mccall
4 c nsr presentation 032318   all4 mccall4 c nsr presentation 032318   all4 mccall
4 c nsr presentation 032318 all4 mccall
 
All4 inc awma re-entrainment
All4 inc awma re-entrainmentAll4 inc awma re-entrainment
All4 inc awma re-entrainment
 
All4 tcc acit pres ipt guidance 2017
All4 tcc acit pres ipt guidance 2017All4 tcc acit pres ipt guidance 2017
All4 tcc acit pres ipt guidance 2017
 
Air Quality Compliance Training 12-8-16
Air Quality Compliance Training 12-8-16Air Quality Compliance Training 12-8-16
Air Quality Compliance Training 12-8-16
 
CEDRI-NextGen
CEDRI-NextGenCEDRI-NextGen
CEDRI-NextGen
 
understanding the validity and increased scrutiny of data used for compliance...
understanding the validity and increased scrutiny of data used for compliance...understanding the validity and increased scrutiny of data used for compliance...
understanding the validity and increased scrutiny of data used for compliance...
 
CUHMMC Presentation
CUHMMC PresentationCUHMMC Presentation
CUHMMC Presentation
 
Preview of ALL4 Air Quality Compliance - PIOGATech
Preview of ALL4 Air Quality Compliance - PIOGATechPreview of ALL4 Air Quality Compliance - PIOGATech
Preview of ALL4 Air Quality Compliance - PIOGATech
 
Top 5 Environmental Compliance Issues for Engineers and Managers
Top 5 Environmental Compliance Issues for Engineers and ManagersTop 5 Environmental Compliance Issues for Engineers and Managers
Top 5 Environmental Compliance Issues for Engineers and Managers
 
SO2 Data Requirements Rule Modeling Strategies
SO2 Data Requirements Rule Modeling StrategiesSO2 Data Requirements Rule Modeling Strategies
SO2 Data Requirements Rule Modeling Strategies
 
The complexities of new source review air permitting – a case study ddix 020116
The complexities of new source review air permitting – a case study ddix 020116The complexities of new source review air permitting – a case study ddix 020116
The complexities of new source review air permitting – a case study ddix 020116
 
The Good vs. Bad: The Specifics for Validating CMS Data
The Good vs. Bad: The Specifics for Validating CMS DataThe Good vs. Bad: The Specifics for Validating CMS Data
The Good vs. Bad: The Specifics for Validating CMS Data
 
Benzene Fenceline Monitoring: An Introduction and What the Regulations Don’...
Benzene Fenceline Monitoring:  An Introduction and What the Regulations Don’...Benzene Fenceline Monitoring:  An Introduction and What the Regulations Don’...
Benzene Fenceline Monitoring: An Introduction and What the Regulations Don’...
 
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
 

Recently uploaded

A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxBkGupta21
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 

Recently uploaded (20)

A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptx
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 

Boiler MACT and Strategic Air Permitting

  • 1. Boiler MACT and Strategic Air Permitting Presented to A&WMA Southern Section Annual Meeting and Technical Conference by All4 Inc. Mark Wenclawiak | mwenclawiak@all4inc.com | 678-460-0324 July 10, 2013 www.all4inc.com Kimberton, PA | 610.933.5246 Kennesaw, GA | 678.460.0324
  • 2. Outline  Drivers and tools • Boiler MACT • NSR Reform rules • Improve operational flexibility while decreasing actual emissions • Reduce operating and compliance costs • Timing: Outages? Agency processing? Procurement?  2 Case study • Existing Kraft mill – increase pulp production, BLS rate • Boiler conversion – multi-fuel to gas, limited coal • PSD avoidance; reduced Boiler MACT obligations Your environmental compliance is clearly our business.
  • 3. Boiler MACT and Strategic Air Permitting Drivers and Tools
  • 4. Drivers and Tools – Boiler MACT  Typical Boiler MACT project begins with: • • • •  Establishing your subcategory (initial notification) Fuels combusted and design type Design heat input capacity Annual heat input basis 12-months prior to compliance event Identify applicable emission limits • Install APC; TSM option; output based standards • Engineering testing for compliance strategy   Derating < 10 MMBtu/hr or retiring units Change fuel mix or introduce new fuels (e.g., TDF) • Our project: Accept limitation on fuel usage to switch subcategory, and generate actual emission decreases 4 Your environmental compliance is clearly our business.
  • 5. Drivers and Tools – NSR Reform  NSR reform allows creative accounting, particularly for existing emission units • Identify modified and affected units    Projects with boilers: Boilers; Woodyard; Fuel handling equipment Debottlenecking….More steam = more production? Baseline actual to projected actual test • Testing: Opportunity to re-establish baselines based on engineering testing for Boiler MACT compliance or other updated data • Historical factors < testing results = good thing 5 Your environmental compliance is clearly our business.
  • 6. Drivers and Tools – NSR Reform   If production increase project exceeds PSD significance, Boiler MACT project can provide contemporaneous decreases to net out of PSD (case study) Projected actual emissions • Consider multiple scenarios to maximum flexibility  Changes to types and rates of fuels and/or production materials • Excludable emissions – historical peak monthly levels during baseline • Remember timing: consider outage schedules, permit preparation and processing time, capital procurement process  6 New units more limited: based on potential to emit (PTE) • Consider air pollution control devices and fuel or production Your environmental compliance is clearly our business.
  • 7. Drivers and Tools – NSR Reform  Boiler MACT projects & contemporaneous decreases • • • •     7 Retired (past) units Shutdown currently permitted units Limited use units (e.g., change to a backup boiler) Be careful with contemporaneous PSD avoidance projects! Actual reductions to comply with MACT considered surplus for NSR netting and can be used (U.S. EPA memo) Source obligation tracking Are additional regulations triggered (e.g., NSPS)? Don’t forget about NAAQS considerations Your environmental compliance is clearly our business.
  • 8. Boiler MACT and Strategic Air Permitting Case Study
  • 9. Case Study  Existing unbleached Kraft pulp mill • Project to increase pulp production and BLS firing rate     Existing recovery furnace physically modified Affected sources: Recovery Area; Pulping System; Washing; Paper Machines; Woodyard Causticizing & kiln unaffected due to historical operations Baseline actual to projected actual emissions • Convert combination boiler to natural gas power boiler    9 Consider various scenarios of coal firing for backup fuel Annual capacity factor limitation Key to viability: contemporaneous decrease Your environmental compliance is clearly our business.
  • 10. Case Study  Current combination boiler • Coal, wood, natural gas, fuel oil • Existing source with respect to Boiler MACT   Coal/solid fossil fuel, stoker subcategories Natural gas conversion project • Natural gas and coal only  Coal limited to annual capacity factor <10% • Reclassified as Gas 2 (other) unit subcategory  10 Comparison of Boiler MACT emission limits Your environmental compliance is clearly our business.
  • 11. Case Study  Boiler MACT emission limits comparison Pollutant 1.7E-03 lb/MMBtu 5.7E-06 lb/MMBtu 7.9E-06 lb/MMBtu PM 4.0E-02 lb/MMBtu 6.7E-03 lb/MMBtu CO 11 2.2E-02 lb/MMBtu Hg  Gas 2 Subcategory HCl  Coal Subcategory 160 ppmvd @ 3% O2 130 ppmvd @ 3% O2 Testing for HCl, Hg, PM (coal); CO (gas) Fuel sampling limited to 100% coal firing scenario Your environmental compliance is clearly our business.
  • 12. Case Study  Existing emission units so….baseline actual emissions • NSR Reform     Consecutive 24-month period in 10-year look back Average annual rate for the 24-month period Influenced by use of non-natural gas fuels Projected actual emissions • Based on reduced coal usage and elimination of fuel oil and wood waste in boiler • Mill production levels based on maximum BLS firing with the maximum amount of natural gas firing • Maintain some backup fuel capacity with coal • Excludable emissions not considered to conservatively estimate projected actual emissions 12 Your environmental compliance is clearly our business.
  • 13. Case Study   Project related increases significant for VOC, NOX, PM, PM10, and PM2.5 Netting of contemporaneous projects • Decreases consisted of reductions attributable to boiler coal limitation • Decreases for all pollutants except VOC after netting (though VOC net increase not significant) • PSD avoided 13 Your environmental compliance is clearly our business.
  • 14. Boiler MACT and Strategic Air Permitting Conclusions
  • 15. Conclusions  Increase in production achieved • ~15% increase in BLS firing rate over current limit • ~25% increase in pulp production over current limit   PSD avoidance Simpler Boiler MACT obligations • No need for add-on control • Less complicated testing and fuel sampling requirements 15 Your environmental compliance is clearly our business.
  • 16. Questions and Open Discussions Mark Wenclawiak, CCM | mwenclawiak@all4inc.com | 678-460-0324 www.all4inc.com Kimberton, PA | 610.933.5246 Kennesaw, GA | 678.460.0324

Editor's Notes

  1. Thank you for the introduction and the opportunity to explore the topic of using Boiler MACT as one means for strategic NSR permitting. In this presentation we’ll give an overview of how a regulatory driver such as Boiler MACT can be used as a tool in combination with NSR permitting as a means to increase operational and permitting flexibility while decreasing actual emissions and reducing operating and compliance costs. Timing will be a critical component as part of the permitting. Can projects be implemented outside of outages? Does the permitting agency have the ability to process the application in time for boiler mact compliance? We’ll use an illustrative case study loosely based on an actual ALL4 project that involved an unnamed kraft mill that wanted to increase its pulp production and black liquor solids firing rate and was able to take advantage of a capital project to convert a multi fuel boiler (primarily coal) to a natural gas boiler with limited coal usage. Not only does this project enable the mill to increase production without triggering PSD but it also allows the mill to reduce its compliance obligations under boiler mact by changing the applicable subcategory of its boiler. First lets review some of the key drivers and tools this strategic air permitting approach.
  2. A typical boiler mact permitting project will begin with establishing the boiler’s subcategory. Now that the initial notification submittals are out of the way, it is likely that we know the appropriate subcategory for our boilers. However, as a refresher, remember that the subcategory is established based on the fuels combusted and the design type of the unit (such as a stoker or fluidized bed); the unit’s design heat input capacity (based on the name plate), and the calculated annual heat input using the fuel consumed in the 12 months before a compliance demonstration). Once the subcategory is established, the applicable emission limits can be identified, from which you can evaluate how you will comply with the limits (install APC; using the total selected metals options, emissions averaging, output based standards, etc.). This early step will likely require some form of engineering testing as part of your planning – we’ll also come back to this topic on the next slide. You can then explore the types of capital projects that are worthy of consideration such as derating your boiler below 10 MMBtu/hr to avoid emission limits, or retiring units altogether. Our project took another option, which was accepting a limitation on fuel usage to change the boiler’s subcategory and generate actual emission decreases, which is where our integration with NSR comes into play.
  3. The NSR reform rules allow some creative emissions accounting, particularly for existing emission units. The project begins with identifying the modified units (those that are physically modified as a part of the project) and the affected units (those that are impacted by the project through an increase in utilization). For projects involving a power boiler or other steam generating sources, the modified and affected units include boilers, the woodyard, and fuel handling equipment. Debottlenecking of upstream or downstream units, particularly as it relates to an increase in steam and allowing more production are all part of the equation. Remember our mention of engineering testing on the previous slide. Well the NSR reform baseline actual to project actual applicability test provides the potentialopportunity to re-establish baseline emissions using the results of that engineering testing for Boiler mact compliance. This is particularly useful when historical emissions were estimated on emission factors that were not representative of actual emissions, especially when the emission factors were lower that stack testing results. (Could go other way as well!)
  4. Remembering that your project will involve your boiler, and that you are aiming to substantially increase production ratessuch that your project emissions are significant with respect to PSD, the boiler mact compliance project can provide the contemporaneous decreases that will allow you to net out of PSD. We’ll explore this more as part of our case study. But at this point you can explore multiple scenarios to maximize operational and permitting flexibility based on fuel mixes or production materials. And remember, the NSR reform rules allow the consideration of excludable emissions, which are often based on the historical peak monthly production levels that occurred during the baseline period. We had timing on our opening slide. A reminder here is in order because of time constraints related to outage schedules, permit preparation and agency processing time, and the capital procurement process for items like air pollution control devices. The flexibility with new units is a bit more limited because emissions are based on potential to emit. However, all is not lost because as part of the project you can consider air pollution control devices, and fuel or production limitations to reduce the PTE.
  5. Boiler mact compliance projects such as the one we will describe next, can generate contemporaneous decreases that can allow facilities to avoid PSD . In particular, previously retired units, shutting down currently active but perhaps aging units, or changing the operating mode of a unit such as designated it as a backup boiler or limiting the amount and types of fuels used. As a note, the use of actual emission reductions generated by a MACT compliance project for NSR netting purposes is supported by U.S. EPA guidance. As part of the NSR reform permitting process, remember additional requirements that may be applicable as part of the project such as source obligation tracking for pollutants in which the net emission increase is at least 50% of the significance thresholds, as well as other regulations that may be triggered such as NSPS. Lastly, as with any projects nowadays, consider the impact to your facility’s naaqs compliance (and if you don’t know the status of your naaqs compliance, there is no time like the present to find out). With this theory behind us, let’s get into the case study ……
  6. Our case study is based on an existingunbleached kraft pulp mill. The project consisted of debottlenecking and increasing pulp production by modifying the Recovery furnace in order to increasethe BLS firing rate. In addition to the modified recovery furnaces, the affected sources in the project consisted of the woodyard, the recovery area, pulping system, washing and paper machines. Since the project was associated with existing emission units, the NSR reform rules allow the baseline actual to projected actual emissions to estimate the project emissions increases. (Note that causticizing area and lime kiln were unaffected due to historic operations.)The project also included the conversion of a combination boiler to a natural gas power boiler. The mill considered various scenarios of coal firing for a backup fuel and ultimately elected to accept an annual capacity factor limitation as part of the permitting strategy. This conversion project, as we will see, was the key to the viability of the production increase since it served as a contemporaneous decrease in the PSD emissions inventory process. Let’s get into some of the specifics of the boiler conversion project.
  7. The current combination boiler burns coal, wood, natural gas and fuel oil. As we relate back to our discussion on boiler mact and identifying your subcategory, this unit was an existing source in the coal/solid fossil fuel subcategory (based on fuel type) and stoker subcategory based on design type.Through the acceptance of an annual capacity factor on coal to less then 10%, the boiler was able to be re-categorized to a gas 2 unit. For boiler mact purposes, what is the difference? Let’s look at the emission limits to compare…..
  8. Here we have a comparison of the boiler mact emission limits, and we see that the emission limits outside of CO, are higher (less restrictive) for the gas 2 subcategory. The co emission limit is slightly lower for the gas 2 subcategory. Performance testing would be required for HCl, Hg, and PM while firing coal, and for CO while firing gasFuel sampling requirements would be limited to the coal firing scenarioLets take a look at the emissions inventory and how the mill benefited from the NSR reform rules
  9. Since our project consisted of existing units, we established baseline actual emissions using a consecutive 24-month period for each pollutant during a 10-year look back period. Because the historical use for this boiler was based on coal and bark, the baseline actual emissions were relatively higher than the projected actual emissions when firing predominantly or exclusively natural gas. Speaking of projected actual emissions, the mill considered scenarios in which coal usage was restricted, and bark and fuel oil were discontinued. Future production levels at the mill are directly related to it projected coal usage – in other words, the maximum amount of BLS that was proposed as an overall future mill production limit was based on the scenario with the maximum amount of natural gas firing. The mill wanted to maintain a backup fuel in some capacity so ultimately the mill accepted a coal limitation such that the annual capacity factor remains below 10%. As we mentioned previously, the nsr reform rules include the concept of excludable emissions. For our situation, we did not consider excludable emissions to conservatively estimate projected actual emissions.
  10. The resulting emissions inventory for the project showed significant increases for VOC, NOX, pm, PM10, and PM2.5. Since the project related increases were significant for these pollutants, the netting provisions of PSD applicability were triggered to evaluate if a significant net emissions increase would occur. This second step invokes the consideration of contemporaneous (those within the past 5 years) increases and decreases. The boiler conversion project served as the contemporaneous decrease for the inventory, resulting in emissions after netting for all pollutants that were less than the baseline actual emissions (except for VOC, which had net emissions that exceeded baseline emissions but importantly, were less than the 40 tpy significance threshold for PSD). Therefore, PSD was avoided for this project that ultimately increased production at the Mill. Caution again with contemporaneous projects that used actual to projected actual.
  11. In summary, the mill was able to achieve an approximately 15% increase in its BLS firing rate and a greater than 25% increase in pulp production all while using boiler mact and the nsr reform rules to its advantage. The mill was able to avoid PSD and will be able to simplify its boiler mact obligations (higher emissions limits, no need for add on controls, less complicated testing and fuel sampling)