Oil and Gas 75 Workshop Ana Paula Brambila Sep 2012

2,317 views
2,167 views

Published on

Published in: Business, Economy & Finance
0 Comments
2 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
2,317
On SlideShare
0
From Embeds
0
Number of Embeds
13
Actions
Shares
0
Downloads
292
Comments
0
Likes
2
Embeds 0
No embeds

No notes for slide

Oil and Gas 75 Workshop Ana Paula Brambila Sep 2012

  1. 1. Maximo Product Overview Maximo Oil and Gas 7.5 © 2009 IBM Corporation
  2. 2. Maximo Oil & GasAgenda O&G - Product Overview Installation and Dependencies Description of O&G Main Applications Summary of Differences from O&G and HSE References © 2011 IBM Corporation
  3. 3. Maximo Oil & GasIBM Maximo for Oil & Gas IBM Maximo for Oil & Gas helps manage assets, work and safety process related toO&G industry. IBM Maximo for Oil & Gas provides means for O&G companies to follow best practices to help improve the productivity and efficiency of their critical assets. Addresses the specialized needs of the oil & gas industry such as – failure codes, asset specifications, location details, prioritization matrix, regulatory compliance, and condition for work. Manages assets with a single approach. Manages each asset’s life cycle including acquisition, work management, inventory control, purchasing, and preventive maintenance. © 2011 IBM Corporation
  4. 4. Maximo Oil & GasProduct Overview - Integrated operations and maintenance process architecture Enterprise Capital Engineering Geo-Based Process Document Financials Projects Systems Systems Control Sys Management Open, Standards Integration / Interoperability Framework Defect Incident Service Condition Preventive Elimination Management Request Monitoring Maintenance Operations Change Investigations / Maintenance Asset MRO Knowledge Control of Work Compliance Management Management Improvements Management Management Supply Chain Management Management Hazards/Precautio MRO Contract Operator Log Investigations Work Prioritization Locations Regulations Solution Search Of Change ns Management Operating Risk Continuous Condition For MRO Persons/Competen MOC Request Assets Bulletin Board Procedures Matrix Improvement Work Purchasing cy Risk After Action Inventory LessonsOperator Tasks Job Planning Operating Policy Non Conformance Assessments Review Management Learned Permit / Cert Linear AssetLoss Reporting RCFA/FMECA Work Orders Invoicing Asset List Solutions Planning Management Material Action Run Log Scheduler Inspections Tracking Drilling and Standard Invoicing Actions/Groups Completions Integrated Operations and Maintenance Spatial / Mobile / Remote Offline Applications Integrated Operations and Maintenance Scheduling Integrated Operations and Maintenance Reporting / Analytics © 2011 IBM Corporation
  5. 5. Maximo Oil & GasIntegrated process © 2011 IBM Corporation
  6. 6. Maximo Oil & GasIBM Maximo for Oil & Gas Customer Update ADCO BP Zadco Shell Bluewater Placid Refining SouthWestern Energy Pearl Oil Petroci Williams Production OMV Flint Hills Resources Pasadena Refining Technip Cornhusker Burren Energy NCRA Korea National Oil Co Talisman Energy Applied Petroleum Resources Centrica Storage Repsol Alinta Taqa PlusPetrol Williams Midstream Sonatrach/Statoil/BP FPCC Takreer Trilogy Energy BG Baker Hughes Sunoco Skangass Gulf Drilling Petroamazonas Pharoanic Petroleum Kuwait Oil Company Atwood Oceanics ADWEA CNRL Mosaic © 2011 IBM Corporation Note: Partial list of customers
  7. 7. Maximo Oil & GasInstallation and DependenciesInstallation is carried out on top of Maximo in the same way as any other Add-OnMake sure latest cumulative hot fixes are installed including those for other IndustrySolutions to be installed.There are no additional hardware requirements for Maximo for Oil and Gas over andabove standard Maximo requirements.Requires Maximo Asset Management 7.5.0Environments – fully supported on SQL Server, Oracle, DB2.Environments – fully supported on WebSphere and WebLogic.Environments – fully supported on same operating systems as standard Maximo. © 2011 IBM Corporation Note: Partial list of customers
  8. 8. Maximo Oil & GasInvestigations / Improvements Enterprise Capital Engineering Geo-Based Process Document Financials Projects Systems Systems Control Sys Management Open, Standards Integration / Interoperability Framework Defect Incident Service Condition Preventive Elimination Management Request Monitoring Maintenance Operations Change Investigations / Maintenance Asset MRO Knowledge Control of Work Compliance Management Management Improvements Management Management Supply Chain Management Management Hazards/Precautio MRO ContractOperator Log Investigations Work Prioritization Locations Regulations Solution Search Of Change ns Management Operating Risk Continuous Condition For MRO Persons/Competen MOC Request Assets Bulletin Board Procedures Matrix Improvement Work Purchasing cy Risk After Action Inventory LessonsOperator Tasks Job Planning Operating Policy Non Conformance Assessments Review Management Learned Permit / Cert Linear AssetLoss Reporting RCFA/FMECA Work Orders Invoicing Asset List Solutions Planning Management Material Action Run Log Scheduler Inspections Tracking Drilling and Standard Invoicing Actions/Groups Completions Integrated Operations and Maintenance Spatial / Mobile / Remote Offline Applications Integrated Operations and Maintenance Scheduling Integrated Operations and Maintenance Reporting / Analytics © 2011 IBM Corporation
  9. 9. Maximo Oil & GasIncidents (Oil) What is it? – An application to record incidents occurring during plant operation and maintenance Use cases – Failure of an isolation valve on a separator vessel causes a loss of containment. Standard operating procedures require an Incident to be raised and the cause of the containment incident identified Business Value – Improved process safety management © 2011 IBM Corporation
  10. 10. Maximo Oil & GasIncidents (Oil) © 2011 IBM Corporation
  11. 11. Maximo Oil & GasDefects (Oil) What is it? – A defect reporting and tracking application Use cases – Operator notices a generator cooling system running hot at 40 degrees higher than design temperature. Is concerned that this could impact long term reliability of the generator and raises a defect Business Value – Drives enhanced maintenance and operational performance © 2011 IBM Corporation
  12. 12. Maximo Oil & GasDefects (Oil) © 2011 IBM Corporation
  13. 13. Maximo Oil & GasInvestigations (Oil) What is it? – Supports investigations of incidents or defects – A problem may be the result of one or many incidents Use cases – Could be initiated from an incident that requires further investigation into the cause of the incident Business value – Improved process safety management – A mechanism for initiating the recording of lessons learned by an organization © 2011 IBM Corporation
  14. 14. Maximo Oil & GasInvestigations (Oil) © 2011 IBM Corporation
  15. 15. Maximo Oil & GasCause Analysis and FMECA What is it? – Extensions to the existing Investigations application to support cause analysis and Failure Mode Effect and Criticality Analysis (FMECA) Use Cases – Conduct a 5 Whys root cause analysis against an investigation – Add a FMECA to an investigation – Document a cause and effect analysis within Maximo Business Value – Closely link analysis with follow up action – Reduces need for additional specialist applications © 2011 IBM Corporation
  16. 16. Maximo Oil & GasCause Analysis tab © 2011 IBM Corporation
  17. 17. Maximo Oil & GasRisk Matrices What Is It? – Modelling of probability and consequences of events – Configurable by severity – Safety, environmental, asset – Works integrated with risk assessment application Use cases – Models a company risk matrix to determine risk ranking – A customer wants to drive priority of work based on probability of an event occurring and the consequences of the event eg RBI Business value – Improves the accuracy and consistency of risk assessment by using pre- built matrices – Leads to improved risk management © 2011 IBM Corporation
  18. 18. Maximo Oil & GasSample Consequence record © 2011 IBM Corporation
  19. 19. Maximo Oil & GasControl of Work Enterprise Capital Engineering Geo-Based Process Document Financials Projects Systems Systems Control Sys Management Open, Standards Integration / Interoperability Framework Defect Incident Service Condition Preventive Elimination Management Request Monitoring Maintenance Operations Change Investigations / Maintenance Asset MRO Knowledge Control of Work Compliance Management Management Improvements Management Management Supply Chain Management Management Hazards/Precautio MRO ContractOperator Log Investigations Work Prioritization Locations Regulations Solution Search Of Change ns Management Operating Risk Continuous Condition For MRO Persons/Competen MOC Request Assets Bulletin Board Procedures Matrix Improvement Work Purchasing cy Risk After Action Inventory LessonsOperator Tasks Job Planning Operating Policy Non Conformance Assessments Review Management Learned Permit / Cert Linear AssetLoss Reporting RCFA/FMECA Work Orders Invoicing Asset List Solutions Planning Management Material Action Run Log Scheduler Inspections Tracking Drilling and Standard Invoicing Actions/Groups Completions Integrated Operations and Maintenance Spatial / Mobile / Remote Offline Applications Integrated Operations and Maintenance Scheduling Integrated Operations and Maintenance Reporting / Analytics © 2011 IBM Corporation
  20. 20. Maximo Oil & GasHazards (Oil) What is it? – Oil and gas version of Hazards that adds new fields to support regulations, certifications and classifications Use cases – Identify the hazards and the precautions associated. Business value – Improved process safety management © 2011 IBM Corporation
  21. 21. Maximo Oil & GasHazards (Oil) © 2011 IBM Corporation
  22. 22. Maximo Oil & GasRisk Assessment What is it? – Provides the ability to conduct and record risk assessments Use cases – Job Safety Analysis – Assess risk associated with Work Orders, Job Plans, Incidents, Investigations, Management of Change Business value – Improved process safety management – Earlier identification of risk © 2011 IBM Corporation
  23. 23. Maximo Oil & GasRisk Assessment © 2011 IBM Corporation
  24. 24. Maximo Oil & GasRisk Assessment on job plans © 2011 IBM Corporation
  25. 25. Maximo Oil & GasRisk Assessment on Job Plan tasks © 2011 IBM Corporation
  26. 26. Maximo Oil & GasRisk Assessment on Work Order Tracking © 2011 IBM Corporation
  27. 27. Maximo Oil & GasRisk Assessment on Work Order tasks © 2011 IBM Corporation
  28. 28. Maximo Oil & GasRisk Assessment on Incidents © 2011 IBM Corporation
  29. 29. Maximo Oil & GasRisk Assessment on Investigations © 2011 IBM Corporation
  30. 30. Maximo Oil & GasRisk Assessment on Locations © 2011 IBM Corporation
  31. 31. Maximo Oil & GasPrioritization Matrix What is it? – A matrix based system of work or risk prioritization Use cases – Customers need to evaluate whether work needs to be carried out within say 24 hours, 3 days, or 1 week, based on the type of work to be performed, function and asset or location priority criteria – Implements the Ranking Index for Maintenance Expenditure (RIME) method of work prioritization Business Value – Ensures that critical assets are given priority maintenance – Takes the emotion out of criticality decisions © 2011 IBM Corporation
  32. 32. Maximo Oil & GasSample Prioritization Matrix Reason for Work RFW6 RFW5 RFW4 RFW3 Imminent Safety Environment Routine Danger Asset/Loc Matrix Matrix Matrix Matrix Matrix Matrix Matrix Matrix Index Priority Index Priority Index Priority Index Priority Priority 5 78 5 65 4 58 4 50 3 4 77 5 59 4 51 3 45 2 3 76 5 52 3 41 3 38 2 2 75 5 45 3 39 2 36 1 1 74 5 40 3 37 2 35 1 © 2011 IBM Corporation
  33. 33. Maximo Oil & GasPrioritization Matrix – Reason For Work tab © 2011 IBM Corporation
  34. 34. Maximo Oil & GasPrioritization Matrix – additions to Work Orders © 2011 IBM Corporation
  35. 35. Maximo Oil & GasImprovements What is it? – An application to record suggestions for improvements to plant operation and maintenance – Supports Six Sigma or similar methodologies Use cases – Could arise from a defect identified by a maintenance technician or operator – Could be initiated from a Problem that requires improvement action to address the cause Business value – A mechanism to drive continuous improvement © 2011 IBM Corporation
  36. 36. Maximo Oil & GasImprovements © 2011 IBM Corporation
  37. 37. Maximo Oil & GasImprovements – Plans Tab © 2011 IBM Corporation
  38. 38. Maximo Oil & GasPermit and Certificate Types What is it? – Provides the capability to define permit types and certificates for use on job plans, work orders and people applications Use cases – Permit planning – Personal certifications Business value – Ability to support planning of permits – Improved management of competency © 2011 IBM Corporation
  39. 39. Maximo Oil & GasPermit and Certificate Types (Oil) © 2011 IBM Corporation
  40. 40. Maximo Oil & GasJob Plans (Oil) Control of Work sub tab © 2011 IBM Corporation
  41. 41. Maximo Oil & GasJob Plans (Oil) Task © 2011 IBM Corporation
  42. 42. Maximo Oil & GasWork Order Tracking (Oil) © 2011 IBM Corporation
  43. 43. Maximo Oil & GasOperations Management Enterprise Capital Engineering Geo-Based Process Document Financials Projects Systems Systems Control Sys Management Open, Standards Integration / Interoperability Framework Defect Incident Service Condition Preventive Elimination Management Request Monitoring Maintenance Operations Change Investigations / Maintenance Asset MRO Knowledge Control of Work Compliance Management Management Improvements Management Management Supply Chain Management Management Hazards/Precautio MRO ContractOperator Log Investigations Work Prioritization Locations Regulations Solution Search Of Change ns Management Operating Risk Continuous Condition For MRO Persons/Competen MOC Request Assets Bulletin Board Procedures Matrix Improvement Work Purchasing cy Risk After Action Inventory LessonsOperator Tasks Job Planning Operating Policy Non Conformance Assessments Review Management Learned Permit / Cert Linear AssetLoss Reporting RCFA/FMECA Work Orders Invoicing Asset List Solutions Planning Management Material Action Run Log Scheduler Inspections Tracking Drilling and Standard Invoicing Actions/Groups Completions Integrated Operations and Maintenance Spatial / Mobile / Remote Offline Applications Integrated Operations and Maintenance Scheduling Integrated Operations and Maintenance Reporting / Analytics © 2011 IBM Corporation
  44. 44. Maximo Oil & GasOperators Log What is it? – An application used by shift operators to record logs Use cases – Use to record events associated with a shift – Downtime and meter recording – Tracks personnel on shift Business value – Improved coordination between operations and maintenance – Enhanced organizational learning © 2011 IBM Corporation
  45. 45. Maximo Oil & GasOperators Log - Shift Log tab and Shift Team sub tab © 2011 IBM Corporation
  46. 46. Maximo Oil & GasOperators Log - Typical log entry © 2011 IBM Corporation
  47. 47. Maximo Oil & GasOperators Log - Production Loss tab © 2011 IBM Corporation
  48. 48. Maximo Oil & GasOperators Log - Create Incident © 2011 IBM Corporation
  49. 49. Maximo Oil & GasRun Log What is it? – Application to provide a log for activities associated with drilling, production wells and process plant production data. Use Cases – User reports an incident associated with a downhole tool – Reporting daily production data for a well – Reporting data associated with a production run on process plant Business Value – Supports integrated operations between drilling, operations and maintenance – Leverage existing Maximo infrastructure for wells and downhole equipment © 2011 IBM Corporation
  50. 50. Maximo Oil & GasRun Log (Oil) © 2011 IBM Corporation
  51. 51. Maximo Oil & GasOperating Policies What is it? – Application to identify operating and maintenance strategies and link these to maintenance actions and operating procedures Use Cases – Set up a Performance Standard and link to assurance activities – Use to highlight a strategy driven by reliability centered maintenance – Identify assets maintained using risk based inspection techniques Business Value – Supports compliance by clearly linking strategy basis to specific assets/locations – Avoid the need for additional external applications to track maintenance strategy © 2011 IBM Corporation
  52. 52. Maximo Oil & GasOperating Policy © 2011 IBM Corporation
  53. 53. Maximo Oil & GasOperating Policies © 2011 IBM Corporation
  54. 54. Maximo Oil & GasOperating Procedures What is it? – Application to document operating procedures within Maximo and link them to operating policy Use Cases – Assign an operating procedure against a task carried out by operations – Add an operating procedure to a Job Plan task Business Value – Integrated procedures shared by maintenance and operations – Improved procedural compliance © 2011 IBM Corporation
  55. 55. Maximo Oil & GasOperating Procedures © 2011 IBM Corporation
  56. 56. Maximo Oil & GasOperating procedure lines © 2011 IBM Corporation
  57. 57. Maximo Oil & GasOperator Tasks What is it? – An application to support and view operator maintenance tasks Use Cases – Add operator driven tasks Business Value – Simplifies operator access to maintenance tasks allocated to operations © 2011 IBM Corporation
  58. 58. Maximo Oil & GasOperator Tasks (Oil) © 2011 IBM Corporation
  59. 59. Maximo Oil & GasDrilling and Completion What is it? – Application to support work associated with drilling and completing a well Use Cases – Use to set up all drilling activities associated with a well – Construction and completion activities associated with a well – In conjunction with Maximo Scheduler, show a Gantt chart of drilling schedule Business Value – Supports integrated operations between drilling, operations and maintenance – Use of Maximo existing infrastructure for wells and downhole equipment © 2011 IBM Corporation
  60. 60. Maximo Oil & GasDrilling and Completion main tab © 2011 IBM Corporation
  61. 61. Maximo Oil & GasSupport for IS014224 (2006)/API 689 What is it? – Updates existing Failure Codes and Asset Specification applications with ISO14224/API 689 data Use cases – Customer already using ISO14224 (1999) wants to start using latest ISO14224 (2006) data – New customer wants to utilise latest international standard for failure reporting Business value – More consistent failure reporting – Improved availability of plant © 2011 IBM Corporation
  62. 62. Maximo Oil & GasOrganizations (Oil) © 2011 IBM Corporation
  63. 63. Maximo Oil & GasFailure Codes What is it? – Contains the ISO 14224 (API 689) failure classes, problem, cause and remedy tables for each equipment type listed in the standard Use Cases – New oil and gas customer does not have standard failure classes and problem, cause, remedy structure. Wishes to use international standards – Existing customer not using MAXIMO failure reporting capability and wishing to do so. Business Value – Time take to gather and load failure classes, problems, causes and remedies would be significantly greater than cost of solution – Without standardized failure data, cannot implement reliability analysis © 2011 IBM Corporation
  64. 64. Maximo Oil & GasSample ISO14224/API689 Failure Codes © 2011 IBM Corporation
  65. 65. Maximo Oil & GasAsset Specifications What is it? – Contains the ISO 14224 (API 689) Equipment Unit Subdivision and Equipment Unit specific data tables for every equipment type listed in the standard Use cases – New Oil and gas customer does not have standard asset specification templates for locations or equipment. Wishes to use international standards – Existing customer not using MAXIMO asset catalog capability and wishing to do so with an industry standard methodology Business Value – Time take to gather and load asset specifications would be significantly greater than cost of solution – Standardized asset specifications facilitate comparisons of equipment performance © 2011 IBM Corporation
  66. 66. Maximo Oil & GasChange Management Enterprise Capital Engineering Geo-Based Process Document Financials Projects Systems Systems Control Sys Management Open, Standards Integration / Interoperability Framework Defect Incident Service Condition Preventive Elimination Management Request Monitoring Maintenance Operations Change Investigations / Maintenance Asset MRO Knowledge Control of Work Compliance Management Management Improvements Management Management Supply Chain Management Management Hazards/Precautio MRO ContractOperator Log Investigations Work Prioritization Locations Regulations Solution Search Of Change ns Management Operating Risk Continuous Condition For MRO Persons/Competen MOC Request Assets Bulletin Board Procedures Matrix Improvement Work Purchasing cy Risk After Action Inventory LessonsOperator Tasks Job Planning Operating Policy Non Conformance Assessments Review Management Learned Permit / Cert Linear AssetLoss Reporting RCFA/FMECA Work Orders Invoicing Asset List Solutions Planning Management Material Action Run Log Scheduler Inspections Tracking Drilling and Standard Invoicing Actions/Groups Completions Integrated Operations and Maintenance Spatial / Mobile / Remote Offline Applications Integrated Operations and Maintenance Scheduling Integrated Operations and Maintenance Reporting / Analytics © 2011 IBM Corporation
  67. 67. Maximo Oil & GasManagement of Change What Is It? – An application to support management of changes process cycle, from request to closure Use cases – Management of engineering and plant change requests – Management of change associated with deferred work Business value – Greater process conformity through integration with work management process – Improves communication between operations and maintenance © 2011 IBM Corporation
  68. 68. Maximo Oil & GasFull Cycle MOC MOC Details Risks and Projects Review Approve Pre-MOC actions Authorize Post-MOC actions Closure © 2011 IBM Corporation
  69. 69. Maximo Oil & GasManagement of Change Request screenshot © 2011 IBM Corporation
  70. 70. Maximo Oil & GasManagement of Change – Main tab © 2011 IBM Corporation
  71. 71. Maximo Oil & GasManagement of Change – Risk and Project © 2011 IBM Corporation
  72. 72. Maximo Oil & GasManagement of Change – Review and Approval © 2011 IBM Corporation
  73. 73. Maximo Oil & GasManagement of Change – Pre Start © 2011 IBM Corporation
  74. 74. Maximo Oil & GasManagement of Change - Authorize © 2011 IBM Corporation
  75. 75. Maximo Oil & GasManagement of Change – Post-Start © 2011 IBM Corporation
  76. 76. Maximo Oil & GasManagement of Change – Closure © 2011 IBM Corporation
  77. 77. Maximo Oil & GasCompliance Enterprise Capital Engineering Geo-Based Process Document Financials Projects Systems Systems Control Sys Management Open, Standards Integration / Interoperability Framework Defect Incident Service Condition Preventive Elimination Management Request Monitoring Maintenance Operations Change Investigations / Maintenance Asset MRO Knowledge Control of Work Compliance Management Management Improvements Management Management Supply Chain Management Management Hazards/Precautio MRO ContractOperator Log Investigations Work Prioritization Locations Regulations Solution Search Of Change ns Management Operating Risk Continuous Condition For MRO Persons/Competen MOC Request Assets Bulletin Board Procedures Matrix Improvement Work Purchasing cy Risk After Action Inventory LessonsOperator Tasks Job Planning Operating Policy Non Conformance Assessments Review Management Learned Permit / Cert Linear AssetLoss Reporting RCFA/FMECA Work Orders Invoicing Asset List Solutions Planning Management Material Action Run Log Scheduler Inspections Tracking Drilling and Standard Invoicing Actions/Groups Completions Integrated Operations and Maintenance Spatial / Mobile / Remote Offline Applications Integrated Operations and Maintenance Scheduling Integrated Operations and Maintenance Reporting / Analytics © 2011 IBM Corporation
  78. 78. Maximo Oil & GasAction Tracking What is it? – A way of following up Actions arising from Investigations or Improvements – A means of tracking Actions agreed with regulatory authorities or internal review teams Use cases – A HSE audit is carried out on an offshore oil platform. As a result of this audit a number of actions are required to maintain the platforms license to operate. These actions must be tracked and reported on within a specified time period – A Safety Notification is received which requires completion of a survey and review of all balanced bellows pressure relief valves by a specified date Business Value – Drives implementation of business critical actions © 2011 IBM Corporation
  79. 79. Maximo Oil & GasAction Tracking © 2011 IBM Corporation
  80. 80. Maximo Oil & GasStandard Actions What Is It? – An application to manage standard actions that can be associated with management of change processes and standard checklists Use cases – Create pre and post MOC type actions that can be listed in the Management of Change application – Use to create standard checklists that can be associated with work carried out in Maximo Business value – Provides greater process conformity through use of standard actions and checklists © 2011 IBM Corporation
  81. 81. Maximo Oil & GasStandard Actions © 2011 IBM Corporation
  82. 82. Maximo Oil & GasRegulatory Compliance What is it? – Provides ability to hold details of regulations relevant to work carried out in Maximo, and relate these regulations to both work planned in Maximo and actual work carried out Use cases – Provide documented proof that work carried out in Maximo was completed based on the required regulation – Provides the ability to demonstrate compliance with many statutory requirements covering safety, health and environment Business Value – Identifies compliance with relevant regulations – Simplifies work required to demonstrate compliance © 2011 IBM Corporation
  83. 83. Maximo Oil & GasRegulatory Compliance main tab © 2011 IBM Corporation
  84. 84. Maximo Oil & GasRegulatory Compliance tab on Locations © 2011 IBM Corporation
  85. 85. Maximo Oil & GasRegulatory Compliance tab on Work Orders © 2011 IBM Corporation
  86. 86. Maximo Oil & GasRegulatory Compliance - ‘Where Used’ tab © 2011 IBM Corporation
  87. 87. Maximo Oil & GasCondition for Work What is it? – Establish the conditions necessary before work can commence e.g. plant shutdown, train shutdown, unit shutdown, isolated, depressurized,…. Use cases – A common element of the work planning process in downstream and offshore oil and gas Business Value – Supports planning of work associated with common plant – Facilitates opportunity maintenance © 2011 IBM Corporation
  88. 88. Maximo Oil & GasCondition for Work main tab © 2011 IBM Corporation
  89. 89. Maximo Oil & GasCondition For Work field on Job Plans © 2011 IBM Corporation
  90. 90. IBM - Maximo Health, Safety and Environment ManagerMaximo HSE Manager © 2009 IBM Corporation
  91. 91. Summary of Differences from Oil and Gas 7.5.0 to HSE Manager 7.5.0 Drilling and Completion application removed Run Log application removed ISO14224 Failure Code and Asset Specification loading dialogs removed from Organizations (HSE) List Tab ISO14224 Taxonomy section removed from Locations (HSE) Operating Context tab All references to (Oil) changed to (HSE) on application screens and menus September 13, © 2009 IBM Corporation 2012
  92. 92. ReferencesInformation center is at:http://publib.boulder.ibm.com/infocenter/tivihelp/v49r1/topic/com.ibm.hse.doc/welcome.html – The Welcome page contains links to the Installation Guide to the Quick Start Guide, and to application help. – The Reference section of the Information Center contains detailed information on integration error messages.From Maximo on IBM.com: – http://www.ibm.com/software/tivoli/products/maximo-health-safety-environment – Click Product documentation September 13, © 2009 IBM Corporation 2012
  93. 93. ContactsMarcos Paulo Salvador de OliveiraAna Paula Brambila September 13, © 2009 IBM Corporation 2012
  94. 94. Dúvidas?September 13, © 2009 IBM Corporation2012

×