Screens, Snow, & Recycling -- Extreme programming, taken literally
by alexandros_rm on Jan 31, 2013
- 1,607 views
Description of a 4-day sprint during which a small team pulled off a switchover of a large system deployed in the heart of London
Description of a 4-day sprint during which a small team pulled off a switchover of a large system deployed in the heart of London
Accessibility
Categories
Upload Details
Uploaded via SlideShare as Adobe PDF
Usage Rights
© All Rights Reserved
Statistics
- Likes
- 3
- Downloads
- 0
- Comments
- 0
- Embed Views
- Views on SlideShare
- 1,582
- Total Views
- 1,607