Description of a 4-day sprint during which a small team pulled off a switchover of a large system deployed in the heart of London

Description of a 4-day sprint during which a small team pulled off a switchover of a large system deployed in the heart of London

Published in Technology
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
No Downloads

Views

Total Views
2,192
On SlideShare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
0
Comments
0
Likes
4

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Screens, Snow, Recycling
  • 2. Hi!
  • 3. Hi! That’s me
  • 4. Hi!And this here is myco-founder, Pagan
  • 5. Victim #1Saturday Morning
  • 6. So we loaded up the USB… …and got to work
  • 7. Fail fast and iterate
  • 8. Fail fast and iterate
  • 9. Back to the drawing board burning .ISO files at the local McDonald’s
  • 10. And then, there was(some) light
  • 11. By the end of the day, productivity andtemperature dropped.
  • 12. …and morale.
  • 13. Saturday Night
  • 14. Round 1:Pods kinda done - 3Pods not done - 10
  • 15. Sunday Morning
  • 16. Then came doorknob…
  • 17. We spent half Sunday
  • 18. But the next one worked
  • 19. ✓X X
  • 20. Are you sure?
  • 21. Let’s do this!
  • 22. Success!
  • 23. More success!
  • 24. Wait a minute...
  • 25. More success still…
  • 26. Back in the Bat-cave
  • 27. And the answer is... It worked! (see those little green dots?)
  • 28. Follow me at:@alexandrosM