Standards update to    PCIM Group &National Vendor Forum      April 2013
2
pharmacy shared care · NZePS  e-discharge · interRAI · ePRF         ECGs · patient portals          R-CDR
4
HISO Work Plan 2013                  5
Priority 1            NZ Health Data Set  Continuum of Care · NZPOCSHealth Identity · Palliative Care    interRAI · R-CDRs...
Priority 2disabilities ref set · e-prescribing     GP2GP · maternity data set     e-forms · cancer specialties            ...
10049 VC equipment - final10046 NHI - public comment May10047 interRAI - public comment10043 CDA - public comment10045 HPI...
10023 PRIMHD - parked10004 NZPOCS - review started10008 Path and Rad - review started10030 ePharmaceutical10037 Connect He...
Summer of CDA                10
HISO 10040Reference Architecture for  Interoperability Part 2                             11
NZePS + GP2GP 10041.1 Referral Requests.2 Shared Health Summaries     .3 Medications Lists  .4 Discharge Summaries        ...
13
R-CDR 14
Integration testing     platform                      15
Certification                16
Upcoming SlideShare
Loading in …5
×

New Zealand e-health standards agenda 2013

387 views
269 views

Published on

Published in: Health & Medicine, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
387
On SlideShare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • EMR Adoption Model (EMRAM) for uptake of HIT within the hospital. There are 8 stages, with the topmost being a fully paperless environment. Below this, physician documentation / charting (structured templates), full CDSS and closed loop medication administration environment are fully implemented.Electronic Medical Record Adoption Model – a structured assessment developed by HIMSS Analytics to measure hospital progress towards full electronic system rollout.NHITB will coordinate EMRAM assessments that benchmark New Zealand hospitals against similarly sized hospitals globally. All hospitals in the US, along with most Canadian and European hospitals, have completed EMRAM assessments. DHBs are keen to participate, and results available to date indicate New Zealand hospitals compare well globally.To progress from one stage of adoption to the next, a hospital must have implemented everything at the preceding levelScores go to 4 decimal places, depending on achievements at higher levels (which makes big jumps possible)
  • Another tricky case – prescription for antibiotics attached to a cellulitis referral
  • New Zealand e-health standards agenda 2013

    1. 1. Standards update to PCIM Group &National Vendor Forum April 2013
    2. 2. 2
    3. 3. pharmacy shared care · NZePS e-discharge · interRAI · ePRF ECGs · patient portals R-CDR
    4. 4. 4
    5. 5. HISO Work Plan 2013 5
    6. 6. Priority 1 NZ Health Data Set Continuum of Care · NZPOCSHealth Identity · Palliative Care interRAI · R-CDRs · EDIT NZ 6
    7. 7. Priority 2disabilities ref set · e-prescribing GP2GP · maternity data set e-forms · cancer specialties dental data set7
    8. 8. 10049 VC equipment - final10046 NHI - public comment May10047 interRAI - public comment10043 CDA - public comment10045 HPI - development10048 ED workflow - development 8
    9. 9. 10023 PRIMHD - parked10004 NZPOCS - review started10008 Path and Rad - review started10030 ePharmaceutical10037 Connect Health network 9
    10. 10. Summer of CDA 10
    11. 11. HISO 10040Reference Architecture for Interoperability Part 2 11
    12. 12. NZePS + GP2GP 10041.1 Referral Requests.2 Shared Health Summaries .3 Medications Lists .4 Discharge Summaries 12
    13. 13. 13
    14. 14. R-CDR 14
    15. 15. Integration testing platform 15
    16. 16. Certification 16

    ×