MEASUREMENT OF QUANTITIES




                     ● Mat Naim bin Abdullah @ Mohd Asmoni
                     ● Diploma QS (UTM), BSc. QS (Glasgow
                         Caledonian University), M.Eng. Construction
                         (UTM), PhD Facilities Management (UTM)
                     ●   matnaim@utm.my
                     ●   amn871969@yahoo.com
                     ●   C04-308
                     ●   019-7573760




        www.utm.my              innovative ● entrepreneurial ● global   1
MEASUREMENT OF QUANTITIES


Assumption No. 1:       Total land area = 10m x 10m




                                  Project Title: Construction and completion of
                                  guard house
                                  Owner: Panicsonic Sdn Bhd
                                  Architect: A to Z Sdn Bhd
                                  Drawing Title: Ground beam and foundation plan
                                  -------------------------------------------------------------------------
                                  Drawn by: Sheila
                                  Checked by: Aaron




           www.utm.my            innovative ● entrepreneurial ● global                                        2
MEASUREMENT OF QUANTITIES




        www.utm.my          innovative ● entrepreneurial ● global   3
MEASUREMENT OF QUANTITIES

                      Construction Method

 1.    Preliminaries (Initial site works) - % of total cost
 2.    Site clearance and earthwork
 3.    Foundation construction (E.g. Piling and footing)
 4.    Work below lowest floor finish
 5.    Frame
 6.    Staircase
 7.    Upper Floor
 8.    Roof
 9.    Wall and partition
 10.   Door and window
 11.   Finishes
 12.   Sundries (Built-in furniture)
 13.   Building services (M&E, ICT etc)
 14.   External works (Water reticulation, landscape etc)



              www.utm.my                  innovative ● entrepreneurial ● global   4
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

1) Site clearance

1.1) Clear the site including grubbing of Area of the site:
     trees, shrubs and demolish any       10 x 10 = 100m2
     existing structure and cart away
     and dump to the specified
     location.

      10.00
      10.00
     ----------
     100.00          100 m2
     ----------




                    www.utm.my                  innovative ● entrepreneurial ● global   5
MEASUREMENT OF QUANTITIES




        www.utm.my          innovative ● entrepreneurial ● global   6
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation

2.1) Piling including all related works   Area of the building:
                                          Length = 3048 + 3048 = 6096
        6.10                              Width = 3048 + 3048 = 6096
        6.10
     ----------
      37.21         37 m2
     ----------




                    www.utm.my                 innovative ● entrepreneurial ● global   7
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation

2.2) Excavation for pile cap            Size of pile cap = 1219 x 1219
                                        Depth of excavation:
     9/1.22                                1524 + 50 (lean concrete) = 1574
        1.22
        1.57
     ----------
      21.03        21 m3
     ----------




                    www.utm.my               innovative ● entrepreneurial ● global   8
MEASUREMENT OF QUANTITIES




        www.utm.my          innovative ● entrepreneurial ● global   9
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation
2.3) Reinforced concrete Grade 30 for   Size of pile cap:
     pile cap                           Length = 1219
                                        Width = 1219
    9/1.22                              Thickness = 305
       1.22
       0.31
    ----------
       4.15       4 m3
    ----------




                   www.utm.my                 innovative ● entrepreneurial ● global   10
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation
2.4) 50mm thick lean concrete Grade     Size of pile cap:
     15 for pile cap                    Length = 1219
                                        Width = 1219
   9 / 1.22
       1.22
    ----------
     13.40        13 m2
    ----------




                   www.utm.my                 innovative ● entrepreneurial ● global   11
MEASUREMENT OF QUANTITIES




        www.utm.my          innovative ● entrepreneurial ● global   12
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation
2.5) Formwork for pile cap              Size of pile cap:
                                        Length = 1219
 9 / 4 /1.22                            Width = 1219
        0.31                            Thickness = 305
     ----------
       13.62      14 m2                 9/2/1.22
     ----------                              0.31 6.81

                                        9/2/1.50
                                             0.31 8.37
                                                 15.18 15m2




                   www.utm.my                 innovative ● entrepreneurial ● global   13
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation
2.6) Reinforcement bar Y12 for pile cap   Length:
                                            a                    c
 9/2/ 12/ 1.53
       ----------                                      b

       330.48m x 0.89 kg/m = 294.13kg     = a + b + c – cover
       ----------                         = 305 + 1219 + 305 – 6(50)
                            = 294 kg      = 1829 – 300
                                          = 1529

a=305-50-50=205                           No. of bars:
b=1219-50-50=1119                         = (b/100) + 1
c=305-50-50=205                           = ((1219 – 2(50)cover )/100 )+1
A+B+C=1529                                = 12 nos.



                   www.utm.my                   innovative ● entrepreneurial ● global   14
MEASUREMENT OF QUANTITIES




                     @100 c/c




        www.utm.my              innovative ● entrepreneurial ● global   15
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF                                Taker off :              Checked by:
3.1) Column stump                       Size of column stump:
3.1.1) Reinforced concrete Grade 30     Length = 229
       for column stump                 Width = 229
                                        Height = 1524 – 305 thickness of pile
    9/0.23                                         cap – (351/2) Half of beam’s
       0.23                                        thickness
       1.04                                      = 1043.50
    ----------
       0.50       1 m3
    ----------




                   www.utm.my                 innovative ● entrepreneurial ● global   16
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.1) Column stump                       Size of column stump:
3.1.2) Formwork for column stump        Length = 229
                                        Width = 229
  9/4/0.23                              Height = 1524 – 305 thickness of pile
        1.04                                       cap – (351/2) Half of beam’s
     ----------                                    thickness
       8.61       9 m2                           = 1043.50
     ----------




                   www.utm.my                innovative ● entrepreneurial ● global   17
MEASUREMENT OF QUANTITIES




               Height of column stump

                        @100 c/c




        www.utm.my                      innovative ● entrepreneurial ● global   18
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.1) Column stump                       Length = a + half beam’s thickness –
3.1.3) Reinforcement bar Y12 for        cover + 2 laps
       column stump                          lap



  9/4/2.97
     ----------                                    a

     106.92m x 0.89kg/m = 95.16kg
     ----------                                        lap
                           95kg
                                        = 1524 + (351/2) – 50 + (660x2)
                                        = 2969.50




                   www.utm.my                innovative ● entrepreneurial ● global   19
MEASUREMENT OF QUANTITIES
                     General Notes




        www.utm.my                   innovative ● entrepreneurial ● global   20
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.1) Column stump                       Length of link: (length of CS– 2cover) x
3.1.4) R6 link in for column stump      4 +hook            Hook


  9/6/0.62
     ----------
      33.48m x 0.22kg/m = 7.36kg        =(229-100)+(229-100)+(229-100)+(229-
     ----------                         100)+100=616
                           7kg
                                        No. of link:
                                        Height of column stump = 1043.50
                                        =(1043.50/229)+1
                                        = 6 nos.




                   www.utm.my                innovative ● entrepreneurial ● global   21
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.2) Ground beam                        Size of ground beam:
3.2.1) Excavation for ground beam       Length=3048+3048=6096
                                        Width = 229
  2/3/6.10                              Thickness = 351
       0.23
       0.35
     ----------
       2.95m3
     ----------
                           3m3




                   www.utm.my                innovative ● entrepreneurial ● global   22
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.2) Ground beam                          Size of ground beam:
3.2.2) Reinforced concrete Grade 30 for   Length=3048+3048=6096
        ground beam                       Width = 229
                                          Thickness = 351
  2/3/6.10
       0.23
       0.35
     ----------
       2.95m3
     ----------
                            3m3




                   www.utm.my                 innovative ● entrepreneurial ● global   23
MEASUREMENT OF QUANTITIES


Assumption No. 1:       Total land area = 10m x 10m




                                  Project Title: Construction and completion of
                                  guard house
                                  Owner: Panicsonic Sdn Bhd
                                  Architect: A to Z Sdn Bhd
                                  Drawing Title: Ground beam and foundation plan
                                  -------------------------------------------------------------------------
                                  Drawn by: Sheila
                                  Checked by: Aaron




           www.utm.my            innovative ● entrepreneurial ● global                                        24
MEASUREMENT OF QUANTITIES




               Height of column stump

                        @100 c/c




        www.utm.my                      innovative ● entrepreneurial ● global   25
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.2) Ground beam                        Size of ground beam:
3.2.3) Formwork for ground beam         Length=3048+3048=6096
                                        Width = 229
                                        Thickness = 351
2/3/2/6.10
       0.35
     ----------
      25.62       26m2
     ----------




                   www.utm.my                innovative ● entrepreneurial ● global   26
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.2) Ground beam                        Length = (length–2cover)+(2bend-
3.2.4) Reinforcement bar Y10 for        2cover)
       ground beam                      =(6096-(2x50))+(2x351)-(4x50)
                                        = 6498
2/3/4/6.50
     ----------
    156.00m x 0.62kg/m = 96.72kg
     ----------
                          97kg




                   www.utm.my                innovative ● entrepreneurial ● global   27
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.2) Ground beam                        Length of stirrup:
3.2.5) R6 stirrup for ground beam                            Hook


2/3/28/0.86
      ----------                        =(229-100)+(351-100)+(229-100)+(351-
     144.48m x 0.22kg/m = 31.79kg       100)+100
      ----------                        =860
                          32kg
                                        No. of stirrup:
                                        Length of grd beam= 6096
                                        =(6096/229)+1
                                        = 28 nos.




                   www.utm.my                innovative ● entrepreneurial ● global   28
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.3) Ground slab                        Area of slab = length x width
3.3.1) Excavation for ground slab       Depth of excavation = 500mm
                                                                      150mm thick
                                                                      concrete slab

       6.10
       6.10                                                                   BRC A8


       0.50                                                                  50mm thick
                                                                                sand
      ----------                                                             300mm thick

      18.61m3                                                                  hardcore


      ----------                                          DPM

                           19 m3




                   www.utm.my               innovative ● entrepreneurial ● global          29
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.3) Ground slab                        Area of slab = length x width
3.3.2) Reinforced concrete G30 in       Depth of excavation = 500mm
       ground slab                                                       150mm thick
                                                                         concrete slab



       6.10                                                                BRC A8

       6.10                                                                50mm thick
       0.15                                                                   sand


      ----------                                                          300mm thick
                                                                            hardcore

       5.58m3
      ----------   6 m3                                    DPM




                   www.utm.my                innovative ● entrepreneurial ● global       30
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.3) Ground slab                        Area of slab = length x width
3.3.3) Formwork for ground slab         Depth of excavation = 500mm
                                                                         150mm thick
                                                                         concrete slab

     4/6.10
       0.15                                                                BRC A8


      ----------                                                           50mm thick
                                                                              sand
       3.66m2                                                             300mm thick

      ----------                                                            hardcore


                           4 m2                            DPM




                   www.utm.my                innovative ● entrepreneurial ● global       31
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.3) Ground slab                        Area of slab = length x width
3.3.4) BRC A8 for ground slab           Depth of excavation = 500mm
                                                                         150mm thick
                                                                         concrete slab

       6.10
       6.10                                                                BRC A8

      ----------                                                           50mm thick
      37.21m2                                                                 sand


      ----------                                                          300mm thick
                                                                            hardcore

                           37 m2
                                                           DPM




                   www.utm.my                innovative ● entrepreneurial ● global       32
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.3) Ground slab                        Area of slab = length x width
3.3.5) DPM for ground slab              Depth of excavation = 500mm
                                                                         150mm thick
                                                                         concrete slab

       6.10
       6.10                                                                BRC A8

      ----------                                                           50mm thick
      37.21m2                                                                 sand


      ----------                                                          300mm thick
                                                                            hardcore

                             37 m2
                                                           DPM




                   www.utm.my                innovative ● entrepreneurial ● global       33
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.3) Ground slab                        Area of slab = length x width
3.3.6) 50mm sand blinding for ground    Depth of excavation = 500mm
       slab                                                              150mm thick
                                                                         concrete slab



       6.10                                                                BRC A8

       6.10                                                                50mm thick
      ----------                                                              sand


      37.21m2                                                             300mm thick
                                                                            hardcore

      ----------
                           37 m2                           DPM




                   www.utm.my                innovative ● entrepreneurial ● global       34
MEASUREMENT OF QUANTITIES


Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF
3.3) Ground slab                        Area of slab = length x width
3.3.7) Hardcore for ground slab         Depth of excavation = 500mm
                                                                         150mm thick
                                                                         concrete slab

       6.10
       6.10                                                                BRC A8

       0.30                                                                50mm thick
      ----------                                                              sand


      11.16m3                                                             300mm thick
                                                                            hardcore

      ----------
                           11 m3                           DPM




                   www.utm.my                innovative ● entrepreneurial ● global       35

More Related Content

What's hot

Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Wblff (1)
Wblff (1)Wblff (1)
Wblff (1)ahmong4
 
Bq preamble
Bq preambleBq preamble
Bq preambleaizat76
 
Kontrak ‘turnkey’
Kontrak ‘turnkey’Kontrak ‘turnkey’
Kontrak ‘turnkey’muhd noor
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantityhlksd
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System마 이환
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - BriefKai Yun Pang
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantitiesBt Lee
 
Taking Off Report Latihan Industri
Taking Off Report Latihan IndustriTaking Off Report Latihan Industri
Taking Off Report Latihan Industricik Ena
 
Unit 2 contract 2.1-2.3
Unit 2 contract 2.1-2.3Unit 2 contract 2.1-2.3
Unit 2 contract 2.1-2.3Mara
 
Industrialised Building System report,
Industrialised Building System report, Industrialised Building System report,
Industrialised Building System report, Eraz
 
Chapter 2 soil investigation
Chapter 2 soil investigationChapter 2 soil investigation
Chapter 2 soil investigationAmiRul AFiq
 
Excavation 2014a-Lecture2
Excavation 2014a-Lecture2Excavation 2014a-Lecture2
Excavation 2014a-Lecture2Anne Allan
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in MalaysiaDayat Mohamad
 

What's hot (20)

Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Wblff (1)
Wblff (1)Wblff (1)
Wblff (1)
 
Bq preamble
Bq preambleBq preamble
Bq preamble
 
Kontrak ‘turnkey’
Kontrak ‘turnkey’Kontrak ‘turnkey’
Kontrak ‘turnkey’
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System
 
Hand auger
Hand augerHand auger
Hand auger
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantities
 
Taking Off Report Latihan Industri
Taking Off Report Latihan IndustriTaking Off Report Latihan Industri
Taking Off Report Latihan Industri
 
Bcon
BconBcon
Bcon
 
Site possession
Site possessionSite possession
Site possession
 
Unit 2 contract 2.1-2.3
Unit 2 contract 2.1-2.3Unit 2 contract 2.1-2.3
Unit 2 contract 2.1-2.3
 
Industrialised Building System report,
Industrialised Building System report, Industrialised Building System report,
Industrialised Building System report,
 
Earthwork
EarthworkEarthwork
Earthwork
 
Site Possession
Site PossessionSite Possession
Site Possession
 
Chapter 2 soil investigation
Chapter 2 soil investigationChapter 2 soil investigation
Chapter 2 soil investigation
 
Excavation 2014a-Lecture2
Excavation 2014a-Lecture2Excavation 2014a-Lecture2
Excavation 2014a-Lecture2
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
 

Similar to Sgp4813 measurement of quantities

Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantitiesalanchong88
 
11. KGA, MALL - Execution Plan - R- 06.03.2023.pptx
11. KGA, MALL - Execution Plan - R- 06.03.2023.pptx11. KGA, MALL - Execution Plan - R- 06.03.2023.pptx
11. KGA, MALL - Execution Plan - R- 06.03.2023.pptxssuser2ec079
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportkiransuresh7
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportkiransuresh7
 
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRCDELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRCAl Hakam Khan
 
IRJET- Design and Analysis of Residential Building
IRJET-  	  Design and Analysis of Residential BuildingIRJET-  	  Design and Analysis of Residential Building
IRJET- Design and Analysis of Residential BuildingIRJET Journal
 
hochPPT thesis statement master civil engineering.pptx
hochPPT thesis statement master civil engineering.pptxhochPPT thesis statement master civil engineering.pptx
hochPPT thesis statement master civil engineering.pptxZakaria156221
 
Présentation master thesesis in civil department pptx
Présentation master thesesis in civil department pptxPrésentation master thesesis in civil department pptx
Présentation master thesesis in civil department pptxZakaria156221
 
DSLIP 2015 Technical Report
DSLIP 2015 Technical ReportDSLIP 2015 Technical Report
DSLIP 2015 Technical ReportJoanna Ding
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)AJAY SHAHU
 
Labour Productivity for construction projects
Labour Productivity for construction projectsLabour Productivity for construction projects
Labour Productivity for construction projectsKapugantikapuganti Gupta
 
@ETCONp Construction Exam 8 .DOCX
@ETCONp Construction Exam 8  .DOCX@ETCONp Construction Exam 8  .DOCX
@ETCONp Construction Exam 8 .DOCXMekonnenAyal
 
Construction site
Construction siteConstruction site
Construction siteTimun Loh
 
Dda training presentation
Dda training presentationDda training presentation
Dda training presentationAKASHGARG131
 
BUILDING CONSTRUCTION
BUILDING CONSTRUCTION BUILDING CONSTRUCTION
BUILDING CONSTRUCTION Eric Lo
 
Construction work of a multi storied residential building
Construction work of a multi storied residential buildingConstruction work of a multi storied residential building
Construction work of a multi storied residential buildingShariful Haque Robin
 
internship ppt.pptx civil engineering institute
internship ppt.pptx civil engineering instituteinternship ppt.pptx civil engineering institute
internship ppt.pptx civil engineering instituteSrikanthReddy345872
 

Similar to Sgp4813 measurement of quantities (20)

Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantities
 
11. KGA, MALL - Execution Plan - R- 06.03.2023.pptx
11. KGA, MALL - Execution Plan - R- 06.03.2023.pptx11. KGA, MALL - Execution Plan - R- 06.03.2023.pptx
11. KGA, MALL - Execution Plan - R- 06.03.2023.pptx
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRCDELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
 
IRJET- Design and Analysis of Residential Building
IRJET-  	  Design and Analysis of Residential BuildingIRJET-  	  Design and Analysis of Residential Building
IRJET- Design and Analysis of Residential Building
 
hochPPT thesis statement master civil engineering.pptx
hochPPT thesis statement master civil engineering.pptxhochPPT thesis statement master civil engineering.pptx
hochPPT thesis statement master civil engineering.pptx
 
Présentation master thesesis in civil department pptx
Présentation master thesesis in civil department pptxPrésentation master thesesis in civil department pptx
Présentation master thesesis in civil department pptx
 
DSLIP 2015 Technical Report
DSLIP 2015 Technical ReportDSLIP 2015 Technical Report
DSLIP 2015 Technical Report
 
Dslip report
Dslip reportDslip report
Dslip report
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)
 
Labour Productivity for construction projects
Labour Productivity for construction projectsLabour Productivity for construction projects
Labour Productivity for construction projects
 
@ETCONp Construction Exam 8 .DOCX
@ETCONp Construction Exam 8  .DOCX@ETCONp Construction Exam 8  .DOCX
@ETCONp Construction Exam 8 .DOCX
 
Construction site
Construction siteConstruction site
Construction site
 
Dda training presentation
Dda training presentationDda training presentation
Dda training presentation
 
BUILDING CONSTRUCTION
BUILDING CONSTRUCTION BUILDING CONSTRUCTION
BUILDING CONSTRUCTION
 
Construction work of a multi storied residential building
Construction work of a multi storied residential buildingConstruction work of a multi storied residential building
Construction work of a multi storied residential building
 
AH15019
AH15019AH15019
AH15019
 
internship ppt.pptx civil engineering institute
internship ppt.pptx civil engineering instituteinternship ppt.pptx civil engineering institute
internship ppt.pptx civil engineering institute
 
Abhishek presentation.pptx
Abhishek presentation.pptxAbhishek presentation.pptx
Abhishek presentation.pptx
 

Recently uploaded

1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandSharisaBethune
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 

Recently uploaded (20)

1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal Brand
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 

Sgp4813 measurement of quantities

  • 1. MEASUREMENT OF QUANTITIES ● Mat Naim bin Abdullah @ Mohd Asmoni ● Diploma QS (UTM), BSc. QS (Glasgow Caledonian University), M.Eng. Construction (UTM), PhD Facilities Management (UTM) ● matnaim@utm.my ● amn871969@yahoo.com ● C04-308 ● 019-7573760 www.utm.my innovative ● entrepreneurial ● global 1
  • 2. MEASUREMENT OF QUANTITIES Assumption No. 1: Total land area = 10m x 10m Project Title: Construction and completion of guard house Owner: Panicsonic Sdn Bhd Architect: A to Z Sdn Bhd Drawing Title: Ground beam and foundation plan ------------------------------------------------------------------------- Drawn by: Sheila Checked by: Aaron www.utm.my innovative ● entrepreneurial ● global 2
  • 3. MEASUREMENT OF QUANTITIES www.utm.my innovative ● entrepreneurial ● global 3
  • 4. MEASUREMENT OF QUANTITIES Construction Method 1. Preliminaries (Initial site works) - % of total cost 2. Site clearance and earthwork 3. Foundation construction (E.g. Piling and footing) 4. Work below lowest floor finish 5. Frame 6. Staircase 7. Upper Floor 8. Roof 9. Wall and partition 10. Door and window 11. Finishes 12. Sundries (Built-in furniture) 13. Building services (M&E, ICT etc) 14. External works (Water reticulation, landscape etc) www.utm.my innovative ● entrepreneurial ● global 4
  • 5. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 1) Site clearance 1.1) Clear the site including grubbing of Area of the site: trees, shrubs and demolish any 10 x 10 = 100m2 existing structure and cart away and dump to the specified location. 10.00 10.00 ---------- 100.00 100 m2 ---------- www.utm.my innovative ● entrepreneurial ● global 5
  • 6. MEASUREMENT OF QUANTITIES www.utm.my innovative ● entrepreneurial ● global 6
  • 7. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 2) Foundation 2.1) Piling including all related works Area of the building: Length = 3048 + 3048 = 6096 6.10 Width = 3048 + 3048 = 6096 6.10 ---------- 37.21 37 m2 ---------- www.utm.my innovative ● entrepreneurial ● global 7
  • 8. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 2) Foundation 2.2) Excavation for pile cap Size of pile cap = 1219 x 1219 Depth of excavation: 9/1.22 1524 + 50 (lean concrete) = 1574 1.22 1.57 ---------- 21.03 21 m3 ---------- www.utm.my innovative ● entrepreneurial ● global 8
  • 9. MEASUREMENT OF QUANTITIES www.utm.my innovative ● entrepreneurial ● global 9
  • 10. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 2) Foundation 2.3) Reinforced concrete Grade 30 for Size of pile cap: pile cap Length = 1219 Width = 1219 9/1.22 Thickness = 305 1.22 0.31 ---------- 4.15 4 m3 ---------- www.utm.my innovative ● entrepreneurial ● global 10
  • 11. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 2) Foundation 2.4) 50mm thick lean concrete Grade Size of pile cap: 15 for pile cap Length = 1219 Width = 1219 9 / 1.22 1.22 ---------- 13.40 13 m2 ---------- www.utm.my innovative ● entrepreneurial ● global 11
  • 12. MEASUREMENT OF QUANTITIES www.utm.my innovative ● entrepreneurial ● global 12
  • 13. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 2) Foundation 2.5) Formwork for pile cap Size of pile cap: Length = 1219 9 / 4 /1.22 Width = 1219 0.31 Thickness = 305 ---------- 13.62 14 m2 9/2/1.22 ---------- 0.31 6.81 9/2/1.50 0.31 8.37 15.18 15m2 www.utm.my innovative ● entrepreneurial ● global 13
  • 14. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 2) Foundation 2.6) Reinforcement bar Y12 for pile cap Length: a c 9/2/ 12/ 1.53 ---------- b 330.48m x 0.89 kg/m = 294.13kg = a + b + c – cover ---------- = 305 + 1219 + 305 – 6(50) = 294 kg = 1829 – 300 = 1529 a=305-50-50=205 No. of bars: b=1219-50-50=1119 = (b/100) + 1 c=305-50-50=205 = ((1219 – 2(50)cover )/100 )+1 A+B+C=1529 = 12 nos. www.utm.my innovative ● entrepreneurial ● global 14
  • 15. MEASUREMENT OF QUANTITIES @100 c/c www.utm.my innovative ● entrepreneurial ● global 15
  • 16. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF Taker off : Checked by: 3.1) Column stump Size of column stump: 3.1.1) Reinforced concrete Grade 30 Length = 229 for column stump Width = 229 Height = 1524 – 305 thickness of pile 9/0.23 cap – (351/2) Half of beam’s 0.23 thickness 1.04 = 1043.50 ---------- 0.50 1 m3 ---------- www.utm.my innovative ● entrepreneurial ● global 16
  • 17. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.1) Column stump Size of column stump: 3.1.2) Formwork for column stump Length = 229 Width = 229 9/4/0.23 Height = 1524 – 305 thickness of pile 1.04 cap – (351/2) Half of beam’s ---------- thickness 8.61 9 m2 = 1043.50 ---------- www.utm.my innovative ● entrepreneurial ● global 17
  • 18. MEASUREMENT OF QUANTITIES Height of column stump @100 c/c www.utm.my innovative ● entrepreneurial ● global 18
  • 19. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.1) Column stump Length = a + half beam’s thickness – 3.1.3) Reinforcement bar Y12 for cover + 2 laps column stump lap 9/4/2.97 ---------- a 106.92m x 0.89kg/m = 95.16kg ---------- lap 95kg = 1524 + (351/2) – 50 + (660x2) = 2969.50 www.utm.my innovative ● entrepreneurial ● global 19
  • 20. MEASUREMENT OF QUANTITIES General Notes www.utm.my innovative ● entrepreneurial ● global 20
  • 21. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.1) Column stump Length of link: (length of CS– 2cover) x 3.1.4) R6 link in for column stump 4 +hook Hook 9/6/0.62 ---------- 33.48m x 0.22kg/m = 7.36kg =(229-100)+(229-100)+(229-100)+(229- ---------- 100)+100=616 7kg No. of link: Height of column stump = 1043.50 =(1043.50/229)+1 = 6 nos. www.utm.my innovative ● entrepreneurial ● global 21
  • 22. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.2) Ground beam Size of ground beam: 3.2.1) Excavation for ground beam Length=3048+3048=6096 Width = 229 2/3/6.10 Thickness = 351 0.23 0.35 ---------- 2.95m3 ---------- 3m3 www.utm.my innovative ● entrepreneurial ● global 22
  • 23. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.2) Ground beam Size of ground beam: 3.2.2) Reinforced concrete Grade 30 for Length=3048+3048=6096 ground beam Width = 229 Thickness = 351 2/3/6.10 0.23 0.35 ---------- 2.95m3 ---------- 3m3 www.utm.my innovative ● entrepreneurial ● global 23
  • 24. MEASUREMENT OF QUANTITIES Assumption No. 1: Total land area = 10m x 10m Project Title: Construction and completion of guard house Owner: Panicsonic Sdn Bhd Architect: A to Z Sdn Bhd Drawing Title: Ground beam and foundation plan ------------------------------------------------------------------------- Drawn by: Sheila Checked by: Aaron www.utm.my innovative ● entrepreneurial ● global 24
  • 25. MEASUREMENT OF QUANTITIES Height of column stump @100 c/c www.utm.my innovative ● entrepreneurial ● global 25
  • 26. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.2) Ground beam Size of ground beam: 3.2.3) Formwork for ground beam Length=3048+3048=6096 Width = 229 Thickness = 351 2/3/2/6.10 0.35 ---------- 25.62 26m2 ---------- www.utm.my innovative ● entrepreneurial ● global 26
  • 27. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.2) Ground beam Length = (length–2cover)+(2bend- 3.2.4) Reinforcement bar Y10 for 2cover) ground beam =(6096-(2x50))+(2x351)-(4x50) = 6498 2/3/4/6.50 ---------- 156.00m x 0.62kg/m = 96.72kg ---------- 97kg www.utm.my innovative ● entrepreneurial ● global 27
  • 28. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.2) Ground beam Length of stirrup: 3.2.5) R6 stirrup for ground beam Hook 2/3/28/0.86 ---------- =(229-100)+(351-100)+(229-100)+(351- 144.48m x 0.22kg/m = 31.79kg 100)+100 ---------- =860 32kg No. of stirrup: Length of grd beam= 6096 =(6096/229)+1 = 28 nos. www.utm.my innovative ● entrepreneurial ● global 28
  • 29. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.3) Ground slab Area of slab = length x width 3.3.1) Excavation for ground slab Depth of excavation = 500mm 150mm thick concrete slab 6.10 6.10 BRC A8 0.50 50mm thick sand ---------- 300mm thick 18.61m3 hardcore ---------- DPM 19 m3 www.utm.my innovative ● entrepreneurial ● global 29
  • 30. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.3) Ground slab Area of slab = length x width 3.3.2) Reinforced concrete G30 in Depth of excavation = 500mm ground slab 150mm thick concrete slab 6.10 BRC A8 6.10 50mm thick 0.15 sand ---------- 300mm thick hardcore 5.58m3 ---------- 6 m3 DPM www.utm.my innovative ● entrepreneurial ● global 30
  • 31. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.3) Ground slab Area of slab = length x width 3.3.3) Formwork for ground slab Depth of excavation = 500mm 150mm thick concrete slab 4/6.10 0.15 BRC A8 ---------- 50mm thick sand 3.66m2 300mm thick ---------- hardcore 4 m2 DPM www.utm.my innovative ● entrepreneurial ● global 31
  • 32. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.3) Ground slab Area of slab = length x width 3.3.4) BRC A8 for ground slab Depth of excavation = 500mm 150mm thick concrete slab 6.10 6.10 BRC A8 ---------- 50mm thick 37.21m2 sand ---------- 300mm thick hardcore 37 m2 DPM www.utm.my innovative ● entrepreneurial ● global 32
  • 33. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.3) Ground slab Area of slab = length x width 3.3.5) DPM for ground slab Depth of excavation = 500mm 150mm thick concrete slab 6.10 6.10 BRC A8 ---------- 50mm thick 37.21m2 sand ---------- 300mm thick hardcore 37 m2 DPM www.utm.my innovative ● entrepreneurial ● global 33
  • 34. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.3) Ground slab Area of slab = length x width 3.3.6) 50mm sand blinding for ground Depth of excavation = 500mm slab 150mm thick concrete slab 6.10 BRC A8 6.10 50mm thick ---------- sand 37.21m2 300mm thick hardcore ---------- 37 m2 DPM www.utm.my innovative ● entrepreneurial ● global 34
  • 35. MEASUREMENT OF QUANTITIES Project: Construction and completion of Guard House for Panicsonic Sdn Bhd 3) WBLFF 3.3) Ground slab Area of slab = length x width 3.3.7) Hardcore for ground slab Depth of excavation = 500mm 150mm thick concrete slab 6.10 6.10 BRC A8 0.30 50mm thick ---------- sand 11.16m3 300mm thick hardcore ---------- 11 m3 DPM www.utm.my innovative ● entrepreneurial ● global 35