Sgp4813 measurement of quantities

  1. 1. MEASUREMENT OF QUANTITIES ● Mat Naim bin Abdullah @ Mohd Asmoni ● Diploma QS (UTM), BSc. QS (Glasgow Caledonian University), M.Eng. Construction (UTM), PhD Facilities Management (UTM) ● matnaim@utm.my ● amn871969@yahoo.com ● C04-308 ● 019-7573760 www.utm.my innovative ● entrepreneurial ● global 1
  2. 2. MEASUREMENT OF QUANTITIESAssumption No. 1: Total land area = 10m x 10m Project Title: Construction and completion of guard house Owner: Panicsonic Sdn Bhd Architect: A to Z Sdn Bhd Drawing Title: Ground beam and foundation plan ------------------------------------------------------------------------- Drawn by: Sheila Checked by: Aaron www.utm.my innovative ● entrepreneurial ● global 2
  3. 3. MEASUREMENT OF QUANTITIES www.utm.my innovative ● entrepreneurial ● global 3
  4. 4. MEASUREMENT OF QUANTITIES Construction Method 1. Preliminaries (Initial site works) - % of total cost 2. Site clearance and earthwork 3. Foundation construction (E.g. Piling and footing) 4. Work below lowest floor finish 5. Frame 6. Staircase 7. Upper Floor 8. Roof 9. Wall and partition 10. Door and window 11. Finishes 12. Sundries (Built-in furniture) 13. Building services (M&E, ICT etc) 14. External works (Water reticulation, landscape etc) www.utm.my innovative ● entrepreneurial ● global 4
  5. 5. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd1) Site clearance1.1) Clear the site including grubbing of Area of the site: trees, shrubs and demolish any 10 x 10 = 100m2 existing structure and cart away and dump to the specified location. 10.00 10.00 ---------- 100.00 100 m2 ---------- www.utm.my innovative ● entrepreneurial ● global 5
  6. 6. MEASUREMENT OF QUANTITIES www.utm.my innovative ● entrepreneurial ● global 6
  7. 7. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd2) Foundation2.1) Piling including all related works Area of the building: Length = 3048 + 3048 = 6096 6.10 Width = 3048 + 3048 = 6096 6.10 ---------- 37.21 37 m2 ---------- www.utm.my innovative ● entrepreneurial ● global 7
  8. 8. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd2) Foundation2.2) Excavation for pile cap Size of pile cap = 1219 x 1219 Depth of excavation: 9/1.22 1524 + 50 (lean concrete) = 1574 1.22 1.57 ---------- 21.03 21 m3 ---------- www.utm.my innovative ● entrepreneurial ● global 8
  9. 9. MEASUREMENT OF QUANTITIES www.utm.my innovative ● entrepreneurial ● global 9
  10. 10. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd2) Foundation2.3) Reinforced concrete Grade 30 for Size of pile cap: pile cap Length = 1219 Width = 1219 9/1.22 Thickness = 305 1.22 0.31 ---------- 4.15 4 m3 ---------- www.utm.my innovative ● entrepreneurial ● global 10
  11. 11. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd2) Foundation2.4) 50mm thick lean concrete Grade Size of pile cap: 15 for pile cap Length = 1219 Width = 1219 9 / 1.22 1.22 ---------- 13.40 13 m2 ---------- www.utm.my innovative ● entrepreneurial ● global 11
  12. 12. MEASUREMENT OF QUANTITIES www.utm.my innovative ● entrepreneurial ● global 12
  13. 13. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd2) Foundation2.5) Formwork for pile cap Size of pile cap: Length = 1219 9 / 4 /1.22 Width = 1219 0.31 Thickness = 305 ---------- 13.62 14 m2 9/2/1.22 ---------- 0.31 6.81 9/2/1.50 0.31 8.37 15.18 15m2 www.utm.my innovative ● entrepreneurial ● global 13
  14. 14. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd2) Foundation2.6) Reinforcement bar Y12 for pile cap Length: a c 9/2/ 12/ 1.53 ---------- b 330.48m x 0.89 kg/m = 294.13kg = a + b + c – cover ---------- = 305 + 1219 + 305 – 6(50) = 294 kg = 1829 – 300 = 1529a=305-50-50=205 No. of bars:b=1219-50-50=1119 = (b/100) + 1c=305-50-50=205 = ((1219 – 2(50)cover )/100 )+1A+B+C=1529 = 12 nos. www.utm.my innovative ● entrepreneurial ● global 14
  15. 15. MEASUREMENT OF QUANTITIES @100 c/c www.utm.my innovative ● entrepreneurial ● global 15
  16. 16. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF Taker off : Checked by:3.1) Column stump Size of column stump:3.1.1) Reinforced concrete Grade 30 Length = 229 for column stump Width = 229 Height = 1524 – 305 thickness of pile 9/0.23 cap – (351/2) Half of beam’s 0.23 thickness 1.04 = 1043.50 ---------- 0.50 1 m3 ---------- www.utm.my innovative ● entrepreneurial ● global 16
  17. 17. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.1) Column stump Size of column stump:3.1.2) Formwork for column stump Length = 229 Width = 229 9/4/0.23 Height = 1524 – 305 thickness of pile 1.04 cap – (351/2) Half of beam’s ---------- thickness 8.61 9 m2 = 1043.50 ---------- www.utm.my innovative ● entrepreneurial ● global 17
  18. 18. MEASUREMENT OF QUANTITIES Height of column stump @100 c/c www.utm.my innovative ● entrepreneurial ● global 18
  19. 19. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.1) Column stump Length = a + half beam’s thickness –3.1.3) Reinforcement bar Y12 for cover + 2 laps column stump lap 9/4/2.97 ---------- a 106.92m x 0.89kg/m = 95.16kg ---------- lap 95kg = 1524 + (351/2) – 50 + (660x2) = 2969.50 www.utm.my innovative ● entrepreneurial ● global 19
  20. 20. MEASUREMENT OF QUANTITIES General Notes www.utm.my innovative ● entrepreneurial ● global 20
  21. 21. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.1) Column stump Length of link: (length of CS– 2cover) x3.1.4) R6 link in for column stump 4 +hook Hook 9/6/0.62 ---------- 33.48m x 0.22kg/m = 7.36kg =(229-100)+(229-100)+(229-100)+(229- ---------- 100)+100=616 7kg No. of link: Height of column stump = 1043.50 =(1043.50/229)+1 = 6 nos. www.utm.my innovative ● entrepreneurial ● global 21
  22. 22. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.2) Ground beam Size of ground beam:3.2.1) Excavation for ground beam Length=3048+3048=6096 Width = 229 2/3/6.10 Thickness = 351 0.23 0.35 ---------- 2.95m3 ---------- 3m3 www.utm.my innovative ● entrepreneurial ● global 22
  23. 23. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.2) Ground beam Size of ground beam:3.2.2) Reinforced concrete Grade 30 for Length=3048+3048=6096 ground beam Width = 229 Thickness = 351 2/3/6.10 0.23 0.35 ---------- 2.95m3 ---------- 3m3 www.utm.my innovative ● entrepreneurial ● global 23
  24. 24. MEASUREMENT OF QUANTITIESAssumption No. 1: Total land area = 10m x 10m Project Title: Construction and completion of guard house Owner: Panicsonic Sdn Bhd Architect: A to Z Sdn Bhd Drawing Title: Ground beam and foundation plan ------------------------------------------------------------------------- Drawn by: Sheila Checked by: Aaron www.utm.my innovative ● entrepreneurial ● global 24
  25. 25. MEASUREMENT OF QUANTITIES Height of column stump @100 c/c www.utm.my innovative ● entrepreneurial ● global 25
  26. 26. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.2) Ground beam Size of ground beam:3.2.3) Formwork for ground beam Length=3048+3048=6096 Width = 229 Thickness = 3512/3/2/6.10 0.35 ---------- 25.62 26m2 ---------- www.utm.my innovative ● entrepreneurial ● global 26
  27. 27. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.2) Ground beam Length = (length–2cover)+(2bend-3.2.4) Reinforcement bar Y10 for 2cover) ground beam =(6096-(2x50))+(2x351)-(4x50) = 64982/3/4/6.50 ---------- 156.00m x 0.62kg/m = 96.72kg ---------- 97kg www.utm.my innovative ● entrepreneurial ● global 27
  28. 28. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.2) Ground beam Length of stirrup:3.2.5) R6 stirrup for ground beam Hook2/3/28/0.86 ---------- =(229-100)+(351-100)+(229-100)+(351- 144.48m x 0.22kg/m = 31.79kg 100)+100 ---------- =860 32kg No. of stirrup: Length of grd beam= 6096 =(6096/229)+1 = 28 nos. www.utm.my innovative ● entrepreneurial ● global 28
  29. 29. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.3) Ground slab Area of slab = length x width3.3.1) Excavation for ground slab Depth of excavation = 500mm 150mm thick concrete slab 6.10 6.10 BRC A8 0.50 50mm thick sand ---------- 300mm thick 18.61m3 hardcore ---------- DPM 19 m3 www.utm.my innovative ● entrepreneurial ● global 29
  30. 30. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.3) Ground slab Area of slab = length x width3.3.2) Reinforced concrete G30 in Depth of excavation = 500mm ground slab 150mm thick concrete slab 6.10 BRC A8 6.10 50mm thick 0.15 sand ---------- 300mm thick hardcore 5.58m3 ---------- 6 m3 DPM www.utm.my innovative ● entrepreneurial ● global 30
  31. 31. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.3) Ground slab Area of slab = length x width3.3.3) Formwork for ground slab Depth of excavation = 500mm 150mm thick concrete slab 4/6.10 0.15 BRC A8 ---------- 50mm thick sand 3.66m2 300mm thick ---------- hardcore 4 m2 DPM www.utm.my innovative ● entrepreneurial ● global 31
  32. 32. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.3) Ground slab Area of slab = length x width3.3.4) BRC A8 for ground slab Depth of excavation = 500mm 150mm thick concrete slab 6.10 6.10 BRC A8 ---------- 50mm thick 37.21m2 sand ---------- 300mm thick hardcore 37 m2 DPM www.utm.my innovative ● entrepreneurial ● global 32
  33. 33. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.3) Ground slab Area of slab = length x width3.3.5) DPM for ground slab Depth of excavation = 500mm 150mm thick concrete slab 6.10 6.10 BRC A8 ---------- 50mm thick 37.21m2 sand ---------- 300mm thick hardcore 37 m2 DPM www.utm.my innovative ● entrepreneurial ● global 33
  34. 34. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.3) Ground slab Area of slab = length x width3.3.6) 50mm sand blinding for ground Depth of excavation = 500mm slab 150mm thick concrete slab 6.10 BRC A8 6.10 50mm thick ---------- sand 37.21m2 300mm thick hardcore ---------- 37 m2 DPM www.utm.my innovative ● entrepreneurial ● global 34
  35. 35. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.3) Ground slab Area of slab = length x width3.3.7) Hardcore for ground slab Depth of excavation = 500mm 150mm thick concrete slab 6.10 6.10 BRC A8 0.30 50mm thick ---------- sand 11.16m3 300mm thick hardcore ---------- 11 m3 DPM www.utm.my innovative ● entrepreneurial ● global 35

×