Your SlideShare is downloading. ×
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Sgp4813 measurement of quantities
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Sgp4813 measurement of quantities

1,692

Published on

Published in: Business
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
1,692
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
82
Comments
0
Likes
1
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. MEASUREMENT OF QUANTITIES ● Mat Naim bin Abdullah @ Mohd Asmoni ● Diploma QS (UTM), BSc. QS (Glasgow Caledonian University), M.Eng. Construction (UTM), PhD Facilities Management (UTM) ● matnaim@utm.my ● amn871969@yahoo.com ● C04-308 ● 019-7573760 www.utm.my innovative ● entrepreneurial ● global 1
  • 2. MEASUREMENT OF QUANTITIESAssumption No. 1: Total land area = 10m x 10m Project Title: Construction and completion of guard house Owner: Panicsonic Sdn Bhd Architect: A to Z Sdn Bhd Drawing Title: Ground beam and foundation plan ------------------------------------------------------------------------- Drawn by: Sheila Checked by: Aaron www.utm.my innovative ● entrepreneurial ● global 2
  • 3. MEASUREMENT OF QUANTITIES www.utm.my innovative ● entrepreneurial ● global 3
  • 4. MEASUREMENT OF QUANTITIES Construction Method 1. Preliminaries (Initial site works) - % of total cost 2. Site clearance and earthwork 3. Foundation construction (E.g. Piling and footing) 4. Work below lowest floor finish 5. Frame 6. Staircase 7. Upper Floor 8. Roof 9. Wall and partition 10. Door and window 11. Finishes 12. Sundries (Built-in furniture) 13. Building services (M&E, ICT etc) 14. External works (Water reticulation, landscape etc) www.utm.my innovative ● entrepreneurial ● global 4
  • 5. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd1) Site clearance1.1) Clear the site including grubbing of Area of the site: trees, shrubs and demolish any 10 x 10 = 100m2 existing structure and cart away and dump to the specified location. 10.00 10.00 ---------- 100.00 100 m2 ---------- www.utm.my innovative ● entrepreneurial ● global 5
  • 6. MEASUREMENT OF QUANTITIES www.utm.my innovative ● entrepreneurial ● global 6
  • 7. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd2) Foundation2.1) Piling including all related works Area of the building: Length = 3048 + 3048 = 6096 6.10 Width = 3048 + 3048 = 6096 6.10 ---------- 37.21 37 m2 ---------- www.utm.my innovative ● entrepreneurial ● global 7
  • 8. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd2) Foundation2.2) Excavation for pile cap Size of pile cap = 1219 x 1219 Depth of excavation: 9/1.22 1524 + 50 (lean concrete) = 1574 1.22 1.57 ---------- 21.03 21 m3 ---------- www.utm.my innovative ● entrepreneurial ● global 8
  • 9. MEASUREMENT OF QUANTITIES www.utm.my innovative ● entrepreneurial ● global 9
  • 10. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd2) Foundation2.3) Reinforced concrete Grade 30 for Size of pile cap: pile cap Length = 1219 Width = 1219 9/1.22 Thickness = 305 1.22 0.31 ---------- 4.15 4 m3 ---------- www.utm.my innovative ● entrepreneurial ● global 10
  • 11. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd2) Foundation2.4) 50mm thick lean concrete Grade Size of pile cap: 15 for pile cap Length = 1219 Width = 1219 9 / 1.22 1.22 ---------- 13.40 13 m2 ---------- www.utm.my innovative ● entrepreneurial ● global 11
  • 12. MEASUREMENT OF QUANTITIES www.utm.my innovative ● entrepreneurial ● global 12
  • 13. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd2) Foundation2.5) Formwork for pile cap Size of pile cap: Length = 1219 9 / 4 /1.22 Width = 1219 0.31 Thickness = 305 ---------- 13.62 14 m2 9/2/1.22 ---------- 0.31 6.81 9/2/1.50 0.31 8.37 15.18 15m2 www.utm.my innovative ● entrepreneurial ● global 13
  • 14. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd2) Foundation2.6) Reinforcement bar Y12 for pile cap Length: a c 9/2/ 12/ 1.53 ---------- b 330.48m x 0.89 kg/m = 294.13kg = a + b + c – cover ---------- = 305 + 1219 + 305 – 6(50) = 294 kg = 1829 – 300 = 1529a=305-50-50=205 No. of bars:b=1219-50-50=1119 = (b/100) + 1c=305-50-50=205 = ((1219 – 2(50)cover )/100 )+1A+B+C=1529 = 12 nos. www.utm.my innovative ● entrepreneurial ● global 14
  • 15. MEASUREMENT OF QUANTITIES @100 c/c www.utm.my innovative ● entrepreneurial ● global 15
  • 16. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF Taker off : Checked by:3.1) Column stump Size of column stump:3.1.1) Reinforced concrete Grade 30 Length = 229 for column stump Width = 229 Height = 1524 – 305 thickness of pile 9/0.23 cap – (351/2) Half of beam’s 0.23 thickness 1.04 = 1043.50 ---------- 0.50 1 m3 ---------- www.utm.my innovative ● entrepreneurial ● global 16
  • 17. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.1) Column stump Size of column stump:3.1.2) Formwork for column stump Length = 229 Width = 229 9/4/0.23 Height = 1524 – 305 thickness of pile 1.04 cap – (351/2) Half of beam’s ---------- thickness 8.61 9 m2 = 1043.50 ---------- www.utm.my innovative ● entrepreneurial ● global 17
  • 18. MEASUREMENT OF QUANTITIES Height of column stump @100 c/c www.utm.my innovative ● entrepreneurial ● global 18
  • 19. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.1) Column stump Length = a + half beam’s thickness –3.1.3) Reinforcement bar Y12 for cover + 2 laps column stump lap 9/4/2.97 ---------- a 106.92m x 0.89kg/m = 95.16kg ---------- lap 95kg = 1524 + (351/2) – 50 + (660x2) = 2969.50 www.utm.my innovative ● entrepreneurial ● global 19
  • 20. MEASUREMENT OF QUANTITIES General Notes www.utm.my innovative ● entrepreneurial ● global 20
  • 21. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.1) Column stump Length of link: (length of CS– 2cover) x3.1.4) R6 link in for column stump 4 +hook Hook 9/6/0.62 ---------- 33.48m x 0.22kg/m = 7.36kg =(229-100)+(229-100)+(229-100)+(229- ---------- 100)+100=616 7kg No. of link: Height of column stump = 1043.50 =(1043.50/229)+1 = 6 nos. www.utm.my innovative ● entrepreneurial ● global 21
  • 22. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.2) Ground beam Size of ground beam:3.2.1) Excavation for ground beam Length=3048+3048=6096 Width = 229 2/3/6.10 Thickness = 351 0.23 0.35 ---------- 2.95m3 ---------- 3m3 www.utm.my innovative ● entrepreneurial ● global 22
  • 23. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.2) Ground beam Size of ground beam:3.2.2) Reinforced concrete Grade 30 for Length=3048+3048=6096 ground beam Width = 229 Thickness = 351 2/3/6.10 0.23 0.35 ---------- 2.95m3 ---------- 3m3 www.utm.my innovative ● entrepreneurial ● global 23
  • 24. MEASUREMENT OF QUANTITIESAssumption No. 1: Total land area = 10m x 10m Project Title: Construction and completion of guard house Owner: Panicsonic Sdn Bhd Architect: A to Z Sdn Bhd Drawing Title: Ground beam and foundation plan ------------------------------------------------------------------------- Drawn by: Sheila Checked by: Aaron www.utm.my innovative ● entrepreneurial ● global 24
  • 25. MEASUREMENT OF QUANTITIES Height of column stump @100 c/c www.utm.my innovative ● entrepreneurial ● global 25
  • 26. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.2) Ground beam Size of ground beam:3.2.3) Formwork for ground beam Length=3048+3048=6096 Width = 229 Thickness = 3512/3/2/6.10 0.35 ---------- 25.62 26m2 ---------- www.utm.my innovative ● entrepreneurial ● global 26
  • 27. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.2) Ground beam Length = (length–2cover)+(2bend-3.2.4) Reinforcement bar Y10 for 2cover) ground beam =(6096-(2x50))+(2x351)-(4x50) = 64982/3/4/6.50 ---------- 156.00m x 0.62kg/m = 96.72kg ---------- 97kg www.utm.my innovative ● entrepreneurial ● global 27
  • 28. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.2) Ground beam Length of stirrup:3.2.5) R6 stirrup for ground beam Hook2/3/28/0.86 ---------- =(229-100)+(351-100)+(229-100)+(351- 144.48m x 0.22kg/m = 31.79kg 100)+100 ---------- =860 32kg No. of stirrup: Length of grd beam= 6096 =(6096/229)+1 = 28 nos. www.utm.my innovative ● entrepreneurial ● global 28
  • 29. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.3) Ground slab Area of slab = length x width3.3.1) Excavation for ground slab Depth of excavation = 500mm 150mm thick concrete slab 6.10 6.10 BRC A8 0.50 50mm thick sand ---------- 300mm thick 18.61m3 hardcore ---------- DPM 19 m3 www.utm.my innovative ● entrepreneurial ● global 29
  • 30. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.3) Ground slab Area of slab = length x width3.3.2) Reinforced concrete G30 in Depth of excavation = 500mm ground slab 150mm thick concrete slab 6.10 BRC A8 6.10 50mm thick 0.15 sand ---------- 300mm thick hardcore 5.58m3 ---------- 6 m3 DPM www.utm.my innovative ● entrepreneurial ● global 30
  • 31. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.3) Ground slab Area of slab = length x width3.3.3) Formwork for ground slab Depth of excavation = 500mm 150mm thick concrete slab 4/6.10 0.15 BRC A8 ---------- 50mm thick sand 3.66m2 300mm thick ---------- hardcore 4 m2 DPM www.utm.my innovative ● entrepreneurial ● global 31
  • 32. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.3) Ground slab Area of slab = length x width3.3.4) BRC A8 for ground slab Depth of excavation = 500mm 150mm thick concrete slab 6.10 6.10 BRC A8 ---------- 50mm thick 37.21m2 sand ---------- 300mm thick hardcore 37 m2 DPM www.utm.my innovative ● entrepreneurial ● global 32
  • 33. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.3) Ground slab Area of slab = length x width3.3.5) DPM for ground slab Depth of excavation = 500mm 150mm thick concrete slab 6.10 6.10 BRC A8 ---------- 50mm thick 37.21m2 sand ---------- 300mm thick hardcore 37 m2 DPM www.utm.my innovative ● entrepreneurial ● global 33
  • 34. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.3) Ground slab Area of slab = length x width3.3.6) 50mm sand blinding for ground Depth of excavation = 500mm slab 150mm thick concrete slab 6.10 BRC A8 6.10 50mm thick ---------- sand 37.21m2 300mm thick hardcore ---------- 37 m2 DPM www.utm.my innovative ● entrepreneurial ● global 34
  • 35. MEASUREMENT OF QUANTITIESProject: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.3) Ground slab Area of slab = length x width3.3.7) Hardcore for ground slab Depth of excavation = 500mm 150mm thick concrete slab 6.10 6.10 BRC A8 0.30 50mm thick ---------- sand 11.16m3 300mm thick hardcore ---------- 11 m3 DPM www.utm.my innovative ● entrepreneurial ● global 35

×