Riddor reportable hand injury
Upcoming SlideShare
Loading in...5
×
 

Riddor reportable hand injury

on

  • 410 views

Toolbox Talk - Good learning event in terms of pinch points...

Toolbox Talk - Good learning event in terms of pinch points...

Statistics

Views

Total Views
410
Views on SlideShare
410
Embed Views
0

Actions

Likes
0
Downloads
1
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Riddor reportable hand injury Riddor reportable hand injury Document Transcript

  • Toolbox Talk Riddor Reportable Hand Injury First RIDDOR reportable accident in 2 years for Fabricom North East Area; The Injured Person (IP) was assisting a Rigger along with a Mechanical Fitter in manoeuvring a piece of equipment from the external cantilever landing platform on the 32m level of the development in the CU 100 building. The IP is employed as a labourer and was paired up with Mechanical Fitter for the day. The operation was being carried out using a chain block. The item had to be moved approximately 6 meters through the doorway (See Fig 1.) Prior to the lift being carried out the equipment was tilted on its side to allow it to fit through the opening. This created an additional hazard as the feet (brackets which fix the equipment to the floor) protruded out beyond the body of the object. While moving the feet snagged on the scaffold boards which were laid on the floor through the doorway. In order to free up the snag and move the equipment through the doorway it had to be lifted a few millimetres, during this process the IP was steadying the equipment (with both hands) to prevent it from being damaged. The equipment was lifted using a chain block to support and free it up from its entrapment. The equipment then swung to the right hand side of the door catching the IP’s hand between the doorframe and the equipment. At the time of the incident the IP was wearing the correct PPE, including general purpose nylon gloves, appropriate footwear and overalls. Fig 1 – Doorway the equipment was being manoeuvred through. Chain blocks hung from the head of the door. Scaffold boards that the equipment snagged on.
  • Toolbox Talk Riddor Reportable Hand Injury Fig 2 – Equipment being manoeuvred during the lift. The IP was assessed by Fabricom first aider shortly after the incident where he stated his hand was sore, there was also minor swelling. There was a graze at the point of contact as well as some minor bruising to the area. As the graze was bleeding it was cleaned, then dressed with a plaster. The IP reported that he was experiencing very little pain of the hand and was happy to return to work. The IP carried on working for the remainder of the day. At 7.30am the following morning the IP was asked to report to the Fabricom health and safety office to have his condition re-reviewed by all parties including the Jacobs’ Health and Safety Manager. The injury was subjected to a further inspection by Fabricoms first aider and during this consultation it was recommended that the IP went for an x-ray. The x-ray concluded that the IP had experienced a hairline fracture of the second metacarpal on his right hand. The medical centre also taped together IP’s index and middle fingers together. The IP was given a course of antibiotics and asked to report back on the 27th June for a further x-ray to ensure the fracture is healing. The IP has not lost any time from work and has carried out normal duties which include standby fire and entry activities. Due to the incident involving a fracture it was reported under RIDDOR. So what went wrong?  The IP had not stopped and thought “WHAT IF” about the hazards and dangers involved to fully appreciate what could have went wrong.  The IP should have avoiding placing hands within the pinch point area, another method of steadying the equipment should have been sought, e.g. tag line / Push stick.  The risk assessment did not adequately cover the task in hand, e.g. the control of the pinch point hazard adequately. The item was unwieldy and difficult to manage in such an enclosed area.
  • Toolbox Talk Riddor Reportable Hand Injury Corrective / Preventative Measures:  Fabricom to re-emphasise the importance of planning and assessing all lifting and manual handling operations. Employees need to cover every eventuality and think about what could potentially go wrong. If any unexpected issues arise which previously have not been thought about then the task should be stopped (providing it is safe to do so) and a further assessment made to overcome the issue in a safe manner.  Behavioural safety sessions have been delivered regarding hand safety to heighten awareness and reduce complacency with regards to hand safety and putting them in the line of fire.  All risk assessments to be reviewed prior to submission to client to ensure they are suitable and sufficient for the task in hand. Improve the control measures detailed on all risk assessments in relation to pinch points,  The pre-task risk assessments should be utilized to identify pinch points and controls to be used to prevent injuries. The IP has a very positive attitude towards safety in general; he had carried out a pre-task risk assessment for the day in relation to the activities on the 32m cantilever platform but failed to properly assess the risks and potential outcome of the activity prior to starting this task. Carrying out a point of work risk assessment as a team (involving all three individuals) prior to this undertaking could have identified the chance that in manoeuvring a such an item thorough a tight opening leaves the potential that your hands could end up in the line of fire and precautions could have been taken to avoid such an injury. During the induction process Fabricom emphasise the importance of hand safety and these injuries represented the largest proportion of incidents in 2012. The golden rules for hand safety have been set up to combat this, with the following being of particular relevance;- Fabricom Golden Rules of Hand Safety – Number 6 Always keep hands away from pinch points and crushing hazards.