Your SlideShare is downloading. ×
How pdca cycle used in context of TQM
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

How pdca cycle used in context of TQM

4,089
views

Published on

Published in: Education

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
4,089
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
202
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. HOW PDCA CYCLE USED IN CONTEXT OF TQM To Prof GARIMA GUPTA BY PADIGA AKHILESH GO6155
  • 2. PDCA CYCLE
  • 3. TOTAL QUALITY MANAGEMENT
  • 4. PDCA & TQM DOSTI!! The basic need of TQM is continuous improvement. PDCA TQM In this competition world if you are not in the race you will loss. For this continuous improvement purpose PCDA cycle acts as a best tool, so as to achieve Quality Also called as deming cycle
  • 5. PROCESS TO OBTAIN TQM BY PDCA Select the project in which TQM to be achieved Grasp the present status Analyze the cause Determine the corrective action Implement corrective action Check the effects in terms of quality Take appropriate action Conclude and future plans to obtain TQM
  • 6. PLAN
  • 7.  Select the project in which TQM TO BE IMPLEMENTED -Project background and reasons for selection -Set a target -Prepare a schedule of activities Grasp the Current status Analyze the cause and Determine the Corrective Action -Prepare cause and effect diagram -Prepare a hypothesis and verify most likely causes -Document the corrective action
  • 8. DO
  • 9. • Implement the corrective action Prepare instructions and flow charts for complicated procedures Adequate training must be provided Follow the plan exactly Record any division from plan and collect thedata on results
  • 10. CHECK
  • 11. • Check the Effect of corrective action – Compare over all results – Analyse failure to achieve results – Results achieved
  • 12. • Check appropriate action – Documentation, standardisation and control – Training – Decide on future plans – The well known seven quality control tools may be used in this process
  • 13. CONCLUSION• PDCA is a powerful tool to obtain TOTAL QUALITY MANAGEMENT in any sector not only in construction sector.• But it should be followed and implemented perfectly to see its fruits!!
  • 14. • REFERENCE A PAPER BY B.GIRISH, NATIONALPRODUCTIVITY COUNCIL, CHENNAI

×