Your SlideShare is downloading. ×
0
Tqm Tool1
Tqm Tool1
Tqm Tool1
Tqm Tool1
Tqm Tool1
Tqm Tool1
Tqm Tool1
Tqm Tool1
Tqm Tool1
Tqm Tool1
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Tqm Tool1

2,453

Published on

1 Comment
2 Likes
Statistics
Notes
No Downloads
Views
Total Views
2,453
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
135
Comments
1
Likes
2
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. TOOLS OF TQM Abdulla Jassim Abdulla
  • 2. INTRODUCTION <ul><li>Data-Driven Methodology </li></ul><ul><li>Data generated by processes </li></ul>Statistical interpretation Seasonal variations New Technology
  • 3. THE ‘SEVEN SIMPLE TOOLS’ <ul><li>Flowcharts </li></ul><ul><li>Cause and Effect (Ishikawa / fishbone) Diagrams </li></ul><ul><li>Check sheets </li></ul><ul><li>Pareto Charts </li></ul><ul><li>Histograms </li></ul><ul><li>Run Charts and Control Charts </li></ul><ul><li>Scatter plots and Correlation Analysis </li></ul>
  • 4. FLOWCHARTS <ul><li>Remember system theory: (Input, Output, customer supplier and their interactions). </li></ul><ul><li>Divide complex processes into simple sub-processes. </li></ul><ul><li>A Qualitative tools </li></ul>
  • 5. Patient Transport Process Example Request made Log & prioritize request Dispatch transport Take patient to X-ray Doctor determines patient needs X-ray Information taken & request is logged Required equipment is found Transporter arrives on ward Ward contacts dispatcher Request prioritized Transport is dispatched Patient transferred from bed Patient taken to X-ray
  • 6. Types of Flowcharts <ul><li>LAYOUT FLOWCHART </li></ul><ul><li>Example Staff movement </li></ul><ul><li>DATA FLOW DIAGRAMS </li></ul><ul><li>leave approval process </li></ul>
  • 7. ISHIKAWA DIAGRAMS <ul><li>Also known as Fishbone or Cause-and-Effect Diagrams </li></ul><ul><li>Non-quantitative tools (Qualitative) </li></ul><ul><li>Sometimes called the 5M Diagram (Men, Machine, Materials, Measurements and methods) </li></ul>
  • 8. ISHIKAWA DIAGRAM
  • 9. CHECKSHEETS <ul><li>Central tool for Quality Assurance programs </li></ul><ul><li>Specially useful for operational procedures </li></ul><ul><li>Could be derived from the flowchart and fishbone diagrams </li></ul>
  • 10. Example check sheets 12 IIIII IIIII II Patient having another exam etc. 3 III Not enough staff 7 IIIII II Patient not ready 5 IIIII Equipment broken Subtotal Tally Type Area: Ward 3b Period: June 1996 Patient Transport Problem Sheet

×