Element site preparation new

1,391 views
1,250 views

Published on

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,391
On SlideShare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
51
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • C 2381 - UKUR KERJA BANGUNAN
  • C 2381 - UKUR KERJA BANGUNAN
  • C 2381 - UKUR KERJA BANGUNAN
  • C 2381 - UKUR KERJA BANGUNAN
  • C 2381 - UKUR KERJA BANGUNAN
  • C 2381 - UKUR KERJA BANGUNAN
  • C 2381 - UKUR KERJA BANGUNAN
  • C 2381 - UKUR KERJA BANGUNAN
  • C 2381 - UKUR KERJA BANGUNAN
  • C 2381 - UKUR KERJA BANGUNAN
  • C 2381 - UKUR KERJA BANGUNAN
  • C 2381 - UKUR KERJA BANGUNAN
  • C 2381 - UKUR KERJA BANGUNAN
  • C 2381 - UKUR KERJA BANGUNAN
  • C 2381 - UKUR KERJA BANGUNAN
  • C 2381 - UKUR KERJA BANGUNAN
  • C 2381 - UKUR KERJA BANGUNAN
  • C 2381 - UKUR KERJA BANGUNAN
  • C 2381 - UKUR KERJA BANGUNAN
  • Element site preparation new

    1. 1. CQ103 – BUILDING WORKS MEASUREMENT 1 Prepared by: RUHAIZAT BINTI JUBRI Lecturer Quantity Surveyor Unit Civil Engineering Department POLIMAS
    2. 2. Site Preparation/Site Clearance SMM2 / SECTION D / Page 16Site Preparation / Site Clearance is a work ofclearing the ensure that the project site, ready tobuilt the buildingThe work involved as follows: -4.Clearing of grass, shrubs.5.Cutting trees.6.Take out their root.
    3. 3. Site Clearance / Site Preparation
    4. 4. Site Clearance / Site Preparation
    5. 5. Site Clearance / Site Preparation
    6. 6. 105.00m Symbol : *** Bushes & * * * * U= *** Grass 950 Hedges * * 45000 U= * 1050 * * U= Tree * ** 850 * * * * * 210.00m Girth * U= 550 * U * U= 450 * U= 250 * * U= U= 290 * 650 * 39000 U= * 1100 U= * 1005* * U= 1050 145.00m SMM2 T.O LIST
    7. 7. 105.00m Symbol : *** Bushes & *** Grass Hedges Tree 210.00m Girth U145.00m SMM2 T.O LIST
    8. 8. CQ Taking Off ListBil Item Unit1. Clearing undergrowth m22. Cutting down trees not exceeding 300mm girth No3. Cutting down trees 300mm b.n.e 600mm girth No4. Cutting down trees 600mm b.n.e 900mm girth No5. Cutting down trees 900 b.n.e 1200mm girth No6. Cutting down hedges m SMM2 SITE PLAN
    9. 9. CQ Clearing site Cutting down trees Area Ave. length Cutting down trees n.e 300mm 105.00 girth at 1.00m high above Add 145.00 ground level and grubbing up 2 their roots and filling voids left 2 250.00 by removal of roots with 2 material arising from 125.00 excavation Width 210.00 Cutting down trees 300mm Clearing site of undergrowth, b.n.e 600mm girth at 1.00m125.00 bushes, scrub and the like and high above ground level and210.00 grubbing up their roots 2 grubbing up their roots and 26250.00 2 filling voids left by removal of roots with material arising from excavation SMM 2 T.O List SITE PLAN
    10. 10. Cutting down trees U = Girth 1mAccording to D5 SMM2 page 16 SECTION D SMM 2 T.O List SITE PLAN
    11. 11. Cutting down trees U = 900 U = 250 U = 300 U = 450 U = 550 U = 1000Not exceeding 300 2 nosExceeding 300mm but not exceeding 600 2 nosExceeding 600mm b.n.e 900mm 1 noExceeding 900mm b.n.e 1200mm 1 no SMM 2 T.O List SITE PLAN
    12. 12. Cutting down hedges Length HighAccording to D2SMM2 page 16 SECTION D SMM 2 T.O List SITE PLAN
    13. 13. CQ Cutting down Cutting down trees hedges length Cutting down trees n.e 600mm 45000 b.n.e 900mm girth at 1.00m Add 39000 high above ground level and 840002 grubbing up their roots and 2 filling voids left by removal of roots with material arising from Cutting down hedges average excavation 900mm high and grubbing up their roots and filling voids left 84.00 by removal of roots with 84.00 material arising from Cutting down trees 900mm excavation b.n.e 1200mm girth at 1.00m high above ground level and5 grubbing up their roots and 5 filling voids left by removal of roots with material arising from excavation Sekian SMM 2 T.O List SITE PLAN
    14. 14. T.Off List SITE PLAN STANDARD METHOD OF MEASUREMENT (Building Works) SMM 2 SECTION D Page 16 Item Description Explanation of Explanation of (Taking Off List) taking-off measurement1. Clearing site 1. Clearing site of D.3 –Removal of Title of work shall undergrowth bushes, vegetation that was be described to scrub & the like & cut does not need to facilitate grubbing up their be mentioned review roots because of the work included in the D.3 – Site clearance must7. Cutting down • Cutting down trees measurement items be measured in m2. trees n.e 300mm girth at 1.oom high above D.4 - Give back filling the D.4 – Cutting tree must ground level & hole dug where be measured in no. grubbing up their necessary and work roots & filling voids are separated by left by removal of cutting trees in the roots with material tree circumference arising from measured at 300mm excavation D.23 – Specify the type • Ditto; 300mm b.n.e of material used to 600mm girth; ditto bury behind the hole according to the • Ditto; 600mm b.n.e classification given. 900mm girth; ditto • Ditto; 900mm b.n.e 1200mm girth; ditto
    15. 15. 105.00m Symbol : *** Bushes & * * * * U= *** Grass 950 Hedges * * 45000 U= * 1050 * * U= Tree * ** 850 * * * * * 210.00m Girth * U= 550 * U * U= 450 * U= 250 * * U= U= 290 * 650 * 39000 U= * 1100 U= * 1005* * U= 1050 145.00m SMM2 T.O LIST
    16. 16. T.Off List SITE PLAN STANDARD METHOD OF MEASUREMENT (Building Works) SMM 2 SECTION D Page 16 Item Description Explanation of Explanation of (Taking Off List) taking-off measurement1. Cutting down 1. Cutting down hibiscus D.2 – state the type and Title of work shall hedges hedges average high of cutting down be described to 900mm high & hedges facilitate grubbing their roots review D.2 – Cutting down hedges shall be measured in m
    17. 17. SEKIAN TERIMA KASIH05/23/12
    18. 18. KUIZ 1 masa: 10Minit1. Specify the type of material used to bury behind the hole according to the classification given. Specify the girth "diameter" trees that should be considered in the work of cutting trees (5 Markah)2. State the unit of measurement for the following work: -vi. Clearing sitevii. Cutting down treesviii. Cutting down hedges (5 Markah)
    19. 19. 103.45m Symbol : *** Bushes & * * * * U= *** Grass 750 Hedges * * 45000 U= * 1250 * * U= Tree * ** 750 * * * * * 207.50m Girth * U= 650 * U * U= 350 * U= 220 * * U= U= 350 * 650 * 39000 CADANGAN MEMBINA DAN U= MENYIAPKAN SEBUAH * 1250 BANGLO 2 TINGKAT DI U= * LOT 123 MUKIM AMAN, 1050 JITRA* * U= 1050 155.00m Drwg No: CQ103/SC/STD WK 1/DUB 1

    ×