Case study for lambeth hospital    london
Upcoming SlideShare
Loading in...5
×

Like this? Share it with your network

Share

Case study for lambeth hospital london

  • 210 views
Uploaded on

Airtherm have designed, supplied and installed two twin wall flue systems at Reay House and Oak House at Lambeth Hospital. Working in conjunction with AC Preou Limited both systems were installed......

Airtherm have designed, supplied and installed two twin wall flue systems at Reay House and Oak House at Lambeth Hospital. Working in conjunction with AC Preou Limited both systems were installed to the clients schedule and commissioned on time.

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
210
On Slideshare
210
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Project Profile Lambeth Hospital, Lambeth - London Client ■ Lambeth Hospital Contractor ■ AC Preou Limited Sector Front Entrance ■ Primary Health Care Products ■ Masterflue Equipment ■ Ideal Boilers Application ■ Atmospheric Reay House Boiler Room Installation of twin wall flues Airtherm worked closely with the contractor AC Preou Limited with the supply and installation of two boiler house refurbishment of Reay House and Oak House at Lambeth Hospital, London. The existing plant was removed by the contractor and replaced with more modern efficient system, supplied by Ideal commercial. Airtherm installed both flue systems simultaneously and completed the works within two working days to meet with the clients shedule of works. 0844 809 2509 | airtherm.co.uk | info@airtherm.co.uk
  • 2. Product Solution • Application: Chimney / Flue system Operating mode: Dry • Pressure: Negative pressure • Working pressure: 50 Pa (product will operate 300pa max) • Inner wall: 316L1.4404/1.457 thickness 0,6 mm • Outer wall: 304/ 1.4301 thickness 0,5 • Insulation: 25mm thick Rockwool insulation • Sealant : Tri-lip 'o' type silicone ring • Fuel type: Gas • Fan Assisted: Bifurcated • Other Application our MF Flues can be used: • Condensing boilers • Atmospheric gas-fired boilers • Contact Details: Concord • Existing flues Model: • Installation of primary flues Ideal • Oak House Boiler Flue System Boilers: Gas blown boilers • Industrial ovens, large-scale establishments • Wood-fired stoves Airtherm Engineering Ltd Unit 8A, Gainsborough Trading Est Stourbridge West Midlands DY9 7ND Tel: 0844 8092509 Fax: 01384 375218 0844 809 2509 | airtherm.co.uk | info@airtherm.co.uk