Your SlideShare is downloading. ×
AIESEC Acadmy | PODIO Basics (OGX)
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

AIESEC Acadmy | PODIO Basics (OGX)

359

Published on

Published in: Business, Technology
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
359
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
10
Comments
0
Likes
1
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. BASICS
  • 2. OBJECTIVE & MENTOR Lear all the PODIO’s basics so you get used to the flow of information, the structure, the elements and all the apps of your LC’s workspace. Mentor Jennifer Reyna Portugal – – – – – 2012 VP OGX LC León. 2013 CCP National Recruitment Team 2013 NST OGIP Block Manager 2013 CEEDER LC ULB Belgium MCB OGIP Small Cluster
  • 3. LATAFORMS
  • 4. PTIMIZE • Filter made by MC- National Registration • Local Allocation – 24 to 48 hrs. max.
  • 5. EVELOPE
  • 6. EVELOPE
  • 7. EVELOPE
  • 8. EVELOPE • Specific date required for the Process to be done in a standardize way. • The amount of time (hours) required for the process to be finished, set in the date of approval by the MC or NST. • Bar that shows the current % of the process accomplished so far.
  • 9. EVELOPE • Specific date required for the Process to be done in a standardize way. • The amount of time (hours) required for the process to be finished, set in the date of approval by the MC or NST. • Bar that shows the current % of the process accomplished so far.
  • 10. EVELOPE
  • 11. NTEGRATE • Believe it or not… AUDITS WILL BE NOW MADE IN PODIO!!! • 3 Working days to respond!
  • 12. NTEGRATE BE CAREFUL If an LC has more than its 40% of registered EP’s on 25% it may loose this benefit.
  • 13. NTEGRATE
  • 14. RIENTATE & RGANIZE • Spread PODIO knowledge to your members!!! • Specially EP Managers.
  • 15. RIENTATE & RGANIZE There will be RESISTANCE AGAINST CHANGE but GUIDE THROUGH the process. After all… There is a reason why you are a LEADER.
  • 16. RGANIZE & RIENTATE Select and we educate a PODIO expert in your team. Use PODIO also as communication channel. Let all your team experiment with PODIO and be frequent users.
  • 17. THANK YOU!!! For further information please contact: jenn.reynap@aiesec.net

×