• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Powerpoint Presentation For Edd Polaski
 

Powerpoint Presentation For Edd Polaski

on

  • 1,039 views

visual presentation of professional and scholastic history

visual presentation of professional and scholastic history

Statistics

Views

Total Views
1,039
Views on SlideShare
1,032
Embed Views
7

Actions

Likes
0
Downloads
0
Comments
0

1 Embed 7

http://www.linkedin.com 7

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Powerpoint Presentation For Edd Polaski Powerpoint Presentation For Edd Polaski Presentation Transcript

    • Edd Polaski
      Employment History and Construction projects review
    • Dear Reader
      I believe that I have a proven record of accomplishments including organizational and management skills along with attention
      to detail, from the ten plus years that I have been in this field. I am confident that I bring the strengths necessary to complete
      my assignments readily and effortlessly.
       My eagerness comes from my desire to learn about the trade. Over the years I have accepted different positions in order to
      broaden my background while learning, growing, and trying to understand all aspects of construction management, as I worked
      my way through college .
       While employed, some of the responsibilities that I have come to understand were successfully managing multiple simultaneous
      projects while consistently meeting the strict deadlines and budgets . During the course of my career, I have also:
      • Successfully managed, directed, and provided technical guidance for construction crews, consisting of both union
      and non-union employees
      • Supervised the tactical planning and implementation of various construction projects ranging from $10,000 to $2 Million
      • Administered, maintained and developed construction documents for their successful completion
      • Preserved a line of open communication between the client, vendor, and sub-contractors for the life of a project
      • Prepared, reviewed, and coordinated schematic, preliminary and working drawings for projects
      • Sustained an efficient work habit capable of managing multiple projects, working autonomously and providing leadership where needed
      • Provide detailed phase schedules, programming and code reviews of projects
      • Cultivated effective time management skills, maintained the ability of swift analysis, reacted to complex issues, refined problem-solving skills, and to confidently and decisively take action when needed
      • Developed cost analysis of projects for internal and external work forces based on architectural drawings and programs
      Thank you in advance for taking the time to review my work.
      Edd Polaski
       
    • Resume
    • Industry Honors and Awards
      Customer Service Award – Bank of America
      New England Team Building Award – CBRE
      ATM Service Installation Award – CBRE
      Treasure Hunt development Award – CBRE (leadership & team building)
    • Scholastic Honors
      Golden Key Honor Society – 2009
      (awarded to top 15% of graduate students at East Carolina Univ. )
      Sigma Lambda Chi – 2010
      (International Construction Honor Society)
      Phi Kappa Phi – 2010
      (awarded to top 10 % of graduate students at East Carolina Univ. )
      Current gpa 4.0
    • Massachusetts Financial ServicesMFS
      Duties
      Design, organize, implement and maintain relocation of main office & home office personnel in Boston and surrounding towns
      Maintain as-built drawings to reflect occupancy and current furniture layout
      Develop and maintain extensive database for management of assets including but not limited to artwork, furniture, telecommunication equipment
      Develop and test personnel databases for operator services including physical location, name, telephone numbers and other telecommunication information
      Direct liaison for office reconfiguration with local contractors
      Also supported the IT department and served as a technical consultant for email server operation
    • Project Manager as consultant to larger corporations, Tufts Health Plan and John Hancock, Fleet Bank, Sovereign Bank including lock-box relocation
      Corporate moves and relocations
      Oversee departmental corporate projects in telecommunication & construction
      Managed downsizing of corporate headquarters for health and business centers
      Manage client expectations & issues
      Diversified Project Management
    • Verrillon Inc(formerly Intelcore)
      Duties
      Organize and implement relocation of office & research personnel from Boston to Grafton, Ma
      Design space plan for office layout
      Negotiation and execution of furniture space plan, furniture selection/installation, clean room cleaning & maintenance, database design/management, signage design/installation, and negotiated H.V.A.C. maintenance contracts.
      Assist Senior Project Manager with construction of Single Mode Fiber Optic manufacturing plant in Grafton, Ma.
      Develop voice/data network for new and existing locations
      Present study of signage for corporate review, Provide documentation for bid review
      Designed and selected vendors to manage the installation of the VoIP data/communications network for this 65,000-square foot specialty fiber optic production facility. Oversaw the installation process from incubation to completion with vendors and the IT department.
      Also supported the IT department and served as a liaison to remote offices.
    • The May Company Dba Filene’s
      Eastern New England Department Store Chain of 67 stores now closed
      Designed, managed and provided turn key operation for all internal personnel movement
      Project Manager in Construction Department
      Manage high profile interior specialty retail projects
      Completed over 200 fast paced projects
      Created and maintained departmental database to monitor contracts, change/purchase orders and all financial accounting for department
      Manage client expectations & issues
    • CB Richard Ellis
      TCC (Trammel Crow Company) merged into CB Richard Ellis (Project & Property Management Corporation)
      Project Manager for ATM and Minor Renovation team
      Manage multiple concurrent high profile installations across the United States for the Bank of America account
      High degree of continental travel, 140 separate flights in one year
      Interact with multiple bank managers and office personnel through-out an extensive corporate environment
      Proficient in multitasking, managing multiple separate regional projects, controlling costs, meeting minutes, RFI’s, contract negotiation, scheduling of contractors, architects and various subcontractors
      Projects include office expansions, bank renovations, and new ATM installations
      Manage client expectations & issues
    • 2008 Project Territory
      My projects for 2008
    • Treasure Hunt
      Developed an interactive means for all corporate employees to learn about the company through a treasure hunt website. This website featured various questions about the organization which employees were asked to discover information
      With help of the corporate HQ in Charlotte, N.C. development, management and monitoring this hunt as the sole manager
    • Projects
      Manhattan, Bronx, Florida & North Carolina ATM installations
      Manage security, all financial documentation and interaction of site development with Bank of America corporate managers & weekly meetings
      Manage installation with weekly onsite visits
      Manage client expectations & issues
    • Minor Renovations duties
      Renovate existing Bank of America branches while bank was operational
      Construction must refrain from interfering with customers
      Existing conditions with furniture must remain while under construction
      Replace carpeting, seating, remove wall covering, repair walls and repaint, installation of flat panel monitors and telecommunication equipment and teller windows with bullet proof technology
    • ATM & Renovation Locations
      Arizona
      Connecticut
      Delaware
      Florida
      Maine
      Massachusetts
      New York City
      North Carolina
      Pennsylvania
      South Carolina
      Tennessee
      Texas
      Virginia
      Washington DC
      Project territory for 2006-2008
    • Archer Corporation
      Architectural Millwork Installation Company
      Management of staff union carpenters
      Multiple projects ranging from $5K to $1M
      Maintain financial documentation, communication with client and staff, maintain leadership skills while mentoring staff, helps team execute career development plans and reviews the status reports of team members and addresses issues as appropriate.
      Manage issues and client expectations
    • Project Assignments
      $750 million biologics manufacturing facility for Bristol Myers Squibb. Phase I of the project includes four main buildings: a BioPharma manufacturing facility, a central utility building, an administrative/quality research laboratory and a warehouse/storage structure.
      Project consists of installation of Stainless Steel cabinetry, epoxy countertops as well as enamel coated laboratory cabinets and fume hoods into a laboratory environment.
      Managed a constant crew of 15 carpenters, time sheets, union payroll, client communication, invoicing and billing, plan reading, estimating and schedule forecasting.
    • Hospital Millwork Install
      Ten month, multi-level, 14 carpenter installation of hospital millwork.
      Stainless Steel cabinetry, corian window sills, curved hand and bumper rail, plastic laminate cabinets and countertops, wooden elevator panels, portals and wood entries, MRI cabinetry, linear accelerator room cabinetry
      Wooden Portals, Paneling and Laboratory Rooms, Reception Areas and Handrail
      Manage issues and client expectations
    • College Research Laboratory
      $1M Laboratory installation of wood cabinets, epoxy countertops, stainless steel clean rooms, fume hoods, eye wash stations
      12 full time carpenters, 3 months installation, phased construction
      Floor Mounted & Suspended Strut
    • Newsletter
      Created & designed company newsletter
    • References
      References and letters available upon request
      Please send an email for a complete list of projects
      Thank you in advance for taking the time to review my work
      Edd Polaski
      eddpolaski@verizon.net
      (781) 925-9945