• Save
New Features May 25 2009
Upcoming SlideShare
Loading in...5
×
 

Like this? Share it with your network

Share

New Features May 25 2009

on

  • 653 views

 

Statistics

Views

Total Views
653
Views on SlideShare
565
Embed Views
88

Actions

Likes
0
Downloads
0
Comments
0

4 Embeds 88

http://www.agilebuddy.com 76
http://agilebuddy.com 9
http://www.staging.agilebuddy.com 2
https://www.agilebuddy.com 1

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

New Features May 25 2009 Presentation Transcript

  • 1. New Features Simplifying Scrum Online May 25 2009
  • 2. Agilebuddy is now integrated with SVN SVN Integration If you use SVN as your source code repository you now have a way to track the full end-to-end development lifecycle
  • 3. With SVN integration, you will be able to: SVN Integration
    • Auto-link to Agilebuddy User Stories, Tasks and Bugs from SVN commit messages
    • View source control history through Agilebuddy’s activity feeds
    • View source control commit history contextually by User Story, Task or Bug
    • Link to SVN commits from the activity feed for direct source code inspection
  • 4. SVN Integration To start integrating Agilebuddy with SVN you must be an administrator. Click on the Administration link on the top right side of your Agilebuddy screen. And then click on the repositories tab
  • 5. SVN Integration Click on show configuration details for detailed instructions on how to configure SVN integration
  • 6. SVN Integration Follow the configuration details as described below
  • 7. Move Tasks Agilebuddy now lets you move Tasks When you edit a Task, select the User Story drop down to move the Task between User Stories
  • 8. Export to CSV You are now able to export whatever you are doing in Agilebuddy into a CSV file
  • 9. Export to CSV Just select Export to CSV and save the Sprints User Stories to a CSV file
  • 10. Agilebuddy has added a new smart action menu Action Menu Just select the drop down menu to do any of the following actions
  • 11. Action Menu If you are working on a task “start” would be the default, and after you click “start”, then “stop” is defaulted Our smart menu defaults to the most obvious action and updates based on status.
  • 12. For assistance or support please email: [email_address] For sales inquiries please email: [email_address]