• Save
New Features March 30 2009
Upcoming SlideShare
Loading in...5
×
 

New Features March 30 2009

on

  • 651 views

 

Statistics

Views

Total Views
651
Views on SlideShare
584
Embed Views
67

Actions

Likes
0
Downloads
0
Comments
0

5 Embeds 67

http://www.agilebuddy.com 56
http://www.staging.agilebuddy.com 4
https://www.agilebuddy.com 4
http://agilebuddy.com 2
http://www.linkedin.com 1

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    New Features March 30 2009 New Features March 30 2009 Presentation Transcript

    • Simplifying Scrum Online New Features Mar 31st 2009
    • Acceptance Test Criteria Agilebuddy has added acceptance test criteria to user stories. If you add acceptance tests to a user story, the following states apply: “open”, “in progress”, “in test” or “accepted”
    • Acceptance Test Criteria The acceptance test can be seen on the sprint page, under each user story. Simply scroll over the “acceptance test” text to view your criteria and if the test has been passed
    • Acceptance Test Criteria The acceptance test is also visible on the user story details page
    • Acceptance Test Criteria Create acceptance tests in two ways: 1) Click on the acceptance test icon 2) Create an acceptance test on the user story details page
    • Acceptance Test Criteria Once you have created an acceptance test, from the user story details page, you can toggle between pass and fail to change the user story from “in test” to “accepted”
    • For assistance or support please email: support@agilebuddy.com For sales inquiries please email: sales@agilebuddy.com