Cuenca National High School                                                                                               ...
Cuenca National High School                                                                                               ...
Upcoming SlideShare
Loading in …5
×

P

435 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
435
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

P

  1. 1. Cuenca National High School Pugo, La Union PRIORITY IMPROVEMENT AREAS SY 2010 – 2011 RESOURCE REQUIREMENTS AMOUNT SOURCE OBJECTIVES PROJECTS/PROGRAMS ACTIVITIES TIMEFRAME HUMAN FINANCIAL MATERIALS OF FUNDS OF FUNDS 1. To increase NAT NAT REVIEW 1. Analysis of NAT School Head Cost of NAT reviewers November – P/ 1,000.00 MOOE MPS by 2% as of last ENHANCEMENT results based on Teachers Review Instructional March 2011 year’s result PROGRAM least mastered Second Year materials materials competencies Students 2. Arranging review classes and schedule of reviewers 3. Conduct of review enhancement classes 2. To reduce drop-out RETAINING THOSE 1. Identifying School Head Cost of EASE Modules Year Round P/ 1,000.00 MOOE rate by at least 2% as of WHO ARE IN SCHOOL SARDO’s Teachers reproduction last year’s rate 2. Screening SARDO’s of the SARDO’s modules qualified for the program 3. Scheduling of teachers and SARDO meetings 4. Offering of modular classes 3. To enhance teaching – PROJECT EC – ICT 1. Mentoring School Head Cost of ICT Laptop, desktop Year Round P/ 5,000.00 MOOE and learning capacity 2. Peer Coaching Teachers Materials computers, BESRA – building skills of 3. Data base Students internet, LCD SBM Grants
  2. 2. Cuenca National High School Pugo, La Union teachers and students. gathering on ICT projector, integrated lesson storage devices, plans and printers, materials printouts 4. To improve physical COMPLETION OF THE 5. Source out funds School Head Cost of Boulders, bags October - P/ 250,000 Grants and facilities. SCHOOL PERIMETER through a link PTA Officers construction of cement. Sand March Donations FENCING with the local Teachers materials and gravel, government steel bars, REHABILITATION OF units. hollow blocks, THE PTA BUILDING 6. Resolution galvanized iron requesting the mayor, governor and the congressman for funds and material assistance

×