1. Case Study on Specification Achieved.- Alccofine Marketing Team
High Caliber Specification Achievement for ALCCOFINE 1203 in NHAI Project
Project: Four laning of Ahmadabad to Godhra Section of NH 59 from KM 4.200- 122.420 on DBFOT scheme
under NHDP-III.
Salient features with SCOPE of ALCCOFINE 1203
1. Grade of Concrete used: M60 and M 45
2. Type of construction segment: PSC girders of 4.Mt X2.1MX0.56 Mts Avg
3. Concrete quantity per girder: 45 Cum
4. Total numbers of girders: 60 nos ( balance to be done).
5. ALCCOFINE specified per Cum : 40 Kgs.
6. Total ALCCOFINE scope: 108 Mts
7. ALCCOFINE 1203 Supplied : 32 Mts
8. Cement used: UTCL
9. Sand and Aggregates: Local source- Ahmadabad.
10.Admixture used: Fosroc Auromix 400
11.Accelerated curing tank: AIMIL.
What triggered use of ALCCOFINE 1203:
They wanted to reduce the cycle time of PSC girders and wanted to
utilize the space on time scale optimization
We suggested the Mix with ALCCOFINE 1203 for early strength.
Independent Engineers
PPP and Client
Total PMC
Concessionaire
Contractor
APPROVERS
Already specified : Microsilica 920 D
Got approval for : ALCCOFINE 1203
2. Case Study on Specification Achieved.- Alccofine Marketing Team
High Caliber Specification Achievement for ALCCOFINE 1203 in NHAI Project
Project: Four laning of Ahmadabad to Godhra Section of NH 59 from KM 4.200- 122.420 on DBFOT scheme
under NHDP-III.