By Group 7 –
ASHISH JHA - 20
ISHANI DAS - 37
POOJATIWARI - 53
RAMYA RAVIKUMAR - 61
SHIVAM NIGAM - 72
ABHISHEKTIWARI - 84
VINAY PILLAI - 86
Hospital – SEHAT
Customer name – Dr Siya Bharadwaj
Project Co-ordinator - Ms.Punya Awasthi
 Ms. Siya Bharadwaj, a MBBS from AIIMS has come
back to her home town Kanpur and wants to start a
hospital at a small level of 20 bed capacity.
 For this she has come to a professional Ms.Punya
Awasthi, who has an experience in forming project
proposal and helping in implementing it.
 She has an aim to help people by taking care of
health issue and a commercial aim to get at least
15% ROI.
 Project Scope Statement :
Design, construct and equip a local hospital and
securing necessary funds for constructions of a 20
bed capacity general hospital in the city of Kanpur.
The project aims at providing an ROI of 15% and is
to be started by 25th July 2014 by completing the
project without exceeding the budget of 5.61 crores.
 Project Objectives:
• To complete the project within the time boundary
i.e. 30th September 2015.
• To ensure that the project is completed within the
given budget.
• To earn adequate return on investment.
• To ensure that the supplies are timely.
 Project sponsor :
Bharadwaj and Sons 40%
Bank 60%
 Customers:
The customer or we can say beneficiaries of the
project are the people in the region who don’t get
good and timely medical facilities.This project will
serve the men, women and children by providing
the best health care facilities.
 Summary of EconomicViability:
• Phase 1: This phase involves running of a hospital
for patients in the region. It is proposed to establish
this 24*7 facility in a 5,000 square feet space in the
region.The unit will have separate facilities for
male, female and children.The estimated land cost
is INR 70 lakh which is expected to be funded by
Bhardwaj & sons and by bank loan.
• Phase 2: This phase involves the establishment of a
20 bed hospital in about 5000 square feet of land.
The hospital will have a built up area of 5,000 square
feet.
• Phase 3: This involves the recruitment and
marketing.
• The estimated project cost is 5.61 crores.
• This whole project is a health care facility so focus
is not on profit gain. But since the sponsors are
involved so this project aims at 15% ROI.
 Preliminary Stakeholders Analysis
• Project Sponsor: Kashinath Bharadwaj, Executive
Vice President, Bhardawaj & sons
• Bank: HDFC Bank
• Project Manager: Ms. Punya Awasthi
• Key person of project: Ms. Siya Bharadwaj
Major Deliverables
Deliverables Description
Deliverable 1- System Design
Study the hospital’s requirement and needs.
Getting statutory approvals.
Deliverable 2 - Construction Procurement of land
Legal Approval
Hiring an Architect for designing
Hire a contractor for construction
Deliverable 3 – Equipment
Quotations and Contracting fromVendors for
various Equipments
Furnishing
Ambulance, stretchers etc
Deliverable 4 – staffing and marketing
Recruitment of specialists, administrative staff,
supporting staff etc.
Advertising through newspapers and local
television channels
Deliverable 5- Analysis
Analyzing at each step that the project is running
Summary budget
Cost of Project Total (in Rs.)
Land cost@ 990 per sq. feet 0.70 crores
Construction cost 1.20 crores
Machinery & equipment 1.96 crores
Furnishing 0.90 crores
Vehicles 0.22 crores
Contingencies – 5 % construction cost 0.06 crores
Funding operating losses 0.50 crores
Recruitment 0.02 crores
Advertising 0.05 crores
Total estimated project Cost 5.61 crores
Cost Break down as per different major
activities or materials involved
Material / activity involved Cost (in Rs.)
LAND @ Rs.990 / square feet 7000000
Construction:
Contract to a regional contractor (raw
material, labour etc.)
3200000
Machinery & equipment
25 Hospital bed 250000
25 Bench 2500
5 Cabinet 30000
2 Conference table 25000
2 Emergency trolley 1000000
5 Executive chair 180000
30 stool 45000
2Waste paper tub 700
5 Oxygen set 5000
2 Binocular microscope 33000
1 Glucose analyzer 32000
2Weighing scale 9800
1Water distiller 120000
5 Surgeons stool 5000
2 ICU bed 150000
2 ECG Monitor 740000
2 Syringe pump 15000
3 ventilator 1200000
ICU instruments 1000000
Furnishing
30 Fan 36000
1 Air conditioner 22000
2 LED 8000
Wooden furniture (table, sofa, chair etc.) 150000
Vehicles
2 Ambulance 1500000
Recruitment
Expense on advertising for recruitment + per
head interview scheduling cost
2000000
Advertisement
Newspaper n(half page inTOI) 1212750
Hoarding ( GT road) 336000
 Cash INFlow
• Expected patients per day- 10
• Average charges-
Appointment fee- 100 Rs
Special appointment- 300 Rs
Sehat Hospital Project Proposal
Summary Milestones
Milestone Description
Month
s
Start Dates
Phase 1 –
Construction
Confirm the needs and project plan 1 25th July 17, 2014
Acquisition of land, carry out site
development.
2 25th August 2014
Obtain necessary statutory approvals. 2 25th October 2014
Prepare Master Plan and building
construction plans.
8
25th November
2014
Phase 2 –
Equipment
Equipment 2 25th June 2015
Furnishing 1 25th July 2015
Phase 3 – Staffing
and Marketing
Recruitment andTraining. 2 25th July 2015
Gantt chart of the Project
 WBS For Construction of Hospitals
1. Confirm the needs and project plan
 Confirm the needs for the service of the hospital.
 Confirm the market size, quality of services and
the capacity to serve.
 Prepare cost estimates and check with the
estimated budget.
 Prepare a preliminary schedule.
 Verify the cash flow and the project feasibility
assumption.
2. Acquisition of land, carry out site development.
 Evaluate available sites and select the site.
 Negotiate the land acquisitions with the suppliers
and purchase of the land.
 Soil testing and land classifications.
 Architectural drawings.
 Approvals and permit.
 Site development.
▪ Arrange water.
▪ Arrange Electricity.
▪ Construct boundary walls and fence.
3. Obtain necessary statutory approvals.
 Receive approvals for construction of the plan.
 Receive approvals from the board of medical
sciences.
 Receive Electricity supply approvals
 Receive approvals from the water supply
authority
 Prepare Master Plan and building construction plans.
 Select and appoint architect.
▪ Prepare overall Floor-wise layout plan.
▪ Construction details for lintels, staircase, walls
windows and doors.
▪ Colour schemes.
▪ Specification for flooring, fittings and fixtures.
▪ Prepare electrical cables layouts
▪ Prepare fire escape and sprinkler layout plans.
▪ Prepare air conditioning scheme and ducting layouts.
 Carryout Construction activities at the site.
▪ Select the prime contractor.
▪ OP Block
▪ Clinical Block
▪ Clinical lab block
▪ ICU block
▪ General Ward (Male)
▪ General Ward (Female)
▪ Admin Block
▪ Doctors Block
 Equipment and Furnishing
 Equipment
▪ Vendor Quotations
▪ Contracting with vendors
▪ Medicals contracting
 Furnishing
▪ Prepare the master plan for interiors decoration.
▪ Install Reception
▪ Install Room Furniture. – Beds, saline etc.
▪ Install ICU’s
▪ Install Doctors room and others.
 Recruitment and
Marketing
 Recruitment and
Training.
▪ Doctors
▪ Nurses
▪ Clerks
▪ Accountants
▪ Human Resources
▪ Drivers
 Marketing
▪ Print media
▪ Pamphlets
▪ News papers
▪ Outdoor
advertisements
▪ Hoardings
 Assumptions Risks :
 The staff may not be professional enough to handle
the equipment with care.
 Delay in getting the necessary approval for
construction of the hospital.
 The necessary resources may not be delivered on
time.
 Time constraint while recruitment and selection
of staff.
 Mismatch between demand and supply
 The loan sanction might get delayed from the
bank.
 Prices of raw materials , interest rates might
increase in case of inflation
 Political changes.
 Constraints
 Competition from other local private health
centers.
 Government owned hospitals are cheaper
 Doctors might charge high fees.

More Related Content

What's hot

Hospital Project by Vasundhara Trust
Hospital Project by Vasundhara TrustHospital Project by Vasundhara Trust
Hospital Project by Vasundhara TrustOptim Associates LLP
 
Apollo Presentation
Apollo PresentationApollo Presentation
Apollo Presentationmedwin
 
Apollo Hospital case study
Apollo Hospital case studyApollo Hospital case study
Apollo Hospital case studyPulkit Yadav
 
Amity multi-speciality hospital (a future plan)
Amity multi-speciality hospital (a future plan)Amity multi-speciality hospital (a future plan)
Amity multi-speciality hospital (a future plan)Vipin Kumar
 
Apollo Hospitals
Apollo HospitalsApollo Hospitals
Apollo HospitalsShray Jali
 
New Hospital Presentation
New Hospital PresentationNew Hospital Presentation
New Hospital PresentationTina Gilson
 
Branding for Aster Medcity- A Branding Case
Branding for Aster Medcity- A Branding CaseBranding for Aster Medcity- A Branding Case
Branding for Aster Medcity- A Branding CaseAbraham Isaac
 
Literature study & analysis on hospital design
Literature study & analysis on hospital designLiterature study & analysis on hospital design
Literature study & analysis on hospital designBee Key Verma
 
FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY Prince Pathania
 
Hospital project report
Hospital project reportHospital project report
Hospital project reportjssclinic
 
Kohinoor Hospital the Sustainable Hospital
Kohinoor Hospital the Sustainable HospitalKohinoor Hospital the Sustainable Hospital
Kohinoor Hospital the Sustainable HospitalRajat Katarne
 
Feasibility study report.pptx
Feasibility study report.pptxFeasibility study report.pptx
Feasibility study report.pptxTiaraManani
 

What's hot (20)

Hospital Project by Vasundhara Trust
Hospital Project by Vasundhara TrustHospital Project by Vasundhara Trust
Hospital Project by Vasundhara Trust
 
Apollo Presentation
Apollo PresentationApollo Presentation
Apollo Presentation
 
Apollo Hospital case study
Apollo Hospital case studyApollo Hospital case study
Apollo Hospital case study
 
Medanta the Medicity
Medanta the MedicityMedanta the Medicity
Medanta the Medicity
 
Amity multi-speciality hospital (a future plan)
Amity multi-speciality hospital (a future plan)Amity multi-speciality hospital (a future plan)
Amity multi-speciality hospital (a future plan)
 
Apollo Hospitals
Apollo HospitalsApollo Hospitals
Apollo Hospitals
 
Apollo Hospitals
Apollo HospitalsApollo Hospitals
Apollo Hospitals
 
New Hospital Presentation
New Hospital PresentationNew Hospital Presentation
New Hospital Presentation
 
Branding for Aster Medcity- A Branding Case
Branding for Aster Medcity- A Branding CaseBranding for Aster Medcity- A Branding Case
Branding for Aster Medcity- A Branding Case
 
Hospital Planning
Hospital PlanningHospital Planning
Hospital Planning
 
HOSPITAL PLANNING
HOSPITAL PLANNINGHOSPITAL PLANNING
HOSPITAL PLANNING
 
Literature study & analysis on hospital design
Literature study & analysis on hospital designLiterature study & analysis on hospital design
Literature study & analysis on hospital design
 
FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY
 
Hospital project report
Hospital project reportHospital project report
Hospital project report
 
Kohinoor Hospital the Sustainable Hospital
Kohinoor Hospital the Sustainable HospitalKohinoor Hospital the Sustainable Hospital
Kohinoor Hospital the Sustainable Hospital
 
Hospital introduction
Hospital introductionHospital introduction
Hospital introduction
 
Feasibility study report.pptx
Feasibility study report.pptxFeasibility study report.pptx
Feasibility study report.pptx
 
Hospital Planning
Hospital PlanningHospital Planning
Hospital Planning
 
IPD Hospital
IPD Hospital IPD Hospital
IPD Hospital
 
Planning and Designing of a Hospital
Planning and Designing of a HospitalPlanning and Designing of a Hospital
Planning and Designing of a Hospital
 

Similar to Sehat hospital final

Introduction to Hospital consultancy 2016
Introduction to Hospital consultancy 2016Introduction to Hospital consultancy 2016
Introduction to Hospital consultancy 2016Redsun Communication
 
project management hospital construction.docx
project management hospital construction.docxproject management hospital construction.docx
project management hospital construction.docxmohamedwesam3544
 
PMS CASE STUDY - 02 .....1-2.pptx
PMS CASE STUDY - 02 .....1-2.pptxPMS CASE STUDY - 02 .....1-2.pptx
PMS CASE STUDY - 02 .....1-2.pptxShashidharaTV2
 
Final mpoc presentation roadshow (23 nov2012)
Final mpoc presentation roadshow (23 nov2012)Final mpoc presentation roadshow (23 nov2012)
Final mpoc presentation roadshow (23 nov2012)Ted Herbosa
 
Pre Construction Stages Work(procurement and tendering) Binod Patro
Pre Construction Stages Work(procurement and tendering)  Binod PatroPre Construction Stages Work(procurement and tendering)  Binod Patro
Pre Construction Stages Work(procurement and tendering) Binod PatroBBinodKumarPatro
 
Challenges faced during the development of new high demand public hospitals w...
Challenges faced during the development of new high demand public hospitals w...Challenges faced during the development of new high demand public hospitals w...
Challenges faced during the development of new high demand public hospitals w...meiroc
 
Challenges faced during the development of new high demand public hospitals w...
Challenges faced during the development of new high demand public hospitals w...Challenges faced during the development of new high demand public hospitals w...
Challenges faced during the development of new high demand public hospitals w...meiroc
 
A Guide to Grant Writing
A Guide to Grant Writing  A Guide to Grant Writing
A Guide to Grant Writing ticoscu
 
How to start a Old Hospital with New ideas
How to start a Old Hospital with New ideasHow to start a Old Hospital with New ideas
How to start a Old Hospital with New ideasVISHESH VYAS
 
case study.pdf
case study.pdfcase study.pdf
case study.pdfHongLc19
 
AGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEME
AGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEMEAGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEME
AGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEMEDiraviam Jayaraj
 
hospitalplanning-130528040750-phpapp02 (2).pptx
hospitalplanning-130528040750-phpapp02 (2).pptxhospitalplanning-130528040750-phpapp02 (2).pptx
hospitalplanning-130528040750-phpapp02 (2).pptxShashidharaTV2
 
3761 db7415 -_manideep_yellanki_assesment_2_55705_10041974
3761 db7415 -_manideep_yellanki_assesment_2_55705_100419743761 db7415 -_manideep_yellanki_assesment_2_55705_10041974
3761 db7415 -_manideep_yellanki_assesment_2_55705_10041974Manideep Yellanki
 
00. Presentation QS0005.pptx
00. Presentation QS0005.pptx00. Presentation QS0005.pptx
00. Presentation QS0005.pptxBimsaraRotaract
 
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docxRunning head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docxtodd581
 
Improve patient satisfaction 2.docx
Improve patient satisfaction 2.docxImprove patient satisfaction 2.docx
Improve patient satisfaction 2.docx4934bk
 

Similar to Sehat hospital final (20)

Introduction to Hospital consultancy 2016
Introduction to Hospital consultancy 2016Introduction to Hospital consultancy 2016
Introduction to Hospital consultancy 2016
 
HOSPITAL PLANNING .ppt
HOSPITAL PLANNING .pptHOSPITAL PLANNING .ppt
HOSPITAL PLANNING .ppt
 
project management hospital construction.docx
project management hospital construction.docxproject management hospital construction.docx
project management hospital construction.docx
 
PMS CASE STUDY - 02 .....1-2.pptx
PMS CASE STUDY - 02 .....1-2.pptxPMS CASE STUDY - 02 .....1-2.pptx
PMS CASE STUDY - 02 .....1-2.pptx
 
Final mpoc presentation roadshow (23 nov2012)
Final mpoc presentation roadshow (23 nov2012)Final mpoc presentation roadshow (23 nov2012)
Final mpoc presentation roadshow (23 nov2012)
 
Mata ppt
Mata pptMata ppt
Mata ppt
 
Pre Construction Stages Work(procurement and tendering) Binod Patro
Pre Construction Stages Work(procurement and tendering)  Binod PatroPre Construction Stages Work(procurement and tendering)  Binod Patro
Pre Construction Stages Work(procurement and tendering) Binod Patro
 
Challenges faced during the development of new high demand public hospitals w...
Challenges faced during the development of new high demand public hospitals w...Challenges faced during the development of new high demand public hospitals w...
Challenges faced during the development of new high demand public hospitals w...
 
Challenges faced during the development of new high demand public hospitals w...
Challenges faced during the development of new high demand public hospitals w...Challenges faced during the development of new high demand public hospitals w...
Challenges faced during the development of new high demand public hospitals w...
 
site selections
site selectionssite selections
site selections
 
A Guide to Grant Writing
A Guide to Grant Writing  A Guide to Grant Writing
A Guide to Grant Writing
 
How to Write a Project Proposal
How to Write a Project ProposalHow to Write a Project Proposal
How to Write a Project Proposal
 
How to start a Old Hospital with New ideas
How to start a Old Hospital with New ideasHow to start a Old Hospital with New ideas
How to start a Old Hospital with New ideas
 
case study.pdf
case study.pdfcase study.pdf
case study.pdf
 
AGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEME
AGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEMEAGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEME
AGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEME
 
hospitalplanning-130528040750-phpapp02 (2).pptx
hospitalplanning-130528040750-phpapp02 (2).pptxhospitalplanning-130528040750-phpapp02 (2).pptx
hospitalplanning-130528040750-phpapp02 (2).pptx
 
3761 db7415 -_manideep_yellanki_assesment_2_55705_10041974
3761 db7415 -_manideep_yellanki_assesment_2_55705_100419743761 db7415 -_manideep_yellanki_assesment_2_55705_10041974
3761 db7415 -_manideep_yellanki_assesment_2_55705_10041974
 
00. Presentation QS0005.pptx
00. Presentation QS0005.pptx00. Presentation QS0005.pptx
00. Presentation QS0005.pptx
 
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docxRunning head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
 
Improve patient satisfaction 2.docx
Improve patient satisfaction 2.docxImprove patient satisfaction 2.docx
Improve patient satisfaction 2.docx
 

Recently uploaded

Don't Miss Out: Strategies for Making the Most of the Ethena DigitalOpportunity
Don't Miss Out: Strategies for Making the Most of the Ethena DigitalOpportunityDon't Miss Out: Strategies for Making the Most of the Ethena DigitalOpportunity
Don't Miss Out: Strategies for Making the Most of the Ethena DigitalOpportunityApp Ethena
 
Testing and Development Challenges for Complex Cyber-Physical Systems: Insigh...
Testing and Development Challenges for Complex Cyber-Physical Systems: Insigh...Testing and Development Challenges for Complex Cyber-Physical Systems: Insigh...
Testing and Development Challenges for Complex Cyber-Physical Systems: Insigh...Sebastiano Panichella
 
Scootsy Overview Deck - Pan City Delivery
Scootsy Overview Deck - Pan City DeliveryScootsy Overview Deck - Pan City Delivery
Scootsy Overview Deck - Pan City Deliveryrishi338139
 
cse-csp batch4 review-1.1.pptx cyber security
cse-csp batch4 review-1.1.pptx cyber securitycse-csp batch4 review-1.1.pptx cyber security
cse-csp batch4 review-1.1.pptx cyber securitysandeepnani2260
 
Understanding Cyberbullying Laws in Canada's Criminal Code
Understanding Cyberbullying Laws in Canada's Criminal CodeUnderstanding Cyberbullying Laws in Canada's Criminal Code
Understanding Cyberbullying Laws in Canada's Criminal CodeBrian Markle
 
Sunlight Spectacle 2024 Practical Action Launch Event 2024-04-08
Sunlight Spectacle 2024 Practical Action Launch Event 2024-04-08Sunlight Spectacle 2024 Practical Action Launch Event 2024-04-08
Sunlight Spectacle 2024 Practical Action Launch Event 2024-04-08LloydHelferty
 
GESCO SE Press and Analyst Conference on Financial Results 2024
GESCO SE Press and Analyst Conference on Financial Results 2024GESCO SE Press and Analyst Conference on Financial Results 2024
GESCO SE Press and Analyst Conference on Financial Results 2024GESCO SE
 
05.02 MMC - Assignment 4 - Image Attribution Lovepreet.pptx
05.02 MMC - Assignment 4 - Image Attribution Lovepreet.pptx05.02 MMC - Assignment 4 - Image Attribution Lovepreet.pptx
05.02 MMC - Assignment 4 - Image Attribution Lovepreet.pptxerickamwana1
 
Understanding Post Production changes (PPC) in Clinical Data Management (CDM)...
Understanding Post Production changes (PPC) in Clinical Data Management (CDM)...Understanding Post Production changes (PPC) in Clinical Data Management (CDM)...
Understanding Post Production changes (PPC) in Clinical Data Management (CDM)...soumyapottola
 
Testing with Fewer Resources: Toward Adaptive Approaches for Cost-effective ...
Testing with Fewer Resources:  Toward Adaptive Approaches for Cost-effective ...Testing with Fewer Resources:  Toward Adaptive Approaches for Cost-effective ...
Testing with Fewer Resources: Toward Adaptive Approaches for Cost-effective ...Sebastiano Panichella
 
Basic overview of nerve conduction studies
Basic overview of nerve conduction studiesBasic overview of nerve conduction studies
Basic overview of nerve conduction studiesDrAbdulAli1
 

Recently uploaded (11)

Don't Miss Out: Strategies for Making the Most of the Ethena DigitalOpportunity
Don't Miss Out: Strategies for Making the Most of the Ethena DigitalOpportunityDon't Miss Out: Strategies for Making the Most of the Ethena DigitalOpportunity
Don't Miss Out: Strategies for Making the Most of the Ethena DigitalOpportunity
 
Testing and Development Challenges for Complex Cyber-Physical Systems: Insigh...
Testing and Development Challenges for Complex Cyber-Physical Systems: Insigh...Testing and Development Challenges for Complex Cyber-Physical Systems: Insigh...
Testing and Development Challenges for Complex Cyber-Physical Systems: Insigh...
 
Scootsy Overview Deck - Pan City Delivery
Scootsy Overview Deck - Pan City DeliveryScootsy Overview Deck - Pan City Delivery
Scootsy Overview Deck - Pan City Delivery
 
cse-csp batch4 review-1.1.pptx cyber security
cse-csp batch4 review-1.1.pptx cyber securitycse-csp batch4 review-1.1.pptx cyber security
cse-csp batch4 review-1.1.pptx cyber security
 
Understanding Cyberbullying Laws in Canada's Criminal Code
Understanding Cyberbullying Laws in Canada's Criminal CodeUnderstanding Cyberbullying Laws in Canada's Criminal Code
Understanding Cyberbullying Laws in Canada's Criminal Code
 
Sunlight Spectacle 2024 Practical Action Launch Event 2024-04-08
Sunlight Spectacle 2024 Practical Action Launch Event 2024-04-08Sunlight Spectacle 2024 Practical Action Launch Event 2024-04-08
Sunlight Spectacle 2024 Practical Action Launch Event 2024-04-08
 
GESCO SE Press and Analyst Conference on Financial Results 2024
GESCO SE Press and Analyst Conference on Financial Results 2024GESCO SE Press and Analyst Conference on Financial Results 2024
GESCO SE Press and Analyst Conference on Financial Results 2024
 
05.02 MMC - Assignment 4 - Image Attribution Lovepreet.pptx
05.02 MMC - Assignment 4 - Image Attribution Lovepreet.pptx05.02 MMC - Assignment 4 - Image Attribution Lovepreet.pptx
05.02 MMC - Assignment 4 - Image Attribution Lovepreet.pptx
 
Understanding Post Production changes (PPC) in Clinical Data Management (CDM)...
Understanding Post Production changes (PPC) in Clinical Data Management (CDM)...Understanding Post Production changes (PPC) in Clinical Data Management (CDM)...
Understanding Post Production changes (PPC) in Clinical Data Management (CDM)...
 
Testing with Fewer Resources: Toward Adaptive Approaches for Cost-effective ...
Testing with Fewer Resources:  Toward Adaptive Approaches for Cost-effective ...Testing with Fewer Resources:  Toward Adaptive Approaches for Cost-effective ...
Testing with Fewer Resources: Toward Adaptive Approaches for Cost-effective ...
 
Basic overview of nerve conduction studies
Basic overview of nerve conduction studiesBasic overview of nerve conduction studies
Basic overview of nerve conduction studies
 

Sehat hospital final

  • 1. By Group 7 – ASHISH JHA - 20 ISHANI DAS - 37 POOJATIWARI - 53 RAMYA RAVIKUMAR - 61 SHIVAM NIGAM - 72 ABHISHEKTIWARI - 84 VINAY PILLAI - 86 Hospital – SEHAT Customer name – Dr Siya Bharadwaj Project Co-ordinator - Ms.Punya Awasthi
  • 2.  Ms. Siya Bharadwaj, a MBBS from AIIMS has come back to her home town Kanpur and wants to start a hospital at a small level of 20 bed capacity.  For this she has come to a professional Ms.Punya Awasthi, who has an experience in forming project proposal and helping in implementing it.  She has an aim to help people by taking care of health issue and a commercial aim to get at least 15% ROI.
  • 3.  Project Scope Statement : Design, construct and equip a local hospital and securing necessary funds for constructions of a 20 bed capacity general hospital in the city of Kanpur. The project aims at providing an ROI of 15% and is to be started by 25th July 2014 by completing the project without exceeding the budget of 5.61 crores.
  • 4.  Project Objectives: • To complete the project within the time boundary i.e. 30th September 2015. • To ensure that the project is completed within the given budget. • To earn adequate return on investment. • To ensure that the supplies are timely.
  • 5.  Project sponsor : Bharadwaj and Sons 40% Bank 60%
  • 6.  Customers: The customer or we can say beneficiaries of the project are the people in the region who don’t get good and timely medical facilities.This project will serve the men, women and children by providing the best health care facilities.
  • 7.  Summary of EconomicViability: • Phase 1: This phase involves running of a hospital for patients in the region. It is proposed to establish this 24*7 facility in a 5,000 square feet space in the region.The unit will have separate facilities for male, female and children.The estimated land cost is INR 70 lakh which is expected to be funded by Bhardwaj & sons and by bank loan.
  • 8. • Phase 2: This phase involves the establishment of a 20 bed hospital in about 5000 square feet of land. The hospital will have a built up area of 5,000 square feet. • Phase 3: This involves the recruitment and marketing. • The estimated project cost is 5.61 crores. • This whole project is a health care facility so focus is not on profit gain. But since the sponsors are involved so this project aims at 15% ROI.
  • 9.  Preliminary Stakeholders Analysis • Project Sponsor: Kashinath Bharadwaj, Executive Vice President, Bhardawaj & sons • Bank: HDFC Bank • Project Manager: Ms. Punya Awasthi • Key person of project: Ms. Siya Bharadwaj
  • 11. Deliverables Description Deliverable 1- System Design Study the hospital’s requirement and needs. Getting statutory approvals. Deliverable 2 - Construction Procurement of land Legal Approval Hiring an Architect for designing Hire a contractor for construction Deliverable 3 – Equipment Quotations and Contracting fromVendors for various Equipments Furnishing Ambulance, stretchers etc Deliverable 4 – staffing and marketing Recruitment of specialists, administrative staff, supporting staff etc. Advertising through newspapers and local television channels Deliverable 5- Analysis Analyzing at each step that the project is running
  • 13. Cost of Project Total (in Rs.) Land cost@ 990 per sq. feet 0.70 crores Construction cost 1.20 crores Machinery & equipment 1.96 crores Furnishing 0.90 crores Vehicles 0.22 crores Contingencies – 5 % construction cost 0.06 crores Funding operating losses 0.50 crores Recruitment 0.02 crores Advertising 0.05 crores Total estimated project Cost 5.61 crores
  • 14. Cost Break down as per different major activities or materials involved
  • 15. Material / activity involved Cost (in Rs.) LAND @ Rs.990 / square feet 7000000 Construction: Contract to a regional contractor (raw material, labour etc.) 3200000 Machinery & equipment 25 Hospital bed 250000 25 Bench 2500 5 Cabinet 30000 2 Conference table 25000
  • 16. 2 Emergency trolley 1000000 5 Executive chair 180000 30 stool 45000 2Waste paper tub 700 5 Oxygen set 5000 2 Binocular microscope 33000 1 Glucose analyzer 32000 2Weighing scale 9800 1Water distiller 120000 5 Surgeons stool 5000 2 ICU bed 150000 2 ECG Monitor 740000 2 Syringe pump 15000 3 ventilator 1200000
  • 17. ICU instruments 1000000 Furnishing 30 Fan 36000 1 Air conditioner 22000 2 LED 8000 Wooden furniture (table, sofa, chair etc.) 150000 Vehicles 2 Ambulance 1500000 Recruitment Expense on advertising for recruitment + per head interview scheduling cost 2000000 Advertisement Newspaper n(half page inTOI) 1212750 Hoarding ( GT road) 336000
  • 18.  Cash INFlow • Expected patients per day- 10 • Average charges- Appointment fee- 100 Rs Special appointment- 300 Rs Sehat Hospital Project Proposal
  • 20. Milestone Description Month s Start Dates Phase 1 – Construction Confirm the needs and project plan 1 25th July 17, 2014 Acquisition of land, carry out site development. 2 25th August 2014 Obtain necessary statutory approvals. 2 25th October 2014 Prepare Master Plan and building construction plans. 8 25th November 2014 Phase 2 – Equipment Equipment 2 25th June 2015 Furnishing 1 25th July 2015 Phase 3 – Staffing and Marketing Recruitment andTraining. 2 25th July 2015
  • 21. Gantt chart of the Project
  • 22.  WBS For Construction of Hospitals 1. Confirm the needs and project plan  Confirm the needs for the service of the hospital.  Confirm the market size, quality of services and the capacity to serve.  Prepare cost estimates and check with the estimated budget.  Prepare a preliminary schedule.  Verify the cash flow and the project feasibility assumption.
  • 23. 2. Acquisition of land, carry out site development.  Evaluate available sites and select the site.  Negotiate the land acquisitions with the suppliers and purchase of the land.  Soil testing and land classifications.  Architectural drawings.  Approvals and permit.  Site development. ▪ Arrange water. ▪ Arrange Electricity. ▪ Construct boundary walls and fence.
  • 24. 3. Obtain necessary statutory approvals.  Receive approvals for construction of the plan.  Receive approvals from the board of medical sciences.  Receive Electricity supply approvals  Receive approvals from the water supply authority
  • 25.  Prepare Master Plan and building construction plans.  Select and appoint architect. ▪ Prepare overall Floor-wise layout plan. ▪ Construction details for lintels, staircase, walls windows and doors. ▪ Colour schemes. ▪ Specification for flooring, fittings and fixtures. ▪ Prepare electrical cables layouts ▪ Prepare fire escape and sprinkler layout plans. ▪ Prepare air conditioning scheme and ducting layouts.
  • 26.  Carryout Construction activities at the site. ▪ Select the prime contractor. ▪ OP Block ▪ Clinical Block ▪ Clinical lab block ▪ ICU block ▪ General Ward (Male) ▪ General Ward (Female) ▪ Admin Block ▪ Doctors Block
  • 27.  Equipment and Furnishing  Equipment ▪ Vendor Quotations ▪ Contracting with vendors ▪ Medicals contracting  Furnishing ▪ Prepare the master plan for interiors decoration. ▪ Install Reception ▪ Install Room Furniture. – Beds, saline etc. ▪ Install ICU’s ▪ Install Doctors room and others.
  • 28.  Recruitment and Marketing  Recruitment and Training. ▪ Doctors ▪ Nurses ▪ Clerks ▪ Accountants ▪ Human Resources ▪ Drivers  Marketing ▪ Print media ▪ Pamphlets ▪ News papers ▪ Outdoor advertisements ▪ Hoardings
  • 29.  Assumptions Risks :  The staff may not be professional enough to handle the equipment with care.  Delay in getting the necessary approval for construction of the hospital.  The necessary resources may not be delivered on time.
  • 30.  Time constraint while recruitment and selection of staff.  Mismatch between demand and supply  The loan sanction might get delayed from the bank.  Prices of raw materials , interest rates might increase in case of inflation  Political changes.
  • 31.  Constraints  Competition from other local private health centers.  Government owned hospitals are cheaper  Doctors might charge high fees.