Priprep2 xml
Upcoming SlideShare
Loading in...5
×
 

Priprep2 xml

on

  • 278 views

Integrated IT Design for Upstream Oil and Gas Exploration

Integrated IT Design for Upstream Oil and Gas Exploration

Statistics

Views

Total Views
278
Views on SlideShare
278
Embed Views
0

Actions

Likes
0
Downloads
7
Comments
0

0 Embeds 0

No embeds

Accessibility

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Priprep2 xml Priprep2 xml Presentation Transcript

  • Petroleum Resource Integration Preparation Stage in Bidang Perencanaan BPMIGAS
  • Orientation (Vision – Mission)  To supervise and control the PSC’s contracts’ implementation through partnership in order to ensure effectiveness and efficiency of upstream oil & gas business activities for the greatest welfare of the Nation  Be a proactive and trustworthy partner in optimizing the benefit of the upstream oil & gas industry for all stakeholders while becoming one of the nation’s engine in mobilizing different economic and industrial activities
  • Prudent Character Professional Knowledge and Technology Know what best to do Responsive Communicative, online connectivity & Aware and respond to the direct notification situation Unity Centralized and integrated informationShare and incorporate each other Decisive Analytic decision, planning & reporting Authorize and responsible Best practice standard of procedures Ethics Know the way how to do In house management & Nation focused administration Internal resources oriented Trustworthy Accurate information, calculation, andReliable to be taken into account estimation
  • SWOT BPMIGAS STRENGTH – Orientation and Prudent Character WEAKNESS – Standard level of technology implementation – Offline connectivity & communication– Separated & individual application system – Non analytic decision, planning, and reporting – Incomprehensive SOP (PTPTK)– Outsourced management & administration – Unreliable information calculation and estimation OPPORTUNITY – Contractor’s advanced technology – Best practice standard in oil & gas international community – Unexplored oil & gas resources THREAD – National production declining – Uncertainty of sustainable energy availability
  • Future condition phase 1 - Internal - “1st prudent realization” - (Petroleum Resource Integration - PRI)  Advanced knowledge & technology Professional – Internal dedicated GIS server for spatial and textual data management  Online communication and connectivity Responsive – Internal system for KKKS data loader to BPMIGAS server  Centralized and integrated information system Unity – Internal master textual database system – Internal master spatial database system  Analytic decision, planning & reporting Decisive – Internal Project Portfolio Management System  Best practice business standard and procedure Ethics – Designed WP&B, AFE, POD Procedures and Tracking implementation – Designed PTPTK for Common GIS coordinate system, data structure, and symbology  In house management & administration Nation Focused– Local administration portal for data, information, and knowledge database system of textual and spatial data  Secure and reliable textual - spatial information, calculation, and estimation Trustworthy – Internal Project Portfolio Management System –
  • How to Transfer Data?  Using text-column format – SPS, LIS, LAS, etc.  Using Excel format  Using XML format – MathML, GeoML, WitsML, etc.  Using Web Form – BCA/Mandiri/Niaga Internet Banking  Using GIS portal – WMS, USGS, Google Maps
  • XML Introduction
  • WITSML(Wellsite Information Transfer Standar Markup Language)
  • XML SamplesXML Textual View Form View Table View
  • Database Terminology  Table  Where the data stored  Query  Where the data calculated  Form  Where to input data  Report  Where the data published  *Macro   To automate the process
  • App Build Procedure Invention  Concept  User (The Main Idea) Organization  Business Process  User (The Procedure) Normalization  Data Structure  User / IT (The Storage) Programming  Application  IT (The Process) Configuration  Infrastructure  IT (The Tools)
  • BPMIGAS Data Group & Status  00-Basin60/86………….. available  01-WK / KKS…………… available  02-Komitmen…………… available  03-WPNB……………….. unsynchronized  04-AFE………………….. unsynchronized  05-Study………………… unavailable  06-Survey………………. unavailable  07-EKS Drilling………… unavailable  08-P&L………………….. to be completed  09-POD…………………. unavailable  10-Field…………………. unavailable
  • 1ST PRUDENT  PRI Realization DOCUMENT CAPTURE ANALYSTICAL PROCESS PLANNING RECOMENDATION Basin User Monitor Working Panel COMMIT MENT EKS EPT WP&B SIBEP LETTER AFE PORTF DSS DBEP SIE OLIO PRI Prospek GIS GIS LEad Data K3S etc…… Pengem PERFOR bangan MANCE Katalog Lapangan Data EKS Project etc…… Progress etc…… etc…… (DATA WAREHOUSE) (DATA ANALYSIS) (EXPERIENCES)
  • Future condition phase 2 - External - “2nd prudent realization” -(Petroleum Resource Management - PRM)  Advanced knowledge & technology Professional – BPMIGAS – KKKS connectivity with GIS to GIS communication technology  Online communication and connectivity Responsive – BPMIGAS - KKKS online connectivity for data loading, capturing, query, retrieving and notification  Centralized and integrated information system Unity – BPMIGAS Regional E&P base map of spatial textual database server synchronized with KKKS local E&P thematic map of spatial textual database server  Analytic decision, planning & reporting Decisive – Cross BPMIGAS – KKKS Project Portfolio Management System  Best practice business standard and procedure Ethics – Improved WP&B, AFE, POD Procedures PTPTK and Tracking – Improved GIS management (PTPTK) for BPMIGAS - KKKS  In house management & administration Nation Focused– Centralized administration portal for KKKS data, information, and knowledge database system of textual and spatial data in BPMIGAS  Secure and reliable textual - spatial information, calculation, and estimation Trustworthy – Cross BPMIGAS – KKKS Project Portfolio Management System
  • 2ND PRUDENT  PRI Connection DSS SIBEP SIE GIS BPMIGAS GIS KKKS CONNECTORPORTFO LIO K3S CONNECTIVITY OTHERSPERFORMANCE (Inter Portal Connection)
  • BPMIGAS – KKKS Management in order to maintain nationaloil & gas production for sustainable energy supplyof 1.2 MMBOPD in 2015 BPMIGAS Office KKKS Office GIS Interface “..according to our “..we propose drilling regional base map you for the third year of shoul first d run 3D survey contract situated surrounding the location here..” to ensure the risk of drilling…” • prospect ranking … ! • exploration target … ! • cum production rate … ! • WP&B, AFE, POD…!
  • NATIONAL GIS CONCEPT PLAN(Cloud Computing) TRANS PORTASI PER TAMBANGAN PER TANAHAN BAKO KKKS SURTANAL BPMIGAS KKKS KEHUTANAN KKKS KESEHATAN KKKS