• Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
226
On Slideshare
0
From Embeds
0
Number of Embeds
2

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Design WorkA collection of projects I have designed.
  • 2. Dam Spillway System
  • 3. CAD by CAD Technician
  • 4. The spillway system was built…
  • 5. We later received the following letter from the dam operator
  • 6. “We had a fairly significant localized rain event…” “…the most significant since [hurricane] Ernesto in 2006“…the spillway worked perfectly and exactly as it was designed to”
  • 7. Stream Daylighting
  • 8. DuringConstruction.
  • 9. Bridge Design
  • 10. CAD by CAD Technician
  • 11. The bridge during construction.
  • 12. Pier Layout
  • 13. That pier “made the papers”…and was ultimately approved
  • 14. “The Commission recommends the council approve the proposed pier.” “…the motion passed unanimously, 5-0.”
  • 15. Kayak Launch-Area for a Subdivision
  • 16. Marina Layout Design
  • 17. Wetland Design Concept Plan
  • 18. Raised Foundation Design