Risk Assessment

277 views
239 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
277
On SlideShare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Risk Assessment

  1. 1. RISK How to reduce or What to do if Level of Risk prevent the risk danger occursBags in the way Ensure all bags are Move them out of the Medium left at the back of the way to a safer place hallSlippery Floor Check the flooring Wipe it up as soon as High before anyone has possible arrivedWires in the way Keep wires tied up Move them out of the Medium way and tied upProjection doesn’t Check the projector Have aback projector, Lowwork before the assembly keep a technician on handAssemblies have Have contact with Re schedule Highbeen cancelled head of years assembly dates or send out PowerPointLate arrivals Ensure all students Have someone at the High are brought up by a front to supervise late teacher arrivals

×