• Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
303
On Slideshare
0
From Embeds
0
Number of Embeds
1

Actions

Shares
Downloads
2
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. SOME PICTURES OF PROJECTS YASHAR POURANG INVOLVED
  • 2. Tenandra Irrigation Scheme Macquarie Valley, NSW June 2012-Present
  • 3. Tenandra Irrigation Scheme - Macquarie Valley, NSW Bulk earthworks, Cut and overcut
  • 4. Tenandra Irrigation Scheme - Macquarie Valley, NSW Bulk earthworks, Cut and overcut, adding water to get the optimum moisture
  • 5. Tenandra Irrigation Scheme - Macquarie Valley, NSW Trimming Batters, Nuclear Density meter and compaction test
  • 6. Tenandra Irrigation Scheme - Macquarie Valley, NSW Nuclear Density meter and compaction test Permeability tests
  • 7. Tenandra Irrigation Scheme - Macquarie Valley, NSW Concrete pipes laying & installing headwalls
  • 8. Tenandra Irrigation Scheme - Macquarie Valley, NSW Installing double barrel headwalls
  • 9. Tenandra Irrigation Scheme - Macquarie Valley, NSW Traffic control and Detour road to install 1800mm road crossing pipes
  • 10. Tanavob General Contractor (TGC) Earthworks, drainage, concreting and foundation 2008-2011
  • 11. Tanavob General Contractor (TGC) Bulk earthworks and excavation; totally: 170,000 m³
  • 12. Tanavob General Contractor (TGC) Drainage System to control and conduct underground water, before commencing construction of Foundation
  • 13. Tanavob General Contractor (TGC) Completed Drainage System; 2000 m²
  • 14. Tanavob General Contractor (TGC) Cleaning concrete and construction of Foundation (Reinforcement and Frame works)
  • 15. Tanavob General Contractor (TGC) Construction of Foundation (Reinforcement and Frame works) and commencing of concreting
  • 16. Tanavob General Contractor (TGC) Construction of Foundation , concreting
  • 17. Tanavob General Contractor (TGC) Construction of Foundation involving Bulk earthworks (170,000 m³), Drainage system, Reinforcement (600 ton) and Concreting (7000 m³) ; completed in 6 month
  • 18. Tanavob General Contractor (TGC) Roads and Pavement 2008-2011 Primary excavation and earthworks
  • 19. Tanavob General Contractor (TGC) Embankment, road bases and sub-bases, Side walk, pavements and drainage
  • 20. Tanavob General Contractor (TGC) Embankment, road bases and sub-bases, Side walk, pavements
  • 21. Tanavob General Contractor (TGC) Completion of project involves: Dual layer Asphalt & Spraying (17,000 m³) Earthworks, excavation and embankment (120,000 m³) Pavement and Sidewalks ( 4,000 m²)
  • 22. Tanavob General Contractor (TGC) Roads and Pavement Satellite pictures of the project (by Google Earth); before commencing the project and 6 month after
  • 23. Tanavob General Contractor (TGC) Roads and Pavement Satellite pictures of the project (by Google Earth); 6 month after commencing the project
  • 24. Tanavob General Contractor (TGC) Construction of a 2800 m² Car park
  • 25. Tanavob General Contractor (TGC) Concrete Structures and Landscaping
  • 26. Tanavob General Contractor (TGC) Setting out the foundation and center of columns Foundation and Columns , Embankments
  • 27. Tanavob General Contractor (TGC) Reinforcements of columns Concrete structure, landscaping and stone works
  • 28. Persian Gulf Oil Company Bulk earth work and Oil tank construction 2007-2008 Excavation
  • 29. Persian Gulf Oil Company Bulk earth work and Oil tank construction Embankment and leveling
  • 30. Persian Gulf Oil Company Bulk earth work and Oil tank construction Drainage and compaction
  • 31. Persian Gulf Oil Company Bulk earth work and Oil tank construction Welded above-ground oil tank construction
  • 32. Persian Gulf Oil Company Bulk earth work and Oil tank construction Satellite pictures of the project (by Google Earth) June 2007 ~ September 2008
  • 33. AAC Group 2004-2007 Construction of 52 piles , 24 meter depth each to increase bearing capacity of the soil
  • 34. AAC Group 2004-2007 Construction of two 16-floor & two 9-floor residential towers Forming of columns and floors
  • 35. AAC Group On-site concrete batching plant & tower cranes
  • 36. AAC Group Earthwork and excavation, early 2004 Satellite pictures of the project (by Google Earth) General site view, late 2006