Introduction to the
Construction Industry
Final project
Group name: Poh Weng Chuan, Lu Siau Vay
Student ID: 0319951, 0318567
Tutor: Puan Hasmanira Mokhtar
Project Title: FNB(food and beverage)
Contents
1. Introduction
2. Your suggestion and proposal
3. Introduction to the site
4. Site analysis and observation
5. The rationale and benefits of your project in to the client and the
surrounding community
6. Sketch plan of your proposal
7. Images of your idea
8. Site plan
9. Zoning of the plan layout
10. Area and its functions
11. Roles in the project
12. Materials used in construction (exterior & interior)
13. Costing
14. Information/form of the authority procedures
15. Conclusion (aim of the project)
INTRODUCTION
Outcomes:
1. To coordinate and develop an understanding of coherent
working relations and to improve the communication channels.
2. Ability to document their observations and understanding
from interview session and research resources as well as to
communicate their findings in a systematic and convincing
presentation and reports.
3. Explain and illustrate structures of organizations involved in
the construction industry from the design stage to final account
stage.
Task:
In a group work of 2 students, we need to find a specific land
within campus area to initiate a small construction project. The
size of the land shall not be more than 30m x 30m. We should
propose one project that serves one of the following purposes.
1. Recreation area
2. Study Enhancement Area
3. Rest area
4. Food and beverage (dining area)
5. Commercial area (exclude food and beverage)
Suggestion / proposal
Towards the site that we had chosen, my group member and I
did a lot of website and book references research. Throughout this
process we had suggested that the empty land next to the theater TV
studio is most suitable to develop a food and beverage area (dining
area).
We initially wanted to propose on a café shop, due the space
within the area, it’s more suitable to design a dining area. Our
proposal on the design is much like fine dining or classic restaurant
for the purpose for students and people within the campus can enjoy
the dining experience.
Dining area
INTRODUCTION TO THE SITE
Our 8m x 16m selected site is the empty open public spaces beside the
experimental theatre. Our chosen site is between Block B and Block C. Go left
after you walk out from library, then go straight. It’s on your right hand side
after you walk about 5 to 10 meters.
The selected site is a space that people passes by everyday so we decided
to construct a food and beverage area on this site because people can easily find
where our site locates.
Site analysis and observation
As me and my group partner did a site analysis before choosing it.
The result was quite satisfying, due to the spacious of the area, the wind
flow direction comes directly to the area which makes the whole entire
place very breezy. Also through our observation as I mention earlier the
area has many route that connect to this area, which makes the
community easier to access.
Rationale and benefits
Of your project
To client and community
The reasons that we had our site chosen on the 2nd floor, which is
next to the theater TV studio is because this area is located within the
study area whereby, when it’s lunch time for the students they are
able to access to this area for dining, which is nearer than going to the
commercial block (syopz mall) for dining purpose.
Also we did a survey on the circulation for the site, which there
are many route to enter the area so that is an easy access for the
community. Not only it benefits the client and the community, the
location of the place attracted attention for people to come and also
they are able to enjoy the dining experience.
Sketch plan of your proposal
From our discussion and some inspiration we have come up with
a very suitable plan we would like to propose. After a few sketches of
plan, we decided to pick one of them to be the finalize plan that will be
put into develop.
Images of your ideas
These are some ideas and concept that we got inspire
Dining area
Lounge area Balcony
Kitchen
Site plan
Our site plan is located at 2nd floor of the campus, which is beside
the theater TV studio.
Zoning of the plan layout
As you can see this is the finalize plan layout for the design of the
dining area that we would be proposing, as the full measurement of this
plan is 19.170m X 15.745m. As you can see the zoning of this plan
consists of two parts, the dining area which included lounge area, drink
counter, cashier counter, toilet, kitchen and dining tables and chairs.
Whereas for the second part is the balcony which included several ding
tables and chairs, L shape sofa and some softscape at the border of the
balcony.
Area and functions
Area: Dining Area
Function: People able to enjoy the experience of fine dining.
Area: Lounge
Function: A place where they can relax in a cool environment and
with the compliment of serving drinks.
Area: Counter Top Area
Function: People able to enjoy the scenery of chef cooking in front of
them as they also can be serve with food right away.
Area: Drink Counter
Function: Serve drinks.
Area: Balcony
Function: Design in a way where people able to enjoy the outskirt
scenery and dining at the same time.
Roles in the project
We had agreed that, we would split our roles in the project into
two individual work in which my partner will manage her roles in the
site and myself will do the same.
Name: Poh Weng Chuan
Duties: site measuring and designing the inner part of the dining area
Location:
Name: Lu Siau Vay
Duties: designing and conduct the measurement of the balcony
Location:
Materials used in construction
(Exterior)
Suggested through our discussion
Tempered glass installed to front of the dining area
Black Frame installed together with tempered glass
Glass door for the entrance
Wooden Fence at the balcony Glass Fence
Softscape:
Artificial potted plant, Weeping fig assorted
Artificial potted plant, Rose assorted
(Interior)
Suggested through our discussion
All the material list within here are all finalize and confirm through
discussion
Tiles for the whole dining area (excluding kitchen and toilet)
Toilet (Female & Male)
Tiles
Toilet bowl Basin
Kitchen
Tiles
Stove burner
Lounge Area
Armchair coffee table
Food freezer
Tables and chairs at the dining area and balcony
Square tables chairs
Rectangle tables L shape sofa
Fabric Armchair Wooden Table
Lamps
Floor lamps Crystal Light Pendant Globe
Drink counter, glass counter and cashier
Bill of Quantities
Item Description Unit Rate Qty
Amount
RM
Hardscape Costing:
1 Corian Lighted Designed Drink Counter RCD-002 set 51,320.00 1 51,320.00
2 Toilet for Female and Male set 257.40 1 257.40
Tiles: GCH03 Irregular Mosaic - Peche
Size: 3.35m * 3.35m = 6.7m²
3 Italian Style One Piece Toilet the 2038 set 477.92 6 2,867.52
4 Single Wash Basin set 745.00 6 4,470.00
5 Cashier Counter Pcs 1,924.50 1 1,924.50
6 The Kitchen Set set 1,500.00 1 1,500.00
Tiles: GBN02 Willow Gray
Size: 2.3m * 5.2m = 12m²
7 Armchair Pcs 819.00 9 7,371.00
8 High-gloss Black Coffee Table Pcs 1,000.00 3 3,000.00
9 Dining Square Table Pcs 450.00 13 5,850.00
10 Linneryd Natural Birch Chair Pcs 300.00 28 8,400.00
11 Dining Rectangle Table Pcs 490.00 6 2,940.00
12 Linneryd Natural Rectangle Chair Pcs 300.00 36 10,800.00
13 Floor Lamp Pcs 170.32 2 340.64
14 Black and Blekinge White Chair with Armrests Pcs 395.00 9 3,555.00
15 Colorful LED Glass Counter Bar m 160.38 5.2 833.98
16 Tempered Glass Window Sq/Ft 28.00 78 2,176.80
17 Black Window Frame Sq/Ft 96.20 78 7,478.90
18 Tempered Glass Entrance door set 900.00 1 900.00
19 Automatic Single Sliding Glass Door Pcs 890.00 2 1,780.00
20 Dining Area Floor Tile M.S 27.00 203 5,471.28
GBS01 Irregular Mosaic - White Basalt
21 L-shaped sofa set 4,000.00 1 4000.00
22 Wooden Table Pcs 790.00 1 790.00
23 Fabric Armchair Pcs 169.00 1 169.00
Bill of Quantities
Item Description Unit Rate Qty
Amount
RM
Hardscape Costing:
24 Wooden Pavement M.S 4.00 80 320.00
25 Wooden Fence M.S 5.70 30 171.00
26 Glass Fence (1200 x 1300 x 12mm) Pcs 275.00 13 3,575.00
27 Modern Crystal Light Pendant Globe Shade Pcs 144.34 50 7,217.00
28 Freezer No. 6,078.20 1 6,078.20
29 Stove and Oven set 1,924.50 2 3,849.00
30 Carpet Grass M.S. 2.50 16 40.00
Subtotal: 149,446.22
Softscape Costing:
1 Artificial potted plant, Rose assorted Pot 39.90 4 159.60
2 Artificial potted plant, Weeping fig assorted Pot 199.00 2 398.00
Subtotal: 557.60
Maintenance Costing:
1 Labour Cost
a. Labourers (4*RM850/month) Month 3,400.00 12 40,800.00
b. Supervisors (1*RM1200/month) Month 1,200.00 1 1,200.00
42,000.00
2 Water Feature Maintenance Month 500.00 1 500.00
3 Electrical Facilities Maintenance Month 1,000.00 1 1,000.00
Subtotal: 43,500.00
Sum of Subtotals 193,503.82
5% Preliminaries 9,675.19
Total 203,179.01
Estimated Cost 205,000.00
Authority forms
Conclusion
Throughout this project, as a group of two, we had participated lot in
site investigation. As the result, we had learned how to distribute task
accordingly, work individually, and corporate when doing site
investigation.
During this period of time we had did a lot of research and asking our
senior about their previous experience. With that we gradually gain more
knowledge and more experience.
Lastly, after this project I had really enhance my observation and
analysis skill which I think is very useful that able to put skill to the test for
the next semester. Most important is that our aim for this project is to
design to its full potential so that people able to enjoy the full experience of
dining in campus.

More Related Content

What's hot

Hightail bar
Hightail barHightail bar
Hightail barCET, BBSR
 
Lighting & Acoustic Performance Evaluation and Design
Lighting & Acoustic Performance Evaluation and DesignLighting & Acoustic Performance Evaluation and Design
Lighting & Acoustic Performance Evaluation and Designnadiacbass
 
Lighting and Acoustic Performance - Absolute Coffee
Lighting and Acoustic Performance - Absolute CoffeeLighting and Acoustic Performance - Absolute Coffee
Lighting and Acoustic Performance - Absolute CoffeeOctonio Octonio
 
PORTFOLIO FINAL SENIOR
PORTFOLIO FINAL SENIORPORTFOLIO FINAL SENIOR
PORTFOLIO FINAL SENIORPaige Smarto
 

What's hot (7)

Hightail bar
Hightail barHightail bar
Hightail bar
 
Lighting & Acoustic Performance Evaluation and Design
Lighting & Acoustic Performance Evaluation and DesignLighting & Acoustic Performance Evaluation and Design
Lighting & Acoustic Performance Evaluation and Design
 
Nightclub
NightclubNightclub
Nightclub
 
Lighting and Acoustic Performance - Absolute Coffee
Lighting and Acoustic Performance - Absolute CoffeeLighting and Acoustic Performance - Absolute Coffee
Lighting and Acoustic Performance - Absolute Coffee
 
Portfolio
PortfolioPortfolio
Portfolio
 
PORTFOLIO FINAL SENIOR
PORTFOLIO FINAL SENIORPORTFOLIO FINAL SENIOR
PORTFOLIO FINAL SENIOR
 
Christine Donohoe Portfolio
Christine Donohoe PortfolioChristine Donohoe Portfolio
Christine Donohoe Portfolio
 

Viewers also liked

business plan methods
business plan methodsbusiness plan methods
business plan methodsWeng Chuan
 
psycho assignment 1
psycho assignment 1 psycho assignment 1
psycho assignment 1 Weng Chuan
 
report English 2
report English 2report English 2
report English 2Weng Chuan
 
Assignment 02
Assignment 02 Assignment 02
Assignment 02 Weng Chuan
 
Fp part a - report template
Fp   part a - report templateFp   part a - report template
Fp part a - report templateWeng Chuan
 
Assignment 1 compare contrast essay (1)
Assignment 1 compare   contrast essay (1)Assignment 1 compare   contrast essay (1)
Assignment 1 compare contrast essay (1)Weng Chuan
 
Fp part a - report template
Fp   part a - report templateFp   part a - report template
Fp part a - report templateWeng Chuan
 
English presentation for future city
English presentation for future city English presentation for future city
English presentation for future city Weng Chuan
 
Introduction to business final
Introduction to business finalIntroduction to business final
Introduction to business finalWeng Chuan
 
Final english full report
Final english full reportFinal english full report
Final english full reportWeng Chuan
 
Psycho report
Psycho report Psycho report
Psycho report Weng Chuan
 
Compare and contrast_essay2 (2)
Compare and contrast_essay2 (2)Compare and contrast_essay2 (2)
Compare and contrast_essay2 (2)Weng Chuan
 
Architecturaldrawing 140812114339-phpapp02
Architecturaldrawing 140812114339-phpapp02Architecturaldrawing 140812114339-phpapp02
Architecturaldrawing 140812114339-phpapp02Weng Chuan
 
Fp part a - report template
Fp   part a - report templateFp   part a - report template
Fp part a - report templateWeng Chuan
 
Fp part a - report template
Fp   part a - report templateFp   part a - report template
Fp part a - report templateWeng Chuan
 
Poh weng chuan
Poh weng chuanPoh weng chuan
Poh weng chuanWeng Chuan
 
Poh weng chuan
Poh weng chuanPoh weng chuan
Poh weng chuanWeng Chuan
 
Religous building
Religous buildingReligous building
Religous buildingWeng Chuan
 

Viewers also liked (19)

business plan methods
business plan methodsbusiness plan methods
business plan methods
 
C&C report
C&C reportC&C report
C&C report
 
psycho assignment 1
psycho assignment 1 psycho assignment 1
psycho assignment 1
 
report English 2
report English 2report English 2
report English 2
 
Assignment 02
Assignment 02 Assignment 02
Assignment 02
 
Fp part a - report template
Fp   part a - report templateFp   part a - report template
Fp part a - report template
 
Assignment 1 compare contrast essay (1)
Assignment 1 compare   contrast essay (1)Assignment 1 compare   contrast essay (1)
Assignment 1 compare contrast essay (1)
 
Fp part a - report template
Fp   part a - report templateFp   part a - report template
Fp part a - report template
 
English presentation for future city
English presentation for future city English presentation for future city
English presentation for future city
 
Introduction to business final
Introduction to business finalIntroduction to business final
Introduction to business final
 
Final english full report
Final english full reportFinal english full report
Final english full report
 
Psycho report
Psycho report Psycho report
Psycho report
 
Compare and contrast_essay2 (2)
Compare and contrast_essay2 (2)Compare and contrast_essay2 (2)
Compare and contrast_essay2 (2)
 
Architecturaldrawing 140812114339-phpapp02
Architecturaldrawing 140812114339-phpapp02Architecturaldrawing 140812114339-phpapp02
Architecturaldrawing 140812114339-phpapp02
 
Fp part a - report template
Fp   part a - report templateFp   part a - report template
Fp part a - report template
 
Fp part a - report template
Fp   part a - report templateFp   part a - report template
Fp part a - report template
 
Poh weng chuan
Poh weng chuanPoh weng chuan
Poh weng chuan
 
Poh weng chuan
Poh weng chuanPoh weng chuan
Poh weng chuan
 
Religous building
Religous buildingReligous building
Religous building
 

Similar to Final project (1)

ici final project
ici final projectici final project
ici final projectWC Yan
 
Ici final project real
Ici final project realIci final project real
Ici final project realTay Jit Ying
 
ICI - Final Project - Brief Report
ICI - Final Project - Brief ReportICI - Final Project - Brief Report
ICI - Final Project - Brief ReportYung Kai
 
Ici final project document
Ici final project documentIci final project document
Ici final project documentMomo Poyi
 
Heather Williams Interior Design Portfolio
Heather Williams Interior Design Portfolio Heather Williams Interior Design Portfolio
Heather Williams Interior Design Portfolio Heather Williams
 
Project 1-Lighting & Acoustic Performance Evaluation and Design
Project 1-Lighting & Acoustic Performance Evaluation and DesignProject 1-Lighting & Acoustic Performance Evaluation and Design
Project 1-Lighting & Acoustic Performance Evaluation and DesignAngeline KH
 
ICI FINAL PROJECT REPORT
ICI FINAL PROJECT REPORT ICI FINAL PROJECT REPORT
ICI FINAL PROJECT REPORT Darshiini Vig
 
Into to construction industry final project (autosaved)
Into to construction industry final project (autosaved)Into to construction industry final project (autosaved)
Into to construction industry final project (autosaved)Kay Chong
 
Facilities Design - Report 2
Facilities Design - Report 2Facilities Design - Report 2
Facilities Design - Report 2Paul Senior
 
Building science 2 arc3413uyiyuiy 2
Building science 2 arc3413uyiyuiy 2Building science 2 arc3413uyiyuiy 2
Building science 2 arc3413uyiyuiy 2Ken Wong
 
ICI Tam Zhao Wei's Proposal
ICI Tam Zhao Wei's ProposalICI Tam Zhao Wei's Proposal
ICI Tam Zhao Wei's ProposalTamZhaoWei
 
ICI 6. tam zhao wei
ICI 6. tam zhao weiICI 6. tam zhao wei
ICI 6. tam zhao weiashleyyeap
 
Design Engineer Construct Level 2 Unit 1_1.1-4.4.pptm
Design Engineer Construct Level 2 Unit 1_1.1-4.4.pptmDesign Engineer Construct Level 2 Unit 1_1.1-4.4.pptm
Design Engineer Construct Level 2 Unit 1_1.1-4.4.pptmSamuel Boone
 

Similar to Final project (1) (20)

ICI Final
ICI FinalICI Final
ICI Final
 
ici final project
ici final projectici final project
ici final project
 
Ici final project
Ici final projectIci final project
Ici final project
 
Cl final project
Cl final projectCl final project
Cl final project
 
Ici final project real
Ici final project realIci final project real
Ici final project real
 
ICI Final Project
ICI Final ProjectICI Final Project
ICI Final Project
 
ICI - Final Project - Brief Report
ICI - Final Project - Brief ReportICI - Final Project - Brief Report
ICI - Final Project - Brief Report
 
Ici final project document
Ici final project documentIci final project document
Ici final project document
 
Heather Williams Interior Design Portfolio
Heather Williams Interior Design Portfolio Heather Williams Interior Design Portfolio
Heather Williams Interior Design Portfolio
 
Project 1-Lighting & Acoustic Performance Evaluation and Design
Project 1-Lighting & Acoustic Performance Evaluation and DesignProject 1-Lighting & Acoustic Performance Evaluation and Design
Project 1-Lighting & Acoustic Performance Evaluation and Design
 
ICI FINAL PROJECT REPORT
ICI FINAL PROJECT REPORT ICI FINAL PROJECT REPORT
ICI FINAL PROJECT REPORT
 
Ici final
Ici final Ici final
Ici final
 
Into to construction industry final project (autosaved)
Into to construction industry final project (autosaved)Into to construction industry final project (autosaved)
Into to construction industry final project (autosaved)
 
Facilities Design - Report 2
Facilities Design - Report 2Facilities Design - Report 2
Facilities Design - Report 2
 
Sathika works 2011-2014resize3
Sathika works 2011-2014resize3Sathika works 2011-2014resize3
Sathika works 2011-2014resize3
 
Building science 2 arc3413uyiyuiy 2
Building science 2 arc3413uyiyuiy 2Building science 2 arc3413uyiyuiy 2
Building science 2 arc3413uyiyuiy 2
 
ICI Tam Zhao Wei's Proposal
ICI Tam Zhao Wei's ProposalICI Tam Zhao Wei's Proposal
ICI Tam Zhao Wei's Proposal
 
ICI 6. tam zhao wei
ICI 6. tam zhao weiICI 6. tam zhao wei
ICI 6. tam zhao wei
 
Design Engineer Construct Level 2 Unit 1_1.1-4.4.pptm
Design Engineer Construct Level 2 Unit 1_1.1-4.4.pptmDesign Engineer Construct Level 2 Unit 1_1.1-4.4.pptm
Design Engineer Construct Level 2 Unit 1_1.1-4.4.pptm
 
Portfolio
PortfolioPortfolio
Portfolio
 

More from Weng Chuan

Jake r esythesize board 2
Jake r esythesize board 2Jake r esythesize board 2
Jake r esythesize board 2Weng Chuan
 
Poh weng chuan project 1a & 1b
Poh weng chuan project 1a & 1bPoh weng chuan project 1a & 1b
Poh weng chuan project 1a & 1bWeng Chuan
 
the home environment affect work from home
 the home environment affect work from home the home environment affect work from home
the home environment affect work from homeWeng Chuan
 
Comprehensive design report 2 To create a Social Hub Center that reflect the ...
Comprehensive design report 2 To create a Social Hub Center that reflect the ...Comprehensive design report 2 To create a Social Hub Center that reflect the ...
Comprehensive design report 2 To create a Social Hub Center that reflect the ...Weng Chuan
 
Project management report document a medium size project.
Project management report document a medium size project. Project management report document a medium size project.
Project management report document a medium size project. Weng Chuan
 
Project management assignment 1
Project management assignment 1 Project management assignment 1
Project management assignment 1 Weng Chuan
 
Report b tech correct compressed
Report b tech correct compressedReport b tech correct compressed
Report b tech correct compressedWeng Chuan
 
Btech i compressed
Btech i compressedBtech i compressed
Btech i compressedWeng Chuan
 
Urban theories
Urban theoriesUrban theories
Urban theoriesWeng Chuan
 
Building science ii presentation slide
Building science ii   presentation slideBuilding science ii   presentation slide
Building science ii presentation slideWeng Chuan
 
Building science ii report
Building science ii reportBuilding science ii report
Building science ii reportWeng Chuan
 
structure analysis
structure analysisstructure analysis
structure analysisWeng Chuan
 
Topic & issue proposal 2018 template (2)
Topic & issue proposal 2018 template (2)Topic & issue proposal 2018 template (2)
Topic & issue proposal 2018 template (2)Weng Chuan
 
building cons report
building cons report building cons report
building cons report Weng Chuan
 
Parliament building
Parliament buildingParliament building
Parliament buildingWeng Chuan
 

More from Weng Chuan (20)

Jake r esythesize board 2
Jake r esythesize board 2Jake r esythesize board 2
Jake r esythesize board 2
 
Poh weng chuan project 1a & 1b
Poh weng chuan project 1a & 1bPoh weng chuan project 1a & 1b
Poh weng chuan project 1a & 1b
 
the home environment affect work from home
 the home environment affect work from home the home environment affect work from home
the home environment affect work from home
 
Comprehensive design report 2 To create a Social Hub Center that reflect the ...
Comprehensive design report 2 To create a Social Hub Center that reflect the ...Comprehensive design report 2 To create a Social Hub Center that reflect the ...
Comprehensive design report 2 To create a Social Hub Center that reflect the ...
 
Project management report document a medium size project.
Project management report document a medium size project. Project management report document a medium size project.
Project management report document a medium size project.
 
Project management assignment 1
Project management assignment 1 Project management assignment 1
Project management assignment 1
 
Report b tech correct compressed
Report b tech correct compressedReport b tech correct compressed
Report b tech correct compressed
 
Btech i compressed
Btech i compressedBtech i compressed
Btech i compressed
 
Urban theories
Urban theoriesUrban theories
Urban theories
 
Synopsis 3
Synopsis 3Synopsis 3
Synopsis 3
 
Synopsis 2
Synopsis 2Synopsis 2
Synopsis 2
 
Synopsis 1
Synopsis 1Synopsis 1
Synopsis 1
 
Building science ii presentation slide
Building science ii   presentation slideBuilding science ii   presentation slide
Building science ii presentation slide
 
Building science ii report
Building science ii reportBuilding science ii report
Building science ii report
 
structure analysis
structure analysisstructure analysis
structure analysis
 
Topic & issue proposal 2018 template (2)
Topic & issue proposal 2018 template (2)Topic & issue proposal 2018 template (2)
Topic & issue proposal 2018 template (2)
 
building cons report
building cons report building cons report
building cons report
 
Timeline
TimelineTimeline
Timeline
 
Parliament building
Parliament buildingParliament building
Parliament building
 
New model
New modelNew model
New model
 

Final project (1)

  • 1. Introduction to the Construction Industry Final project Group name: Poh Weng Chuan, Lu Siau Vay Student ID: 0319951, 0318567 Tutor: Puan Hasmanira Mokhtar Project Title: FNB(food and beverage)
  • 2. Contents 1. Introduction 2. Your suggestion and proposal 3. Introduction to the site 4. Site analysis and observation 5. The rationale and benefits of your project in to the client and the surrounding community 6. Sketch plan of your proposal 7. Images of your idea 8. Site plan 9. Zoning of the plan layout 10. Area and its functions 11. Roles in the project 12. Materials used in construction (exterior & interior) 13. Costing 14. Information/form of the authority procedures 15. Conclusion (aim of the project)
  • 3. INTRODUCTION Outcomes: 1. To coordinate and develop an understanding of coherent working relations and to improve the communication channels. 2. Ability to document their observations and understanding from interview session and research resources as well as to communicate their findings in a systematic and convincing presentation and reports. 3. Explain and illustrate structures of organizations involved in the construction industry from the design stage to final account stage. Task: In a group work of 2 students, we need to find a specific land within campus area to initiate a small construction project. The size of the land shall not be more than 30m x 30m. We should propose one project that serves one of the following purposes. 1. Recreation area 2. Study Enhancement Area 3. Rest area 4. Food and beverage (dining area) 5. Commercial area (exclude food and beverage)
  • 4. Suggestion / proposal Towards the site that we had chosen, my group member and I did a lot of website and book references research. Throughout this process we had suggested that the empty land next to the theater TV studio is most suitable to develop a food and beverage area (dining area). We initially wanted to propose on a café shop, due the space within the area, it’s more suitable to design a dining area. Our proposal on the design is much like fine dining or classic restaurant for the purpose for students and people within the campus can enjoy the dining experience. Dining area
  • 5. INTRODUCTION TO THE SITE Our 8m x 16m selected site is the empty open public spaces beside the experimental theatre. Our chosen site is between Block B and Block C. Go left after you walk out from library, then go straight. It’s on your right hand side after you walk about 5 to 10 meters. The selected site is a space that people passes by everyday so we decided to construct a food and beverage area on this site because people can easily find where our site locates.
  • 6. Site analysis and observation As me and my group partner did a site analysis before choosing it. The result was quite satisfying, due to the spacious of the area, the wind flow direction comes directly to the area which makes the whole entire place very breezy. Also through our observation as I mention earlier the area has many route that connect to this area, which makes the community easier to access.
  • 7. Rationale and benefits Of your project To client and community The reasons that we had our site chosen on the 2nd floor, which is next to the theater TV studio is because this area is located within the study area whereby, when it’s lunch time for the students they are able to access to this area for dining, which is nearer than going to the commercial block (syopz mall) for dining purpose. Also we did a survey on the circulation for the site, which there are many route to enter the area so that is an easy access for the community. Not only it benefits the client and the community, the location of the place attracted attention for people to come and also they are able to enjoy the dining experience.
  • 8. Sketch plan of your proposal From our discussion and some inspiration we have come up with a very suitable plan we would like to propose. After a few sketches of plan, we decided to pick one of them to be the finalize plan that will be put into develop.
  • 9. Images of your ideas These are some ideas and concept that we got inspire Dining area Lounge area Balcony Kitchen
  • 10. Site plan Our site plan is located at 2nd floor of the campus, which is beside the theater TV studio.
  • 11. Zoning of the plan layout As you can see this is the finalize plan layout for the design of the dining area that we would be proposing, as the full measurement of this plan is 19.170m X 15.745m. As you can see the zoning of this plan consists of two parts, the dining area which included lounge area, drink counter, cashier counter, toilet, kitchen and dining tables and chairs. Whereas for the second part is the balcony which included several ding tables and chairs, L shape sofa and some softscape at the border of the balcony.
  • 12. Area and functions Area: Dining Area Function: People able to enjoy the experience of fine dining. Area: Lounge Function: A place where they can relax in a cool environment and with the compliment of serving drinks. Area: Counter Top Area Function: People able to enjoy the scenery of chef cooking in front of them as they also can be serve with food right away. Area: Drink Counter Function: Serve drinks. Area: Balcony Function: Design in a way where people able to enjoy the outskirt scenery and dining at the same time.
  • 13. Roles in the project We had agreed that, we would split our roles in the project into two individual work in which my partner will manage her roles in the site and myself will do the same. Name: Poh Weng Chuan Duties: site measuring and designing the inner part of the dining area Location: Name: Lu Siau Vay Duties: designing and conduct the measurement of the balcony Location:
  • 14. Materials used in construction (Exterior) Suggested through our discussion Tempered glass installed to front of the dining area Black Frame installed together with tempered glass Glass door for the entrance
  • 15. Wooden Fence at the balcony Glass Fence Softscape: Artificial potted plant, Weeping fig assorted Artificial potted plant, Rose assorted
  • 16. (Interior) Suggested through our discussion All the material list within here are all finalize and confirm through discussion Tiles for the whole dining area (excluding kitchen and toilet) Toilet (Female & Male) Tiles Toilet bowl Basin
  • 18. Tables and chairs at the dining area and balcony Square tables chairs Rectangle tables L shape sofa Fabric Armchair Wooden Table
  • 19. Lamps Floor lamps Crystal Light Pendant Globe Drink counter, glass counter and cashier
  • 20. Bill of Quantities Item Description Unit Rate Qty Amount RM Hardscape Costing: 1 Corian Lighted Designed Drink Counter RCD-002 set 51,320.00 1 51,320.00 2 Toilet for Female and Male set 257.40 1 257.40 Tiles: GCH03 Irregular Mosaic - Peche Size: 3.35m * 3.35m = 6.7m² 3 Italian Style One Piece Toilet the 2038 set 477.92 6 2,867.52 4 Single Wash Basin set 745.00 6 4,470.00 5 Cashier Counter Pcs 1,924.50 1 1,924.50 6 The Kitchen Set set 1,500.00 1 1,500.00 Tiles: GBN02 Willow Gray Size: 2.3m * 5.2m = 12m² 7 Armchair Pcs 819.00 9 7,371.00 8 High-gloss Black Coffee Table Pcs 1,000.00 3 3,000.00 9 Dining Square Table Pcs 450.00 13 5,850.00 10 Linneryd Natural Birch Chair Pcs 300.00 28 8,400.00 11 Dining Rectangle Table Pcs 490.00 6 2,940.00 12 Linneryd Natural Rectangle Chair Pcs 300.00 36 10,800.00 13 Floor Lamp Pcs 170.32 2 340.64 14 Black and Blekinge White Chair with Armrests Pcs 395.00 9 3,555.00 15 Colorful LED Glass Counter Bar m 160.38 5.2 833.98 16 Tempered Glass Window Sq/Ft 28.00 78 2,176.80 17 Black Window Frame Sq/Ft 96.20 78 7,478.90 18 Tempered Glass Entrance door set 900.00 1 900.00 19 Automatic Single Sliding Glass Door Pcs 890.00 2 1,780.00 20 Dining Area Floor Tile M.S 27.00 203 5,471.28 GBS01 Irregular Mosaic - White Basalt 21 L-shaped sofa set 4,000.00 1 4000.00 22 Wooden Table Pcs 790.00 1 790.00 23 Fabric Armchair Pcs 169.00 1 169.00
  • 21. Bill of Quantities Item Description Unit Rate Qty Amount RM Hardscape Costing: 24 Wooden Pavement M.S 4.00 80 320.00 25 Wooden Fence M.S 5.70 30 171.00 26 Glass Fence (1200 x 1300 x 12mm) Pcs 275.00 13 3,575.00 27 Modern Crystal Light Pendant Globe Shade Pcs 144.34 50 7,217.00 28 Freezer No. 6,078.20 1 6,078.20 29 Stove and Oven set 1,924.50 2 3,849.00 30 Carpet Grass M.S. 2.50 16 40.00 Subtotal: 149,446.22 Softscape Costing: 1 Artificial potted plant, Rose assorted Pot 39.90 4 159.60 2 Artificial potted plant, Weeping fig assorted Pot 199.00 2 398.00 Subtotal: 557.60 Maintenance Costing: 1 Labour Cost a. Labourers (4*RM850/month) Month 3,400.00 12 40,800.00 b. Supervisors (1*RM1200/month) Month 1,200.00 1 1,200.00 42,000.00 2 Water Feature Maintenance Month 500.00 1 500.00 3 Electrical Facilities Maintenance Month 1,000.00 1 1,000.00 Subtotal: 43,500.00 Sum of Subtotals 193,503.82 5% Preliminaries 9,675.19 Total 203,179.01 Estimated Cost 205,000.00
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30. Conclusion Throughout this project, as a group of two, we had participated lot in site investigation. As the result, we had learned how to distribute task accordingly, work individually, and corporate when doing site investigation. During this period of time we had did a lot of research and asking our senior about their previous experience. With that we gradually gain more knowledge and more experience. Lastly, after this project I had really enhance my observation and analysis skill which I think is very useful that able to put skill to the test for the next semester. Most important is that our aim for this project is to design to its full potential so that people able to enjoy the full experience of dining in campus.