Line9OntarioReview
Upcoming SlideShare
Loading in...5
×
 

Like this? Share it with your network

Share

Line9OntarioReview

on

  • 188 views

This petition is to secure a provincial review of Enbridge Pipeline Line 9.

This petition is to secure a provincial review of Enbridge Pipeline Line 9.

Statistics

Views

Total Views
188
Views on SlideShare
188
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft Word

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Line9OntarioReview Document Transcript

  • 1. To the Legislative Assembly of OntarioWhereas in Ontario, Line 9 travels through densely populated areas; crossing farmlands and riverswhich flow into the Great Lakes and which provide 80% of the drinking water for Ontarios residents.Whereas Ontarios water resources provides for municipal industrial and agricultural use and is afundamental part of Ontarios economyWhereas recent weakened federal oversight limits reviews to only 2 years duration in the absence ofscientific evidence to prove this time frame is reasonable to assess all risksWhereas the Province has the mandate to protect source water, environment and economyWhereas a document filed with the National Energy Board, shows that Enbridge Inc. plans to apply tochange what the pipeline can carry, from conventional oil to diluted bitumen, and dramatically expandthe amount of oil carried by the pipelineWhereas citizens do not want Ontario to be a passive conduit of tar sands oil for export, forced toaccept all of the environmental and economic risks of this project with little rewardWe the undersigned residents of the Province of Ontario call upon the Legislative Assembly ofOntario to initiate a formal review of the Line 9 reversal project. NAME: PRINT ADDRESS Signature