1<br />www.visuresolutions.com<br />Requirements Management & Engineering with IRQA<br />TOOL VENDOR CHALLENGE<br />INCOSE...
2<br />The IRQA Scope<br />End-to-end Requirements Definition &  Management tool<br />
3<br />TVC Project Goals<br /><ul><li> Maximize customer satisfaction</li></ul>Build project on-time<br />Fulfill customer...
4<br />TVC Problem Statement<br />
5<br />TVC Problem StatementImport inside IRQA<br />
6<br />TVC Problem StatementCustomer requirements in IRQA<br />
7<br />TVC Problem StatementAssessing requirements using configurable attributes<br />
8<br />TVC Problem StatementWorkflow support<br />
Elements StructureProcess Framework<br />Define your own requirements process<br />9<br />
Elements StructureProcess Framework – Navigating to elements<br />10<br />
Elements StructureProcess Framework – Navigating to the traceability<br />11<br />
Elements StructureProcess Framework – Analyzing indirect traceability<br />12<br />
Functional DescriptionSolution Specification<br />Use Cases / services and actors can be traced to the requirements<br />1...
Functional DescriptionTextual Use Cases<br />14<br />
15<br />Understanding the SystemSystem and Environment (Context Diagrams)<br />
16<br />Understanding the SystemConcept Diagrams<br />
Following the lifecycleIntegrating with 3rd party solutions<br />Synchronization<br />(Requirements, UC, Test Cases, Exter...
Test Management
Issue Tracking
Change Management
Project Management
…</li></ul>17<br />
ReusabilityRequirements association?<br />You already built a similar system for the city of Allentown?<br />Customer Requ...
Upcoming SlideShare
Loading in...5
×

INCOSE 2011 - Tool Vendor Challenge - Visure Solutions

725

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
725
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
9
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

INCOSE 2011 - Tool Vendor Challenge - Visure Solutions

  1. 1. 1<br />www.visuresolutions.com<br />Requirements Management & Engineering with IRQA<br />TOOL VENDOR CHALLENGE<br />INCOSE 2011<br />Jean-François Thibeault<br />jft_rtss@visuresolutions.com<br />
  2. 2. 2<br />The IRQA Scope<br />End-to-end Requirements Definition & Management tool<br />
  3. 3. 3<br />TVC Project Goals<br /><ul><li> Maximize customer satisfaction</li></ul>Build project on-time<br />Fulfill customer requests<br /><ul><li> Minimize cost</li></ul>Reuse existing project<br />
  4. 4. 4<br />TVC Problem Statement<br />
  5. 5. 5<br />TVC Problem StatementImport inside IRQA<br />
  6. 6. 6<br />TVC Problem StatementCustomer requirements in IRQA<br />
  7. 7. 7<br />TVC Problem StatementAssessing requirements using configurable attributes<br />
  8. 8. 8<br />TVC Problem StatementWorkflow support<br />
  9. 9. Elements StructureProcess Framework<br />Define your own requirements process<br />9<br />
  10. 10. Elements StructureProcess Framework – Navigating to elements<br />10<br />
  11. 11. Elements StructureProcess Framework – Navigating to the traceability<br />11<br />
  12. 12. Elements StructureProcess Framework – Analyzing indirect traceability<br />12<br />
  13. 13. Functional DescriptionSolution Specification<br />Use Cases / services and actors can be traced to the requirements<br />13<br />
  14. 14. Functional DescriptionTextual Use Cases<br />14<br />
  15. 15. 15<br />Understanding the SystemSystem and Environment (Context Diagrams)<br />
  16. 16. 16<br />Understanding the SystemConcept Diagrams<br />
  17. 17. Following the lifecycleIntegrating with 3rd party solutions<br />Synchronization<br />(Requirements, UC, Test Cases, External Elements)<br />Synchronization<br />(Requirements, UC, Test Cases)<br />3rd party solutions for:<br /><ul><li>Design (UML)
  18. 18. Test Management
  19. 19. Issue Tracking
  20. 20. Change Management
  21. 21. Project Management
  22. 22. …</li></ul>17<br />
  23. 23. ReusabilityRequirements association?<br />You already built a similar system for the city of Allentown?<br />Customer Requirements<br />System Requirements<br />Hardware Requirements<br />Software Requirements<br />18<br />
  24. 24. ReusabilityRequirements association?<br />Why not reusing a defined subset of the requirements…<br />Customer Requirements<br />Component X<br />System Requirements<br />Hardware Requirements<br />Software Requirements<br />19<br />
  25. 25. ReusabilityRequirements association?<br />… in the new project for the city of Johnsonville?<br />Customer Requirements<br />Customer Requirements<br />Customer Requirements<br />Component X<br />System Requirements<br />System Requirements<br />System Requirements<br />Hardware Requirements<br />Software Requirements<br />Hardware Requirements<br />Software Requirements<br />Hardware Requirements<br />Software Requirements<br />20<br />
  26. 26. 21<br />TVC Conclusion<br /><ul><li> Maximize customer satisfaction
  27. 27. Build project on-time
  28. 28. Assigning priority and status to each requirement, model and acceptance test
  29. 29. Fulfill customer requests
  30. 30. Validating requirements against proposed solutions (Requirements vs. Modeling), and tests (acceptance and validation tests).
  31. 31. Tracing the elements in IRQA to other phases of the lifecycle (design, tests)
  32. 32. Minimize cost
  33. 33. Reuse existing project
  34. 34. Previously developed project: City of Allentown</li></li></ul><li>22<br />IRQA Summary<br />Integrated Environment<br />Graphical Interface<br />Requirements Engineering<br />
  35. 35. 23<br />Visure Solutions<br />The Requirements Company<br />www.visuresolutions.com<br />Copyright© 2011 Visure Solutions, S. L. All rights reserved<br />THANK YOU FOR YOUR ATTENTION!<br />Come see us at our booth or attend any of our web demos (more information on our website: www.visuresolutions.com).<br />
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×