Case study - Stoke Newington School: Assessing new build vs. refurbishment value options

Case study - Stoke Newington School: Assessing new build vs. refurbishment value options

Statistics

Views

Total Views
790
Views on SlideShare
780
Embed Views
10

Actions

Likes
0
Downloads
0
Comments
0

1 Embed 10

http://www.remodellingeducation.com 10

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Jude Harris & Jill Cameron Jude Harris & Jill Cameron Presentation Transcript

    • Case Study: Assessing New Build v Refurbishment Jude Harris, Associate Director Jestico + Whiles Jill Cameron, Director of Resourcing (BSF Lead) Stoke Newington School Remodelling Education Spaces | Stoke Newington School
    • London Borough of Hackney Remodelling Education Spaces | Stoke Newington School
    • Aerial View of Site Remodelling Education Spaces | Stoke Newington School
    • The Existing School (2006) Remodelling Education Spaces | Stoke Newington School
    • Original Drawings (1967) Remodelling Education Spaces | Stoke Newington School
    • The Existing School (2006) Remodelling Education Spaces | Stoke Newington School
    • Education Vision and Priorities Remodelling Education Spaces | Stoke Newington School
    • Existing School (11,784m²) Remodelling Education Spaces | Stoke Newington School
    • New Build Proposals | Reference Scheme Remodelling Education Spaces | Stoke Newington School
    • New Build Proposals Remodelling Education Spaces | Stoke Newington School
    • New Build Proposals Remodelling Education Spaces | Stoke Newington School
    • New Build Proposals (13,618m²) Remodelling Education Spaces | Stoke Newington School
    • Aerial Perspective | As Existing Remodelling Education Spaces | Stoke Newington School
    • Aerial Perspective | As Proposed Remodelling Education Spaces | Stoke Newington School
    • Construction Phase 1 Remodelling Education Spaces | Stoke Newington School
    • Construction Phase 2 Remodelling Education Spaces | Stoke Newington School
    • Temporary Accommodation Remodelling Education Spaces | Stoke Newington School
    • Street Elevation (Clissold Road) Remodelling Education Spaces | Stoke Newington School
    • The ‘Street’ Remodelling Education Spaces | Stoke Newington School
    • The ‘Street’ Remodelling Education Spaces | Stoke Newington School
    • The ‘Street’ Remodelling Education Spaces | Stoke Newington School
    • Dining Hall Remodelling Education Spaces | Stoke Newington School
    • New Build v Refurbishment | Ground Floor 14% 40% 31% 15% Remodelling Education Spaces | Stoke Newington School
    • New Build v Refurbishment | First Floor 14% 40% 31% 15% Remodelling Education Spaces | Stoke Newington School
    • New Build v Refurbishment | Second Floor 14% 40% 31% 15% Remodelling Education Spaces | Stoke Newington School
    • SEN School and Housing on the Site Remodelling Education Spaces | Stoke Newington School
    • Landscaping Strategy Remodelling Education Spaces | Stoke Newington School
    • New Welcome Plaza Remodelling Education Spaces | Stoke Newington School
    • Wayfinding Remodelling Education Spaces | Stoke Newington School
    • Wayfinding | Ground Floor Remodelling Education Spaces | Stoke Newington School
    • Wayfinding | First Floor Remodelling Education Spaces | Stoke Newington School
    • Wayfinding | Second Floor Remodelling Education Spaces | Stoke Newington School
    • Wayfinding Remodelling Education Spaces | Stoke Newington School
    • Sustainability Remodelling Education Spaces | Stoke Newington School
    • Sustainability Remodelling Education Spaces | Stoke Newington School
    • New Build v Refurbishment | Costs Stoke Newington School £20m 13,618m² £1,468/m² 1500 pupils £13,333 per pupil The Hackney City Academy £30m 10,357m² £2,896/m² 1140 pupils £26,315 per pupil Remodelling Education Spaces | Stoke Newington School