Jude Harris & Jill Cameron

602

Published on

Case study - Stoke Newington School: Assessing new build vs. refurbishment value options

Case study - Stoke Newington School: Assessing new build vs. refurbishment value options

Published in: Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
602
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Case Study: Assessing New Build v Refurbishment Jude Harris, Associate Director Jestico + Whiles Jill Cameron, Director of Resourcing (BSF Lead) Stoke Newington School Remodelling Education Spaces | Stoke Newington School
  • 2. London Borough of Hackney Remodelling Education Spaces | Stoke Newington School
  • 3. Aerial View of Site Remodelling Education Spaces | Stoke Newington School
  • 4. The Existing School (2006) Remodelling Education Spaces | Stoke Newington School
  • 5. Original Drawings (1967) Remodelling Education Spaces | Stoke Newington School
  • 6. The Existing School (2006) Remodelling Education Spaces | Stoke Newington School
  • 7. Education Vision and Priorities Remodelling Education Spaces | Stoke Newington School
  • 8. Existing School (11,784m²) Remodelling Education Spaces | Stoke Newington School
  • 9. New Build Proposals | Reference Scheme Remodelling Education Spaces | Stoke Newington School
  • 10. New Build Proposals Remodelling Education Spaces | Stoke Newington School
  • 11. New Build Proposals Remodelling Education Spaces | Stoke Newington School
  • 12. New Build Proposals (13,618m²) Remodelling Education Spaces | Stoke Newington School
  • 13. Aerial Perspective | As Existing Remodelling Education Spaces | Stoke Newington School
  • 14. Aerial Perspective | As Proposed Remodelling Education Spaces | Stoke Newington School
  • 15. Construction Phase 1 Remodelling Education Spaces | Stoke Newington School
  • 16. Construction Phase 2 Remodelling Education Spaces | Stoke Newington School
  • 17. Temporary Accommodation Remodelling Education Spaces | Stoke Newington School
  • 18. Street Elevation (Clissold Road) Remodelling Education Spaces | Stoke Newington School
  • 19. The ‘Street’ Remodelling Education Spaces | Stoke Newington School
  • 20. The ‘Street’ Remodelling Education Spaces | Stoke Newington School
  • 21. The ‘Street’ Remodelling Education Spaces | Stoke Newington School
  • 22. Dining Hall Remodelling Education Spaces | Stoke Newington School
  • 23. New Build v Refurbishment | Ground Floor 14% 40% 31% 15% Remodelling Education Spaces | Stoke Newington School
  • 24. New Build v Refurbishment | First Floor 14% 40% 31% 15% Remodelling Education Spaces | Stoke Newington School
  • 25. New Build v Refurbishment | Second Floor 14% 40% 31% 15% Remodelling Education Spaces | Stoke Newington School
  • 26. SEN School and Housing on the Site Remodelling Education Spaces | Stoke Newington School
  • 27. Landscaping Strategy Remodelling Education Spaces | Stoke Newington School
  • 28. New Welcome Plaza Remodelling Education Spaces | Stoke Newington School
  • 29. Wayfinding Remodelling Education Spaces | Stoke Newington School
  • 30. Wayfinding | Ground Floor Remodelling Education Spaces | Stoke Newington School
  • 31. Wayfinding | First Floor Remodelling Education Spaces | Stoke Newington School
  • 32. Wayfinding | Second Floor Remodelling Education Spaces | Stoke Newington School
  • 33. Wayfinding Remodelling Education Spaces | Stoke Newington School
  • 34. Sustainability Remodelling Education Spaces | Stoke Newington School
  • 35. Sustainability Remodelling Education Spaces | Stoke Newington School
  • 36. New Build v Refurbishment | Costs Stoke Newington School £20m 13,618m² £1,468/m² 1500 pupils £13,333 per pupil The Hackney City Academy £30m 10,357m² £2,896/m² 1140 pupils £26,315 per pupil Remodelling Education Spaces | Stoke Newington School

×