NSM=qççäÉó=píêÉÉí
Southwark
what was delivered site
ground floor




first floor




               what was delivered plans
north-south section




east-west section




                      what was delivered sections
facade construction
what was delivered internal atrium
interior typical upper floor
interior recessed high level lighting runs and suspended fittings
building services integration
construction permanent formwork to p/t slabs
Perimeter air supply
P i          i       l
• minimum horizontal distribution
• distributed vertical ducts
• motorised dam...
building services thermal mass
Effect of exposed thermal mass – perimeter bay
            p                    p           y
                            ...
Tooley Street – Carbon Emissions Comparison
     y                              p

                            Tooley Stre...
Case study: 160 Tooley Street
Upcoming SlideShare
Loading in...5
×

Case study: 160 Tooley Street

553

Published on

Nic Crawley, associate and head of sustainability, Allford Hall Monaghan Morris

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
553
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
5
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Case study: 160 Tooley Street

  1. 1. NSM=qççäÉó=píêÉÉí Southwark
  2. 2. what was delivered site
  3. 3. ground floor first floor what was delivered plans
  4. 4. north-south section east-west section what was delivered sections
  5. 5. facade construction
  6. 6. what was delivered internal atrium
  7. 7. interior typical upper floor
  8. 8. interior recessed high level lighting runs and suspended fittings
  9. 9. building services integration
  10. 10. construction permanent formwork to p/t slabs
  11. 11. Perimeter air supply P i i l • minimum horizontal distribution • distributed vertical ducts • motorised damper provision • separate ventilation control • allow ‘clear’ void for tenant building services ducting
  12. 12. building services thermal mass
  13. 13. Effect of exposed thermal mass – perimeter bay p p y 35 30 25 Resultant Temperature, ˚C C 20 T 15 Exposed Thermal Mass & Night Cooling No Exposed Thermal Mass 10 Outside Temperature 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time, hrs building services Arup ROOM analysis
  14. 14. Tooley Street – Carbon Emissions Comparison y p Tooley Street - Carbon Emissions Comparison 1600 small power (unregulated) 1400 1200 Lighting, heating, cooling, ventilation 1000 1000 kgCO2 800 600 400 200 0 Notional Building Target Building (Part L) Actual Building building services energy calculations
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×