Executive summary
Planning and implementing a VMware disaster recovery (DR) plan is not a task
to be taken lightly. If you jump in without some minimum planning you’ll end up
with some surprises you, your boss or your budget won’t be agreeable to. Worse
yet, if you skip key steps neglecting to collect key information prior to designing,
you can end up with an unwieldy DR solution that doesn’t meet the needs of the
business.

This eBook will serve as a checklist that can guide you on the creation of a
top-notch VMware disaster recovery plan. The checklist follows industry best
practices for implementing complex technology solutions by taking a phased
approach to instituting a DR plan. This approach includes the following phases:
   •	 Assessment—Gathering key requirements for DR solution
   •	 Design—Creating a DR plan to meet business and technical requirements
   •	 Deploy—Stand up necessary infrastructure. Install, configure and test
      solution
   •	 Manage—Test your DR plan as frequently as possible

This approach should be reapplied as your business requirements change or to
take advantage of technology advancements that can reduce costs and enhance
DR capabilities. The result is a DR plan that is flexible enough to adapt with
the times and your business. Since we’re talking about recovery of VMware
environments, we will focus on leveraging its unique capabilities to the maximum
degree. The unique capabilities and properties of VMware environments allow us
to create the ultimate test-driven DR plan and help be a catalyst for moving to
100% virtualized environments. The focus of this eBook is the planning side of
DR and less on the execution and operation of the DR plan. As such, we'll focus
on the Assess and Design phases.

Assess
    Business impact analysis
    Determine RPO (recovery point objective) and RTO (recovery time 		
   	objective)
    Understand your budget
    Understand application dependencies
    Automate VMware environment data collection

Design
    Virtualize stragglers
    Analyze resource requirements
    Design for easiest restore
    Decide on infrastructure configuration
    Test-drive DR plan




                                                                                  2
VMware Disaster Recovery Planning: Essential Checklist




Business Impact Analysis
Let’s be frank. As cool as server virtualization technology is, it doesn’t provide
your business with revenue, unless you are company like VMware or Veeam.
As IT professionals, your job is to design, develop and manage the technology
systems that support the business’ ability to turn a profit. But equally important,
is the ability to restore these systems as rapidly as possible in a disaster. Before
you begin spending money on your disaster recovery software, hardware and
facilities, you need to know where to start. You should first assess your business
and gain an intimate understanding of which processes, systems and data are
most critical to the success and future survival of your company. This process is
referred to as a business impact analysis (BIA). Without one, you open yourself
to the risk of wasting resources or overprotecting assets of little value to your
business. Worse yet, without a BIA, you may end up neglecting to plan recovery
for key IT systems that your mission-critical systems depend on.

What's in a BIA?
A BIA can be as complex and time consuming as you want it to be. Complexity
and time are also a discrete function of the size and complexity of your business.
In either regard, all business impact assessments are looking to accomplish the
same fundamental tasks. For example, the following list was gathered from a
great free BIA template published by the U.S. Centers for Disease Control and
Prevention for the purpose of helping guide the development of a DR plan. In
this template, the following main areas of assessment are addressed:

Key BIA activities
   1.	Identify critical business systems
   2.	Identify system resource dependencies
   3.	Identify key support personnel or teams
   4.	Estimate disruption impact
   5.	Determine resource recovery priority

Having this granular knowledge of the business impact of your critical systems
not only will help you in a real disaster scenario, but it will help you test your
preparation for the disaster. Knowing where to focus your DR planning efforts
will help you greatly streamline and prioritize your disaster recovery exercises,
or tests.

The BIA is not just a technical system inventory, but you’ll need to work with
the business side to define RPO and RTO for key business services and the IT
services they depend on. Setting the objectives gives DR planners and managers
something to design and manage to. Without defining these key requirements
for your disaster recovery planning, you risk spending too much on a higher
level of data protection than is required. The other risk is that you don’t provide
enough protection for your critical resources and end up costing the business
time and money in the event of a disaster. In the following section, we’ll walk
through why RPO and RTO planning matters.




                                                                                   3
VMware Disaster Recovery Planning: Essential Checklist




Determine RPO and RTO
During your BIA, you should spend a good deal of time developing an intimate
understanding of how your business makes money and catalog the key resources
and processes necessary to enable revenue creation. In some companies,
thismay be a single business process that will translate to clear guidance on
RTO/RPO requirements. In larger companies, with diversified products and
services, you will likely catalog multiple use cases to address with different DR
strategies. Regardless of the business size, the process of DR planning is similar,
and we apply the same process to categorize the use cases we discover in our DR
assessments. The following are some example DR use cases. By reviewing these
common use cases and identifying their RPO/RTO, you should be able to apply
similar logic to your own business and gather these guiding requirements.

Educational Institution: Keeping costs low
On one end of the spectrum, would be a grade school with fixed budget based
on enrollment and no revenue generation based on system up-time. However,
the core product and service coming out of the school is the quality of the
children’s education. In an environment like this, it’s important to keep costs as
low as possible, but still provide a system that will reduce cost of recovery that
can likely call for third-party IT staff to help recover systems. Most systems can
withstand some loss of data and recovery needs to be timely, but certainly not
instant. Since schools can still operate effectively without IT, it is likely that a RTO
measured in days to a week will result from this assessment. The RPO would
likely be around 24 to 48 hours for most systems.

Accounting Firm: CDP during tax season
Throughout the year accounting firms do a certain amount of business and are
tolerant of 24 to 48 hour RPO and RTO. But in the United States, from February
through April, it is the busy tax season. Overtime and packed daytime schedules
are the reality. Data loss and system downtime is NOT an option. Near-zero
RTOs and RPOs are required for this use case. For the small and midsized firms,
expensive active-active accounting system designs are not an option, and
neither is expensive array level replication. This is a perfect use case for Veeam’s
SmartCDP. SmartCDP is a near-continuous data protection (near-CDP) solution
where virtual machines (VMs) are continuously replicated to a safe site which
brings RPO down to around 5 minutes and RTO can be as fast as the accounting
firm’s IT professionals and executives are ready to declare a disaster and restart
the affected VMs.
Healthcare: Ensuring quality patient care
In a healthcare setting there exists the perfect storm for DR planning. Today's
healthcare IT systems can actually be a profit center for many organizations.
These systems need to be functioning to allow profitable procedures like MRIs,
ultrasounds or any of the cardiac-related procedures. The profit side of the
equation is important, but not the only concern. In healthcare, patient care is
king. If technology is not available to serve patient needs, then the profits are
meaningless. Healthcare operates around the clock and pressures IT to deliver
services at a very high level. These highly critical systems demand a low RTO to
guarantee patient care goals are met and healthcare organizations can remain
profitable through systems disasters. Data loss isn't necessarily a financial risk,



                                                                                      4
VMware Disaster Recovery Planning: Essential Checklist



unless lawsuits are considered, but a high quality of patient care dictates that the
best patient health information to be available to ensure continuously good care
through shift changes and doctor rotations. So, in most healthcare organizations,
budget becomes the determining factor for what you'll end up choosing for RTO
and RPO. While working within your fixed budget, you may establish RTOs and
RPOs that are as low as possible during the times you require. Veeam Backup
 Replication with its ability to back up, replicate and provide near-CDP in one
product, provides the flexibility to address all healthcare needs.

Understand Your Budget
Virtualized DR is much less expensive than traditional physical DR, but it is still an
additional cost on top of your already sizable investment in virtualization software,
supported server hardware and new storage systems. Some companies will have
the budget freedom to design the “Cadillac” of DR solutions. For the rest of us,
we have to be very aware of the budget limitations and the factors contributing
to that limitation. Knowing your budget limit and some key strategies will allow
you to optimize your DR plan to get the most capabilities out of your limited
resources.

Budget purchases wisely
One recommendation for DR budget planning is to consolidate all disaster
recovery options inside a single product so that you’re not paying twice for two
software products, two backup infrastructures and the associated operational
costs that can sink you. Instead, plan to make a strategic investment in virtualized
DR and go “all-in” with Veeam Backup  Replication and drop strategies that
leverage legacy components. This can reduce ongoing license and support cost
as well as simplify operations, creating a substantial cost savings.

Phased Budget
Ideally, you should suggest a phased DR assessment budget by the business or
by your customer. In this method, you are allowed a fixed budget to conduct
your assessment and initial planning with the expectation the outcome will be a
more accurate budget estimation of the final solution. This method builds trust
with the business or customer and ensures them that you are not making these
recommendations on a whim and that the DR plan is exercising due diligence.
But once the assessment is complete and a preliminary design can be conducted,
you'll have to a decision to make in determining how much you will ask for.

Communicate the Vision
Just like companies and their initial server virtualization efforts realized, you may
have to spend money to save money in the case of virtualized DR. These first
pioneering IT organizations realized that the sooner they virtualized their entire
environment, the sooner they could start reaping the rewards of reduced power
consumption, reduced server hardware cost, and greater flexibility in operations.
Delaying ROI of virtualizing your physical servers was not recommended and the
same thing is true with a virtualized DR plan. The longer you have to maintain
a legacy DR solution alongside a virtualized one, the more risk your business
accepts, the more costly DR exercises are, and the more operational costs IT
departments take on to maintain two or more separate DR solutions. At this point
in the budget process, it's important to lay out the long term vision for 100%


                                                                                    5
VMware Disaster Recovery Planning: Essential Checklist



virtualized DR and communicate the benefits of legacy-free disaster recovery. If
business leaders understand the true value of virtualized DR, you should have
success funding the project properly to realize the full benefits. A good rule
of thumb is to shoot for the plan that can create the lowest TCO (total cost of
ownership) over the next 3 to 5 years.

Executive Champion
Virtualization can be a complex topic for business leaders to understand.
Throwing DR planning on top of that can sometimes put non-technical leadership
into a corner they are uncomfortable with. To make sure you get the DR plan
your company needs, you'll need to understand the concerns and realities of
the business, and be able to clearly communicate the solution's benefits to
the company. If you are dreading these conversations you should consider
identifying an executive champion to get involved. This champion is usually an
executive familiar with IT but accustomed to planning with other executives and
speaking at a technical level they can understand. For companies without formal
technology executive positions like a chief information officer (CIO), an executive
champion dedicated to DR planning project can be a critical component.

Understand Application Dependencies
It’s crucial to understand dependencies of core applications when creating your
DR plan. Does an application depend on an external database on another VM?
What restore order is needed to test the application? And even today, we still
need to be concerned about what servers are still physical. These dependencies
are critical to catalog and plan for. No matter how well you protect the critical
VMs, if you forget the weakest link in the dependency chain, you might as well
have not protected any systems.

Active Directory, DNS and DHCP
Everyone has some critical applications that are core to the organization’s success,
and maybe people look to protect these applications first. This is a mistake that
can be avoided but continuing to follow the change of dependencies down the
lowest level. Assuming you have basic physical facilities and network access
accounted for in the DR plan, you need to make sure that core infrastructure
services are next on the plan. Like buying a car without wheels, restoring your
critical applications without these core infrastructure services will have you going
nowhere fast.

Core Infrastructure Services Needed for DR
   •	 IP address assignment (DHCP, etc.)—Local to each site and required for
      any communication on the network
   •	 DNS—Ensures that servers and PCs understand how to reach each other
      as well as Internet resources
   •	 Active Directory—Provides directory service to secure access to recovered
      systems

These services can be provided in a number of ways, but in the majority of small
business and mid-sized companies, we are talking about Microsoft Windows
Server VMs running Active Directory. Before Active Directory servers providing


                                                                                  6
VMware Disaster Recovery Planning: Essential Checklist



DHCP and DNS can be recovered, you need to ensure you have a strategy in
place to guarantee their recovery. If Active Directory servers are restored
incorrectly, you will waste precious hours conducting manual recovery steps to
restore function to this critical service. Ensuring a successful trouble-free restore
actually starts with a VM backup and replication tool that fully supports VSS
(Volume Shadow Copy Services) for both backups and restore. Veeam Backup 
Replication has provided this functionality since its first release. This VSS-aware
technology is the key layer of defense for situations in which you are unable to
replicate Active Directory to your disaster recovery facility. Example scenarios
include single site businesses without the budget for a DR site, or businesses
that choose to only maintain DR contracts with cloud providers and don’t want
to maintain active VMs that incur monthly fees.

Mission Critical Applications
Mission critical applications are the lifeblood of the company and consist of
stateless application server VMs as well as VMs containing persistent data like
databases or file system objects. With traditional legacy backups this can be
a terrible chore to document and remain current on all the specific files and
folders inside a VM that needs to be backed up, especially when application
upgrades may create new files and folders not included in the original backup
configuration. Focusing on entire VMs for a virtualized DR plan avoids focus
on the micro-management of the data protection, but rather on identifying the
higher level service components that need to be protected and restored.

Similar to the Active Directory backups mentioned earlier, if your mission critical
database is running SQL Server, you need to leverage VSS-aware products to
ensure application consistency is maintained during backup and replication.
Without this key technology, you will be left with crash-consistent databases
which will slow your recovery time after a disaster or during disaster exercises.
Microsoft SQL Server provides what’s called a VSS writer with its products, and
is one of the key pieces that Veeam can leverage with its own advanced VSS
requestor technology to ensure application-consistent backups. However, if you
are not running a database or OS that supports VSS you will have to take other
precautions. In the non-windows world, there can be various ways to ensure
database and application consistency during backup and replication windows.
You will need to identify these non-VSS enabled Databases and work with good
database administrators (DBAs) that understand the application requirements so
you can create a backup and replication method that can guarantee application
consistency. This may require pre- and post-scripts to be developed, purchased
or borrowed from the community or a vendor. These scripts can help guarantee
recovery consistency by shutting down the database service and freezing I/O on
the mission critical VM until Veeam can initiate the VM snapshot.

Stateless Application Servers
Not all servers contain persistent data, but all servers have a rebuild time. This can
be as simple as an automated deployment or a large effort involving significant
time and labor costs. These stateless application servers can be important servers
to protect, but they will not be protected in the same way as busier servers
with critical business data being creating daily. These servers can be protected
less frequently and triggered only during critical periods containing change. For
instance, prior to application upgrades or major software changes, you could
initiate a whole-VM backup and take small, quick incremental backups for a


                                                                                    7
VMware Disaster Recovery Planning: Essential Checklist



period of time to ensure you have a good known state to restore to. Then shortly
after the software change has been determined to be successful, you would
then want to take another series of full and incremental backups to provide a
good known state of the VM to restore back to if disaster occurs after the VM
change. Once you have proven you have good backups of these stateless VMs,
the schedule can be relaxed to save bandwidth and I/O. As long as you continue
to test restores of the entire application stack, along with its dependent data tier,
this can be an option for certain DR requirements.

Protect Your Deployment Systems
Some businesses choose to invest heavily into their ability to quickly re-install
application stacks on stateless VMs rather then protecting more data than is
technically needed. This can be a great strategy for scale-out workloads like
Terminal Server-based application servers, java application or web servers. In
these situations there is a large ROI (return on investment) from automating
the provisioning of complex server configurations and utilizing it often for
upgrades, server refreshes or scale out operations. This doesn’t mean you’re
off the hook, though. You'll need to follow the dependencies and identify the
systems responsible for re-deploying these stateless VMs to make sure that
they are protected and available in the DR site. This exercise will raise some
interesting questions about what should and should not be re-deployed as
part of a disaster, ultimately bringing into the question of the value of end-to-
end provisioning systems. In short, end-to-end provisioning strategies should
also include re-deployed tested whole-VM images as well as whole application
stacks. Your ultimate decision will just come down to numbers—how many VMs
are based on a common configuration and how quickly they need to be restored
in the event of the disaster.


Automate VMware Environment Data
Collection
VM inventory automation can help quickly and accurately collect information
on the virtual environment that’s invaluable to designing your DR plan. Whether
you have 25 VMs or 2,500, automating the collection of VM information can
jumpstart you on the way to accurately designing your DR plan. There are a
multitude of tools available to assist with this data collection task. Since we’re
planning for a virtualized DR plan, I’m a big fan of leveraging virtualization
management software from Veeam to help ease this task.

Veeam Reporter
Veeam Reporter is a great tool that gives you the insight into your environment
very quickly. There is both a free version and full version of Veeam Reporter.
Both can be invaluable in quickly collecting inventory information from existing
VMware environments. This information helps document your primary virtual
datacenter, and can be a guide for setting up the disaster recovery site. Output
from this tool include spreadsheets, Word documents and even Visio diagrams
of your VMs, ESX(i) hosts, VMware datastores and networks. Veeam Reporter can
grab a lot of data in just a few minutes.




                                                                                   8
VMware Disaster Recovery Planning: Essential Checklist




Veeam Monitor
Whether you are looking to build out the bare minimum DR infrastructure or you
are looking to determine at what point your DR solution is just getting gaudy,
you'll need good statistics on current resource utilization to properly size your
DR infrastructure. Veeam Monitor can be used to assist you with this resource
utilization collection. Again, there is a free version, but the full version is the
way to go if you would like to continue charting virtual infrastructure utilization
after the planning phase. When measuring virtual infrastructure utilization, we
are trying to capture a few key areas that will determine the ultimate cost of the
solution. CPU and memory utilization is important for sizing the servers required
for the recovery site. Here we’ll focus on CPU GHz used on average, and GB
memory consumed.

Storage Consumption with Veeam Backup  Replication
Storage requirements can be complex to discover. Although Veeam Monitor can
report on how much storage you are using today, it’s not operationally realized
for a virtualized DR plan. This means it doesn’t give you an easy way to estimate
your storage requirements for backup and replication of whole VMs. To accurately
assess storage needs you should consider using Veeam Backup  Replication
and conduct an actual proof-of-concept (POC) of the software. This will allow
you to learn how the product will work in your environment but also to give you
real-world values for backup storage needs. Everyone can determine the cost to
store full backups since it is just a multiplier of the original disk, but incremental
replication passes can be tricky. By running Veeam Backup  Replication for a
few days on actual workloads, you’ll accurately record the real-world values for
the daily change rate as well as gain statistics required to size your DR storage
systems. This daily change rate of the VM data will be critical in determining
future replication bandwidth requirements as well. So, with a simple POC of your
possible DR solution, you’ll be able to gather the statistics needed to properly
size two of your most expensive DR resources: storage and network bandwidth.




                                                                                    9
VMware Disaster Recovery Planning: Essential Checklist



Virtualize the Stragglers
If you still have physical servers, it’s time to make the switch. The benefits of
virtualized DR are well known and have been written about and practiced for
more than 5 years. No matter how good your DR solution for physical servers is,
it can’t come close to approaching the capabilities and cost of a virtualized DR.
But many workloads have avoided migrating to virtual for one reason or another,
which throws a wrench in to the DR planning machinery.

VMware Is Best DR Platform for Business Critical Workloads
You probably have a large portion of your environment virtualized with VMware,
but it’s likely that you have some business critical systems that remain on physical
systems because of their importance. Unfortunately, placing your business
critical systems on physical servers because they’re important is a mistake. If they
were that critical to your business, don’t you think that providing the ultimate
DR solution for them would be your organization’s starting point? These critical
systems should be virtualized to experience the full benefits of virtualized DR,
but not every application owner and DBA fully understands our virtualized DR
zealotry. You'll need to communicate the benefits inherent to today’s virtualized
DR to these application owners to win them over.

Virtualized DR Benefits
   •	 Snapshots—Be able to test critical patches and roll back if failure
      occurs
   •	 Restore entire server image (operating system [OS], application, data)
      to any hardware without messing with drivers
   •	 Refresh hardware with zero downtime
   •	 Restores can be automated and tested often
   •	 Files and other application items can be restored from VM backup
      images
   •	 VSS integration can ensure application consistency

VMs Performance Is No Longer a Barrier
Stubborn DBAs and critical-application owners may love to take you up on
DR capabilities alone, but they still have one trump card in their hand: VM
performance concerns. Five years ago, they might be justified in playing that
trump card. But with advances in virtualization software and hardware purposely
built for virtualization, these concerns are no longer warranted.
   •	 VMs can now scale up to 8 processors with 255 GB of RAM
   •	 VMs are capable of providing north of 300,000 IOPS when configured with
      a powerful enough backend storage system
   •	 10 GB networking erases concerns of VMs being starved of bandwidth by
      other VMs
   •	 Next vSphere version due out in 2011 will likely increase these limits more

Yes, VMs can scale larger than ever before, but without proper VMware capacity
planning practices, the benefits are negated. Planners still need to ensure they



                                                                                 10
VMware Disaster Recovery Planning: Essential Checklist



have the right consolidation ratios given the virtualized workloads and underlying
hardware resources. Having the tools to properly plan these consolidation
ratios, monitor utilization and give application owners relevant virtual hardware
performance statistics is critical. Tools like Veeam Monitor can provide the
performance view at the hypervisor level and provide OS level statistics in a
single view. Having the right plan and the right visibility into performance will
help gain trust and drive more use of virtualization where you need it most.

The Singular Option: 1 VM Per Server
All the management tools and virtualization know-how may still not be enough
gain permission to virtualize critical servers. Many times these mission critical
workloads have seen duty on non-x86 server platforms in the past, such as an
AS/400 or a proprietary RISC-based platform. These options were not cheap and
many times more expensive than a physical x86 server, so they are not easily
defeated by server consolidation benefits. With today’s powerful virtualization
enabled hardware and VMware software to provide the DR platform, you have a
singular option available to meet the performance and DR requirements of the
critical workload. That means dedicating a single host server to a critical VM.
Who says just because you are running VMware on your servers that you have
to maintain hero consolidation ratios? Putting performance (and egos) first and
not being afraid to consider limited use of 1:1 consolidation ratios, will help you
win over the stodgiest application owner. Over time, you may be able to win their
trust to allow higher consolidation ratios as long as performance requirements
are met. The singular option is a little of both, but when compared to the lack of
DR features for physical servers or the cost of the proprietary past, it can make
good sense.

On-Demand Sandbox Testing
Once virtualized, another unique benefit you can offer owners of business critical
applications is the ability to troubleshoot on mirror image systems in real time
without disrupting the production server image. How is this possible? Veeam
Backup  Replication offers an On-Demand Sandbox functionality. . This sandbox
functionality allows you to boot VMs directly from an NFS server presented by the
Veeam backup host, without requiring a time-consuming restore or provisioning
extra storage to the vSphere environment. This capability allows problems to
quickly be resolved since administrators will have exact copies of productions
systems to test with, restart services or try fixes without the fear of disrupting
operations on the live systems. This enables the system administrator's version
of the Hippocratic Oath so administrators “do no harm” to production systems in
the process of fixing them. This is no replacement for good system deployment
capabilities, but there are plenty of instances where, due to the number of systems
deployed, it doesn’t make sense to spend time automating the deployment. In
this case, having the entire VM backed up for redeployment is a big benefit for
developers.


Analyze Resource Requirements
It should go without saying, but DR planning is about preparing for the loss of
your primary datacenter. This means you need to size and budget for a recovery
site capable of meeting your requirements in a disaster scenario. During the
assessment phase of our DR planning, automating the collection of some


                                                                                11
VMware Disaster Recovery Planning: Essential Checklist



key virtual infrastructure inventory as well as resource utilization statistics is
recommended. It’s now time to use that information to properly size your DR
solution.

Compute
It's best to start with compute statistics, that is, how much CPU and memory are
utilized. If you're planning to restore every single server and maintain identical
capacity, this exercise is easy and you'll duplicate your production environment
at the DR facility. In more budget-minded organizations, you're going to analyze
the statistics of production workloads and identify only the critical workloads that
need to be running in order to establish the estimated DR infrastructure required
in a disaster. These utilization statistics translate into CPU sockets required.

Storage
When analyzing the storage requirements, we want to make sure that we
have enough raw storage space to store what is necessary. But we also want
to know what kind of performance characteristics are required to drive your
primary workloads. For storage space requirements you will start with the total
gigabytes of all the VMs that you plan to recover to the DR site. Add to that,
the amount of full backups or replicas you'll want to keep and the amount of
daily incremental backups. Generally speaking, DR storage is based on the VM's
configured memory and storage allocation, so calculations could be derived
from the statistics gathered with Veeam Reporter.

In addition to the raw space, it's important to understand the performance
required of your storage systems. This is usually measured as IOPS and storage
bandwidth. These two statistics describe how active your VM storage is, and
whether you can get by with SATA drives, SAS drives, or whether you'd be a good
candidate for an auto-tiered storage system with enterprise flash or SSDs for tier
0, SAS for tier 1 and SATA for tier 2. Many people make the mistake of buying
large capacity SATA for DR because they can save on storage purchase costs.
However, when it comes time to rely on that storage in a disaster, the availability
of their systems is in jeopardy due to performance. It's understandable to want
to save money on your DR, but for this size of an investment, you need to make
sure you're not shooting yourself in the foot by getting too risky. Analyze the
statistics and budget accordingly.

Network
We talked about calculating daily change rate of data earlier. If you decide to
use replication over a secured VPN connection over the Internet or leased WAN
circuit, you'll want to know how much data will need to be moved across the
network in a single day or replication window. This will help you forecast the size
of Internet bandwidth required to be successful and if you need to upgrade your
WAN circuits. If your options for Internet bandwidth are limited, this analysis will
be crucial to understand whether you will be a good candidate for replication or
whether whole-VM backups to tape-backed disk archives is a better option for
you.

WAN Acceleration Need
In analyzing your network connectivity, it's critical that you understand your
bandwidth, the latency between your primary site and DR site, and the reliability


                                                                                 12
VMware Disaster Recovery Planning: Essential Checklist



of the connection. If you have high latency and packet loss connections, you
may not be able to meet your backup windows, and consequently, suffer lower
RPOs. Products like HyperIP from Netex offer WAN acceleration technology that
is purpose-built for accelerating large data transfers over packet loss and high
latency network links. If you are a Veeam customer, they even offer a 1-year
free trial version of HyperIP to allow you to thoroughly kick the tires before
purchasing.


Design for Easiest Restore
It is imperative that a good DR plan design for the easiest restore possible. In a
disaster situation, there can be a lot of confusion, different environments, and
possibly a different or missing workforce. A disaster is not the time to have many
complex, manual steps to follow while under the stress knowing your business'
ability to pay your next paycheck may hang in the balance. Simplicity is king in
a disaster situation. You can't count on having your best DR expert available to
coordinate the recovery. You should plan for other personnel to be coordinating
the recovery while you or your DR expert is stuck on a Caribbean island with the
cell phone turned off. Being successful in this situation will require your skeleton
DR staff to have plenty of DR exercises under their belt and have the simplest
restore procedures possible.


 VM Recovery Steps Comparison
 Legacy Recovery                                  Whole-VM Recovery
 Method                                 OR        with Veeam
 1.	 Provision empty VM                           1.	 Restore whole-VM
 2.	 Reinstall a fresh system at                  2.	 Power-on VM that was pre-
     the DR site                                      verified with SureBackup
 3.	 Patch the OS
 4.	 Install application binaries                 Note: Replication would be a
     and other dependencies                       single step to power on the VM.
 5.	 Install backup agent and
     then proceed with restore of
     unverified application data
 6.	 Configure application to
     work with recovered data
 7.	 VM is ready to be restarted
     and application verified for
     first time

Don’t Reinvent the Wheel, Restore the Whole VM
In a VMware DR plan, you want to utilize the most powerful features of VMs:
encapsulation and hardware independence. VMs are just a group of files and
can be copied to other ESX(i) servers (regardless of hardware vendor) and can be
powered on and returned to service, sometimes, without any further modification.
For this reason, whole-VM protection methods are superior to legacy methods
that rely on multiple manual steps to create a workload from start to finish. From
the comparison chart below it's pretty easy to see why whole-VM recovery is
preferred.


                                                                                 13
VMware Disaster Recovery Planning: Essential Checklist



Using legacy protection measures on virtualized workloads introduces complexity,
cost and risk to into your DR plan that your company can’t afford. By restoring
the whole VM you drastically cut the number of steps required and you open
the door to be able to test and verify the recovery of the VM prior to needing it.

Start with Replication
There are two general methods to accomplish whole-VM recovery: VM backup
and VM replication. The first requires you to backup the entire VM to some
external storage media or a replicated file system. Then when recovery is required,
restore the VM to the recovery site ESX(i) servers through a simple file copy.
Veeam Backup can make this process slightly quicker in that it offers instant-on
features allowing you to present an NFS export to the ESX(i) server, and boot a
VM directly from its backup file. Eventually you would need to perform a Storage
vMotion of the VM to primary storage or do a full cold restore of the VM from a
backup media/file system to the recovery VMware environment.

The other recovery method is to replicate the entire VM to the recovery site
ESX(i) servers so that the replica VM is already pre-staged and ready-to-boot. To
recover the VM, you power it on. As simple as VM backup is, one-step recovery
with VM replication is very hard to beat and it is almost impossible to provide
better RTO unless you call active-active geo clustering a recovery technique.”
When designing for easiest restore, VM replication has to be on the top of your
list for tools to consider.


Decide on Infrastructure Configuration
After all the interviews, data collection and analysis, you'll eventually have to chart
a direction and make some decisions. You'll have to decide on a final configuration
for hardware, software, off-site data transport method, and recovery processes.
There is no one right way to do this but armed with business requirements for
recovery, application dependencies, and your budget guidelines, you should
have enough information to start to make some decisions

Servers
Any x86 server hardware will do here, but the question is more about what
kind of capacity do you require in a disaster and what's the most cost effective
way to meet that need at the DR site? Those 5-year-old 2U rackmount servers
with 4 total processor cores and 16GB of RAM might do okay in a pinch for a
small portion of your DR environment, but only if you don't recover the whole
environment. Although those servers might be free, they don't look so good when
you're paying for rack space and power for dozens of servers at a co-location
facility. It may be cost advantageous to purchase new servers that have 10 times
the capacity which can reduce DR licensing costs for Veeam and VMware while
cutting your physical space and power requirements by a factor of 10. Whatever
your decision, make sure you provide for adequate capacity based on real world
measurements from your production VMware environment and guided by the
Business Impact Assessment (BIA).

Storage
If you need vMotion and High Availability at the DR site, you'll need to invest in
shared storage to go with the VMware ESX(i) servers that you'll be replicating to
or restoring VM backups to. Choosing NAS, iSCSI and Fiber Channel are all good

                                                                                    14
VMware Disaster Recovery Planning: Essential Checklist



decisions, and most are valid options. If you are a small business or a small remote
office, shared storage for VMware may not always be possible and you may be
required to use local storage contained within the recovery servers. Although
these setups aren't as efficient to manage in a production environment, they can
be good enough in a disaster to allow your business to provide revolutionary
DR capability at a bargain price. In configurations with locally attached storage,
you'll be happy to know that Veeam Backup  Replication can support that
option as well since it can write to any VMware datastore visible to ESX(i) server.

Network
We talked earlier about network considerations. Basically, there is enough
network bandwidth or there is not. There either is high latency or there is not. If
you have the budget, make the investment in high bandwidth links between your
recovery site and your primary datacenter. This can allow the most reliability and
lowest operational cost for your backups and replication since no error-prone
manual or physical methods are required to me move data to recovery site.

Whether it is due to budget-related or geography-related limitations, not
everyone has the network bandwidth available to replicate critical assets. That's
why the old adage remains true, Never underestimate the bandwidth of a van
full of tapes driving down the highway. Your network realities may dictate a
whole VM backup to disk or tape that is then trucked off-site for safe keeping or
for test restoration at the DR site. In these situations you will be sacrificing the
ultimate RTO from the start, so it's not as important to have all servers racked,
stacked, powered and ready to go. You might even consider alternate means for
provisioning server resources in these scenarios.

DR in the Cloud?
In the case where replication is not an option and you have VM backup images
that can be restored to any ESX(i) servers in the world, why not restore to the
cloud? There are countless VMware hosting providers available today that can
rent you resource pools or whole VMware environments. Rather than investing
in expensive, duplicate datacenter locations that will only be used in the unlikely
event that an actual disaster occurs, you can instead bank that money and only
pay a small portion in the event a disaster happens or in the event you'd like to
test your recovery. If you do decide to move forward with restoring to a VMware
hosting provider, you may need to do some advance planning on the contract
side to help speed your recovery if needed. Although we're getting closer to the
dream world that allows you to whip out the company credit card and spin up a
DR site in minutes, it's more likely that you'll want to sign a contract in advance
in order to get some guarantee that the resources you'll require will be available
should you declare a disaster. Of course this insurance will cost you, but it will be
much less than if you purchased the resources full time or if you stood up your
own DR site.


Test-Driven DR Plan
In the software development world, a popular software development process is
test-driven development (TDD). In TDD, developers first create automated unit
tests that will only pass successfully if the new piece of code under development
fulfills all criteria. By writing the test first and then developing the code, quality is


                                                                                      15
VMware Disaster Recovery Planning: Essential Checklist



improved since code can’t be released until the unit tests pass successfully. This
process has proven very successful for software developers, and a derivation of
the process can now be applied to virtualized DR. This derivation can be called
test-driven DR and it turns traditional DR planning on its head by planning for
the restore and verification of the restore before you plan to do your first backup.

Design with Testing in Mind
It takes more than petabytes of shiny deduplicated, compressed backups to save
the day in a disaster situation. If you can't restore successfully and quickly from
those fancy backups, then what was the point? With today's VMware virtualized
systems, there is no longer an excuse to not test your recovery as often as
possible. If replica VMs are ready to boot in a test recovery environment, you are
just a PowerCLI script or web service call away from creating custom workflows
to orchestrate the recovery of your protected VMs. By building upon what you
learned with application dependencies and target RTOs, you can create custom
workflows that will bring up your protected VMs in the order required to test
your ability to restore. And since we're talking about virtualized environments,
you can easily adjust the VMware networking with a simple web service call to
ensure that recovered VMs are placed in an isolated network that you prepared
in advance. Your functionality is only limited by your time and scripting ability.
However, not everyone is a programmer or has the time to create these workflows
and verification scripts. Veeam SureBackup is the solution to help programmers
and non-programmers create a foundation for their test-driven DR plan.

SureBackup Recovery Verification Is Test-Driven DR
With the SureBackup functionality in Veeam Backup  Replication, you can verify
the recoverability of every VM backup every time. This recovery verification of
individual VMs is the essence of test-driven DR planning since you are designing
tests that will fail until you properly design and execute your automated backup
and restore system properly. As in TDD, if a SureBackup verification test fails, you
will reconfigure your recovery or backup until the verification passes all tests.
Since it’s all virtual and able to automatically run within an isolated network, you
can run these DR tests repeatedly until you find the hidden dependency, incorrect
IP addressing, or out-of-order recovery step. This cycle of DR plan refinement can
verify your entire DR plan within a few short days for small DR plans to weeks for
more complex DR plans.

Test-Driven DR Enables Continuous Testing
With traditional DR exercises leveraging legacy DR solutions, businesses are lucky
if they have the time and budget to test their DR plan annually, let alone resolve
all outstanding issues with the recovery. The technology is available to make
test-driven DR planning a continuous process for your virtualized environment.
You should work toward a goal of near-daily automated recovery verifications
to bulletproof your DR plan. Limiting yourself to annual or quarterly DR tests is
a relic of DR planning past that no longer applies. When creating your VMware
DR plan, be sure to not only eliminate legacy technologies of the past, but to
scrap the legacy processes as well. Freeing your mind of yesterday’s DR baggage
will help you embrace the possibilities of virtualized DR and fully experience its
benefits for your business.




                                                                                 16
VMware Disaster Recovery Planning: Essential Checklist


  About the Author
                       Sean is a ten-year IT veteran with a background in
                       software development, database administration, security
                       coordination, and IT management. The last five years, he has
                       focused on developing his expertise in VMware virtualization
                       and surrounding technologies. He has kept current VMware
                       Certified Professional (VCP) status on VI 2.5, VI 3.5 and
                       vSphere 4. In 2009 Sean was awarded VMware vExpert
                       status, one of 300 globally to receive the award recognizing
                       their contribution to the virtualization community. Since
   Sean Clark          then, Sean has been an active member of the virtualization
VMware vExpert         community as a notorious Twitter contributor with the
                       handle of @vSeanClark, as co-instigator of the popular
                       vmunderground.com community party at VMworld, and as
                       a random blogger at http://seanclark.us. He has provided
                       guidance on virtualization strategy to businesses of all
                       sizes and from all industries, and is currently a virtualization
                       consultant with TEKsystems working on a long-term cloud
                       computing project for a Fortune 500 company.




  About Veeam Software
  Veeam Software, an Elite VMware Technology Alliance Partner, develops innovative
  software to manage VMware vSphere®. Veeam vPower™ provides advanced
  Virtualization-Powered Data Protection™ and is the underlying technology in
  Veeam Backup  Replication™, the #1 virtualization backup solution. Veeam
  nworks extends enterprise monitoring to VMware and includes the nworks
  Management Pack™ for VMware management in Microsoft System Center
  and the nworks Smart Plug-in™ for VMware management in HP Operations
  Manager. Veeam ONE™ provides a single solution to optimize the performance,
  configuration and utilization of VMware environments and includes: Veeam
  Monitor™ for easy-to-deploy VMware monitoring; Veeam Reporter™ for
  VMware capacity planning, change management, and reporting and chargeback;
  and Veeam Business View™ for VMware business service management and
  categorization. Learn more about Veeam Software by visiting www.veeam.com.




                                                                                    17
2010
                                                           Products
                                                           of the Year




                                                           GOLD




                                                                                     VMware
                                                                                     Backup

    100% Reliability               Best RTOs                             Best RPOs

     SureBackup        TM
                                 InstantRestore     TM
                                                                     SmartCDP         TM




                               vPower          TM



              Virtualization-Powered Data Protection                      TM   5 Patents
                                                                                 Pending!



                             VMware vSphere




5   Patents
    Pending!           NEW Veeam Backup  Replication™

vPower enables these game-changing capabilities in
Veeam Backup  Replication v5:
         Instant VM Recovery—restore an entire virtual machine IN MINUTES
          by running it directly from a backup file
         U-AIR™ (Universal Application-Item Recovery)—recover individual
          objects from ANY application, on ANY OS
         SureBackup™ Recovery Verification—automatically verify the
          recoverability of EVERY backup, of EVERY virtual machine, EVERY time




 To learn more, visit www.veeam.com/vPower
VMware Disaster Recovery Planning Essential Checklist
DR planning in a VMware environment requires old-fashioned DR planning fundamentals but also requires
fully leveraging virtualization’s unique characteristics. This checklist of 10 proven DR planning activities
provides you a jumpstart towards an award-winning VMware DR plan.

       Conduct a Business Impact Analysis (BIA).
       A BIA helps you identify critical business systems, their IT and human dependencies, and an estimated
       disruption impact to your business. You can then determine which applications are most important.

       Know your recovery point objective (RPO) and your recovery time objective (RTO).
       Develop an intimate understanding of how your business runs and catalog the key resources and processes
       necessary to enable revenue creation. Translating the findings from the BIA into RTO/RPO requirements for
       each application, helps you focus your resources where they are needed most.

       Understand your budget.
       Virtualized DR is much less expensive than traditional physical DR, but it is still an additional cost on top
       of your already sizable investment in virtualization software, supported server hardware and new storage
       systems. Avoid the expense of maintaining both legacy and virtualization-aware backup systems by migrating
       to all virtual DR.

       Understand application dependencies.
       Most applications have dependencies external to the virtual machine (VM) that it runs on. In a disaster, it’s
       critical to have cataloged these dependencies because you will have to recover each one to restore end-
       to-end functioning for that application. Start at the base infrastructure services like DHCP, DNS and Active
       Directory. But don’t forget to account for file shares, databases or other non-virtualized servers recovered
       through legacy means.

       Automate VMware environment data collection.
       VMware inventory automation can quickly and accurately collect information on the virtual environment
       that’s invaluable to designing your DR plan. Tools from Veeam can help ease the task. Veeam Reporter can
       catalog the configuration of the VMware environment, even providing Visio diagrams to reference. Veeam
       Monitor can provide the performance statistics you need to size your DR infrastructure. Plus, a Veeam Backup
        Replication proof of concept (POC) is a good way to learn what your daily data change rate is so you can
       appropriately size your network connections to the recovery location.

       Virtualize stragglers.
       If you still have physical servers, it’s time to make the switch. The benefits of virtualized DR are well known
       and have been written about and practiced for more than 5 years. No matter how good your DR solution
       for physical servers is, it can’t come close to the capabilities and efficiencies of virtualized DR. Virtualize your
       remaining physical servers to achieve the most benefit from your DR Plan.

       Analyze resource requirements.
       Using the data collected in the assessment phase of your DR plan is invaluable in sizing the DR site and
       creating your DR budget for servers and storage. The largest limiting factor to the ideal DR plan for VMware
       is the bandwidth required to replicate all necessary VMs. Consider products, such as HyperIP from Netex,
       that offer WAN acceleration technology purpose-built for accelerating large data transfers over high packet
       loss and high-latency network links. This can allow for better use of available bandwidth without breaking
       your budget.

       Design for easiest restore.
       Simplicity is king in a DR situation. Rather than reinvent the wheel by reinstalling operating systems,
       applications and restoring individual files, you should restore the entire application as a VM to minimize
       restore time. Replicating the VM with Veeam Backup  Replication can provide the lowest RTO possible since
       VMs only need to be powered on to restore service.

       Decide on infrastructure configuration.
       In today’s cost-conscious IT environment, it’s good to know there are options for your recovery site
       configuration. Although you can choose to self-host DR options in your own facilities, you can also take
       advantage of VMware service providers that could provide your DR infrastructure as an on-demand cloud
       service.

       Test-drive your DR plan.
       Setting up a DR plan for VMware environments is not a one time activity. You need to ensure that you
       test, test and test. Manual tests are good, but since you’re working with VMware technology, there’s no
       reason testing can’t be automated and run as often as daily if needed. Using Veeam Backup  Replication’s
       SureBackup automated backup verification feature is a great way to do this.

More Related Content

What's hot

Disaster Recovery Plan for IT
Disaster Recovery Plan for ITDisaster Recovery Plan for IT
Disaster Recovery Plan for IThhuihhui
 
IT-Centric Disaster Recovery & Business Continuity
IT-Centric Disaster Recovery & Business ContinuityIT-Centric Disaster Recovery & Business Continuity
IT-Centric Disaster Recovery & Business ContinuitySteve Susina
 
Disaster Recovery Planning
Disaster Recovery PlanningDisaster Recovery Planning
Disaster Recovery PlanningJohn Wilson
 
Plano de Continuidade de dos Serviços de TI
Plano de Continuidade de dos Serviços de TIPlano de Continuidade de dos Serviços de TI
Plano de Continuidade de dos Serviços de TICompanyWeb
 
Business continuity planning and disaster recovery
Business continuity planning and disaster recoveryBusiness continuity planning and disaster recovery
Business continuity planning and disaster recoverymadunix
 
Membangun Data Recovery Center / Disaster Recovery Center
Membangun Data Recovery Center / Disaster Recovery CenterMembangun Data Recovery Center / Disaster Recovery Center
Membangun Data Recovery Center / Disaster Recovery CenterFanky Christian
 
Business Continuity and Disaster Recovery Strategy
Business Continuity and Disaster Recovery Strategy Business Continuity and Disaster Recovery Strategy
Business Continuity and Disaster Recovery Strategy Chandrak Trivedi
 
Best Practices in Disaster Recovery Planning and Testing
Best Practices in Disaster Recovery Planning and TestingBest Practices in Disaster Recovery Planning and Testing
Best Practices in Disaster Recovery Planning and TestingAxcient
 
Business Continuity & Disaster Recovery
Business Continuity & Disaster RecoveryBusiness Continuity & Disaster Recovery
Business Continuity & Disaster RecoveryEC-Council
 
Business continuity planning
Business continuity planningBusiness continuity planning
Business continuity planningSandeep Kashyap
 
Business Continuity Planning
Business Continuity PlanningBusiness Continuity Planning
Business Continuity Planningalanlund
 
Business Continuity Planning Presentation Overview
Business Continuity Planning Presentation OverviewBusiness Continuity Planning Presentation Overview
Business Continuity Planning Presentation OverviewBob Winkler
 
How to write an IT DR plan
How to write an IT DR planHow to write an IT DR plan
How to write an IT DR planDatabarracks
 
Business continuity for SMEs
Business continuity for SMEsBusiness continuity for SMEs
Business continuity for SMEsreedgrace1
 
Information Technology Disaster Planning
Information Technology Disaster PlanningInformation Technology Disaster Planning
Information Technology Disaster Planningguest340570
 
Business continuity & Disaster recovery planing
Business continuity & Disaster recovery planingBusiness continuity & Disaster recovery planing
Business continuity & Disaster recovery planingHanaysha
 

What's hot (20)

Disaster Recovery Plan for IT
Disaster Recovery Plan for ITDisaster Recovery Plan for IT
Disaster Recovery Plan for IT
 
009.itsecurity bcp v1
009.itsecurity bcp v1009.itsecurity bcp v1
009.itsecurity bcp v1
 
IT-Centric Disaster Recovery & Business Continuity
IT-Centric Disaster Recovery & Business ContinuityIT-Centric Disaster Recovery & Business Continuity
IT-Centric Disaster Recovery & Business Continuity
 
Bcp drp
Bcp drpBcp drp
Bcp drp
 
Introduction to Business Continuity Management
Introduction to Business Continuity ManagementIntroduction to Business Continuity Management
Introduction to Business Continuity Management
 
Disaster Recovery Planning
Disaster Recovery PlanningDisaster Recovery Planning
Disaster Recovery Planning
 
Plano de Continuidade de dos Serviços de TI
Plano de Continuidade de dos Serviços de TIPlano de Continuidade de dos Serviços de TI
Plano de Continuidade de dos Serviços de TI
 
Business continuity planning and disaster recovery
Business continuity planning and disaster recoveryBusiness continuity planning and disaster recovery
Business continuity planning and disaster recovery
 
Membangun Data Recovery Center / Disaster Recovery Center
Membangun Data Recovery Center / Disaster Recovery CenterMembangun Data Recovery Center / Disaster Recovery Center
Membangun Data Recovery Center / Disaster Recovery Center
 
Business Continuity and Disaster Recovery Strategy
Business Continuity and Disaster Recovery Strategy Business Continuity and Disaster Recovery Strategy
Business Continuity and Disaster Recovery Strategy
 
CMDB - Use Cases
CMDB - Use CasesCMDB - Use Cases
CMDB - Use Cases
 
Best Practices in Disaster Recovery Planning and Testing
Best Practices in Disaster Recovery Planning and TestingBest Practices in Disaster Recovery Planning and Testing
Best Practices in Disaster Recovery Planning and Testing
 
Business Continuity & Disaster Recovery
Business Continuity & Disaster RecoveryBusiness Continuity & Disaster Recovery
Business Continuity & Disaster Recovery
 
Business continuity planning
Business continuity planningBusiness continuity planning
Business continuity planning
 
Business Continuity Planning
Business Continuity PlanningBusiness Continuity Planning
Business Continuity Planning
 
Business Continuity Planning Presentation Overview
Business Continuity Planning Presentation OverviewBusiness Continuity Planning Presentation Overview
Business Continuity Planning Presentation Overview
 
How to write an IT DR plan
How to write an IT DR planHow to write an IT DR plan
How to write an IT DR plan
 
Business continuity for SMEs
Business continuity for SMEsBusiness continuity for SMEs
Business continuity for SMEs
 
Information Technology Disaster Planning
Information Technology Disaster PlanningInformation Technology Disaster Planning
Information Technology Disaster Planning
 
Business continuity & Disaster recovery planing
Business continuity & Disaster recovery planingBusiness continuity & Disaster recovery planing
Business continuity & Disaster recovery planing
 

Similar to VMware Disaster Recovery Planning: Essential Checklist

V mware quick start guide to disaster recovery
V mware   quick start guide to disaster recoveryV mware   quick start guide to disaster recovery
V mware quick start guide to disaster recoveryVMware_EMEA
 
Achieving enterprise resiliency and corporate certification through the use o...
Achieving enterprise resiliency and corporate certification through the use o...Achieving enterprise resiliency and corporate certification through the use o...
Achieving enterprise resiliency and corporate certification through the use o...Thomas Bronack
 
Business Continuity Getting Started
Business Continuity Getting StartedBusiness Continuity Getting Started
Business Continuity Getting Startedmxp5714
 
Disaster recovery white_paper
Disaster recovery white_paperDisaster recovery white_paper
Disaster recovery white_paperCMR WORLD TECH
 
Can your business survive the next disaster?
Can your business survive the next disaster?Can your business survive the next disaster?
Can your business survive the next disaster?Ashish Patel
 
ProfitBricks-white-paper-Disaster-Recovery-US
ProfitBricks-white-paper-Disaster-Recovery-USProfitBricks-white-paper-Disaster-Recovery-US
ProfitBricks-white-paper-Disaster-Recovery-USMudia Akpobome
 
Disaster Recovery Deep Dive
Disaster Recovery Deep DiveDisaster Recovery Deep Dive
Disaster Recovery Deep DiveLiberteks
 
Disaster Recovery: Develop Efficient Critique for an Emergency
Disaster Recovery: Develop Efficient Critique for an EmergencyDisaster Recovery: Develop Efficient Critique for an Emergency
Disaster Recovery: Develop Efficient Critique for an Emergencysco813f8ko
 
Business Continuity for Mission Critical Applications
Business Continuity for Mission Critical ApplicationsBusiness Continuity for Mission Critical Applications
Business Continuity for Mission Critical ApplicationsDataCore Software
 
Building a Business Continuity Capability
Building a Business Continuity CapabilityBuilding a Business Continuity Capability
Building a Business Continuity CapabilityRod Davis
 
Kept up by Potential IT Disasters? Your Guide to Disaster Recovery as a Servi...
Kept up by Potential IT Disasters? Your Guide to Disaster Recovery as a Servi...Kept up by Potential IT Disasters? Your Guide to Disaster Recovery as a Servi...
Kept up by Potential IT Disasters? Your Guide to Disaster Recovery as a Servi...VAST
 
Business Continuation The Basics
Business Continuation   The BasicsBusiness Continuation   The Basics
Business Continuation The Basicsguest13df88e8
 
Disaster Recovery on AWS Cloud.pdf
Disaster Recovery on AWS Cloud.pdfDisaster Recovery on AWS Cloud.pdf
Disaster Recovery on AWS Cloud.pdfZen Bit Tech
 
Business Resiliency
Business ResiliencyBusiness Resiliency
Business ResiliencyRackspace
 
Server upgrade considerations for small and medium-sized businesses
Server upgrade considerations for small and medium-sized businessesServer upgrade considerations for small and medium-sized businesses
Server upgrade considerations for small and medium-sized businessesPrincipled Technologies
 
Disaster Recovery, Business Continuity, Backups, and High Av.docx
Disaster Recovery, Business Continuity, Backups, and High Av.docxDisaster Recovery, Business Continuity, Backups, and High Av.docx
Disaster Recovery, Business Continuity, Backups, and High Av.docxcuddietheresa
 
RUNNING HEADER Disaster Recovery Plan Information and Documentat.docx
RUNNING HEADER Disaster Recovery Plan Information and Documentat.docxRUNNING HEADER Disaster Recovery Plan Information and Documentat.docx
RUNNING HEADER Disaster Recovery Plan Information and Documentat.docxanhlodge
 
Business continuity presentation
Business continuity presentationBusiness continuity presentation
Business continuity presentationSteveKutzer
 
The Edge of Disaster Recovery - May Events Presentation FINAL
The Edge of Disaster Recovery - May Events Presentation FINALThe Edge of Disaster Recovery - May Events Presentation FINAL
The Edge of Disaster Recovery - May Events Presentation FINALJohn Baumgarten
 
Running head The REA Approach1The REA Approach8The REA Approa.docx
Running head The REA Approach1The REA Approach8The REA Approa.docxRunning head The REA Approach1The REA Approach8The REA Approa.docx
Running head The REA Approach1The REA Approach8The REA Approa.docxtodd521
 

Similar to VMware Disaster Recovery Planning: Essential Checklist (20)

V mware quick start guide to disaster recovery
V mware   quick start guide to disaster recoveryV mware   quick start guide to disaster recovery
V mware quick start guide to disaster recovery
 
Achieving enterprise resiliency and corporate certification through the use o...
Achieving enterprise resiliency and corporate certification through the use o...Achieving enterprise resiliency and corporate certification through the use o...
Achieving enterprise resiliency and corporate certification through the use o...
 
Business Continuity Getting Started
Business Continuity Getting StartedBusiness Continuity Getting Started
Business Continuity Getting Started
 
Disaster recovery white_paper
Disaster recovery white_paperDisaster recovery white_paper
Disaster recovery white_paper
 
Can your business survive the next disaster?
Can your business survive the next disaster?Can your business survive the next disaster?
Can your business survive the next disaster?
 
ProfitBricks-white-paper-Disaster-Recovery-US
ProfitBricks-white-paper-Disaster-Recovery-USProfitBricks-white-paper-Disaster-Recovery-US
ProfitBricks-white-paper-Disaster-Recovery-US
 
Disaster Recovery Deep Dive
Disaster Recovery Deep DiveDisaster Recovery Deep Dive
Disaster Recovery Deep Dive
 
Disaster Recovery: Develop Efficient Critique for an Emergency
Disaster Recovery: Develop Efficient Critique for an EmergencyDisaster Recovery: Develop Efficient Critique for an Emergency
Disaster Recovery: Develop Efficient Critique for an Emergency
 
Business Continuity for Mission Critical Applications
Business Continuity for Mission Critical ApplicationsBusiness Continuity for Mission Critical Applications
Business Continuity for Mission Critical Applications
 
Building a Business Continuity Capability
Building a Business Continuity CapabilityBuilding a Business Continuity Capability
Building a Business Continuity Capability
 
Kept up by Potential IT Disasters? Your Guide to Disaster Recovery as a Servi...
Kept up by Potential IT Disasters? Your Guide to Disaster Recovery as a Servi...Kept up by Potential IT Disasters? Your Guide to Disaster Recovery as a Servi...
Kept up by Potential IT Disasters? Your Guide to Disaster Recovery as a Servi...
 
Business Continuation The Basics
Business Continuation   The BasicsBusiness Continuation   The Basics
Business Continuation The Basics
 
Disaster Recovery on AWS Cloud.pdf
Disaster Recovery on AWS Cloud.pdfDisaster Recovery on AWS Cloud.pdf
Disaster Recovery on AWS Cloud.pdf
 
Business Resiliency
Business ResiliencyBusiness Resiliency
Business Resiliency
 
Server upgrade considerations for small and medium-sized businesses
Server upgrade considerations for small and medium-sized businessesServer upgrade considerations for small and medium-sized businesses
Server upgrade considerations for small and medium-sized businesses
 
Disaster Recovery, Business Continuity, Backups, and High Av.docx
Disaster Recovery, Business Continuity, Backups, and High Av.docxDisaster Recovery, Business Continuity, Backups, and High Av.docx
Disaster Recovery, Business Continuity, Backups, and High Av.docx
 
RUNNING HEADER Disaster Recovery Plan Information and Documentat.docx
RUNNING HEADER Disaster Recovery Plan Information and Documentat.docxRUNNING HEADER Disaster Recovery Plan Information and Documentat.docx
RUNNING HEADER Disaster Recovery Plan Information and Documentat.docx
 
Business continuity presentation
Business continuity presentationBusiness continuity presentation
Business continuity presentation
 
The Edge of Disaster Recovery - May Events Presentation FINAL
The Edge of Disaster Recovery - May Events Presentation FINALThe Edge of Disaster Recovery - May Events Presentation FINAL
The Edge of Disaster Recovery - May Events Presentation FINAL
 
Running head The REA Approach1The REA Approach8The REA Approa.docx
Running head The REA Approach1The REA Approach8The REA Approa.docxRunning head The REA Approach1The REA Approach8The REA Approa.docx
Running head The REA Approach1The REA Approach8The REA Approa.docx
 

More from Veeam Software

The Voice of the Customer - How to enable Availability for the Always-On Ente...
The Voice of the Customer - How to enable Availability for the Always-On Ente...The Voice of the Customer - How to enable Availability for the Always-On Ente...
The Voice of the Customer - How to enable Availability for the Always-On Ente...Veeam Software
 
Veeam Backup & Replication - What’s New in 6.5
Veeam Backup & Replication - What’s New in 6.5Veeam Backup & Replication - What’s New in 6.5
Veeam Backup & Replication - What’s New in 6.5Veeam Software
 
THE UNOFFICIAL OFFICIAL VCP6-DCV Study Guide
THE UNOFFICIAL OFFICIAL VCP6-DCV Study GuideTHE UNOFFICIAL OFFICIAL VCP6-DCV Study Guide
THE UNOFFICIAL OFFICIAL VCP6-DCV Study GuideVeeam Software
 
All you need to know about Microsoft Ignite 2016
All you need to know about Microsoft Ignite 2016All you need to know about Microsoft Ignite 2016
All you need to know about Microsoft Ignite 2016Veeam Software
 
Veeam Availability Report Summary 2016
Veeam Availability Report Summary 2016Veeam Availability Report Summary 2016
Veeam Availability Report Summary 2016Veeam Software
 
Integration with EMC VNX and VNXe hybrid storage arrays
Integration with EMC VNX and VNXe hybrid storage arraysIntegration with EMC VNX and VNXe hybrid storage arrays
Integration with EMC VNX and VNXe hybrid storage arraysVeeam Software
 
Always-On Business Demands
Always-On Business DemandsAlways-On Business Demands
Always-On Business DemandsVeeam Software
 
Veeam Backup & Replication v8 for Hyper-V
Veeam Backup & Replication v8 for Hyper-VVeeam Backup & Replication v8 for Hyper-V
Veeam Backup & Replication v8 for Hyper-VVeeam Software
 
47 restore scenarios from Veeam Backup & Replication v8
47 restore scenarios from Veeam Backup & Replication v847 restore scenarios from Veeam Backup & Replication v8
47 restore scenarios from Veeam Backup & Replication v8Veeam Software
 
Veeam Backup & Replication v8 for VMware — General Overview
Veeam Backup & Replication v8 for VMware — General OverviewVeeam Backup & Replication v8 for VMware — General Overview
Veeam Backup & Replication v8 for VMware — General OverviewVeeam Software
 
Managing your exchange architecture
Managing your exchange architectureManaging your exchange architecture
Managing your exchange architectureVeeam Software
 
Protecting Exchange with Veeam
Protecting Exchange with VeeamProtecting Exchange with Veeam
Protecting Exchange with VeeamVeeam Software
 
Defining availability for the modern data center
Defining availability for the modern data centerDefining availability for the modern data center
Defining availability for the modern data centerVeeam Software
 
Five questions for every Modern Data Center (Infographic)
Five questions for every Modern Data Center (Infographic)Five questions for every Modern Data Center (Infographic)
Five questions for every Modern Data Center (Infographic)Veeam Software
 
Tape and cloud strategies for VM backups
Tape and cloud strategies for VM backupsTape and cloud strategies for VM backups
Tape and cloud strategies for VM backupsVeeam Software
 
The Unofficial VCAP / VCP VMware Study Guide
The Unofficial VCAP / VCP VMware Study GuideThe Unofficial VCAP / VCP VMware Study Guide
The Unofficial VCAP / VCP VMware Study GuideVeeam Software
 
Microsoft System Center Data Protection Manager and Veeam Backup & Replicatio...
Microsoft System Center Data Protection Manager and Veeam Backup & Replicatio...Microsoft System Center Data Protection Manager and Veeam Backup & Replicatio...
Microsoft System Center Data Protection Manager and Veeam Backup & Replicatio...Veeam Software
 
Veeam Backup & Replication Tips and Tricks
Veeam Backup & Replication Tips and TricksVeeam Backup & Replication Tips and Tricks
Veeam Backup & Replication Tips and TricksVeeam Software
 
12 best practices for virtualizing active directory DCs
12 best practices for virtualizing active directory DCs12 best practices for virtualizing active directory DCs
12 best practices for virtualizing active directory DCsVeeam Software
 
Preparing for Server 2012 Hyper-V: Seven Questions to Ask Now
Preparing for Server 2012 Hyper-V: Seven Questions to Ask NowPreparing for Server 2012 Hyper-V: Seven Questions to Ask Now
Preparing for Server 2012 Hyper-V: Seven Questions to Ask NowVeeam Software
 

More from Veeam Software (20)

The Voice of the Customer - How to enable Availability for the Always-On Ente...
The Voice of the Customer - How to enable Availability for the Always-On Ente...The Voice of the Customer - How to enable Availability for the Always-On Ente...
The Voice of the Customer - How to enable Availability for the Always-On Ente...
 
Veeam Backup & Replication - What’s New in 6.5
Veeam Backup & Replication - What’s New in 6.5Veeam Backup & Replication - What’s New in 6.5
Veeam Backup & Replication - What’s New in 6.5
 
THE UNOFFICIAL OFFICIAL VCP6-DCV Study Guide
THE UNOFFICIAL OFFICIAL VCP6-DCV Study GuideTHE UNOFFICIAL OFFICIAL VCP6-DCV Study Guide
THE UNOFFICIAL OFFICIAL VCP6-DCV Study Guide
 
All you need to know about Microsoft Ignite 2016
All you need to know about Microsoft Ignite 2016All you need to know about Microsoft Ignite 2016
All you need to know about Microsoft Ignite 2016
 
Veeam Availability Report Summary 2016
Veeam Availability Report Summary 2016Veeam Availability Report Summary 2016
Veeam Availability Report Summary 2016
 
Integration with EMC VNX and VNXe hybrid storage arrays
Integration with EMC VNX and VNXe hybrid storage arraysIntegration with EMC VNX and VNXe hybrid storage arrays
Integration with EMC VNX and VNXe hybrid storage arrays
 
Always-On Business Demands
Always-On Business DemandsAlways-On Business Demands
Always-On Business Demands
 
Veeam Backup & Replication v8 for Hyper-V
Veeam Backup & Replication v8 for Hyper-VVeeam Backup & Replication v8 for Hyper-V
Veeam Backup & Replication v8 for Hyper-V
 
47 restore scenarios from Veeam Backup & Replication v8
47 restore scenarios from Veeam Backup & Replication v847 restore scenarios from Veeam Backup & Replication v8
47 restore scenarios from Veeam Backup & Replication v8
 
Veeam Backup & Replication v8 for VMware — General Overview
Veeam Backup & Replication v8 for VMware — General OverviewVeeam Backup & Replication v8 for VMware — General Overview
Veeam Backup & Replication v8 for VMware — General Overview
 
Managing your exchange architecture
Managing your exchange architectureManaging your exchange architecture
Managing your exchange architecture
 
Protecting Exchange with Veeam
Protecting Exchange with VeeamProtecting Exchange with Veeam
Protecting Exchange with Veeam
 
Defining availability for the modern data center
Defining availability for the modern data centerDefining availability for the modern data center
Defining availability for the modern data center
 
Five questions for every Modern Data Center (Infographic)
Five questions for every Modern Data Center (Infographic)Five questions for every Modern Data Center (Infographic)
Five questions for every Modern Data Center (Infographic)
 
Tape and cloud strategies for VM backups
Tape and cloud strategies for VM backupsTape and cloud strategies for VM backups
Tape and cloud strategies for VM backups
 
The Unofficial VCAP / VCP VMware Study Guide
The Unofficial VCAP / VCP VMware Study GuideThe Unofficial VCAP / VCP VMware Study Guide
The Unofficial VCAP / VCP VMware Study Guide
 
Microsoft System Center Data Protection Manager and Veeam Backup & Replicatio...
Microsoft System Center Data Protection Manager and Veeam Backup & Replicatio...Microsoft System Center Data Protection Manager and Veeam Backup & Replicatio...
Microsoft System Center Data Protection Manager and Veeam Backup & Replicatio...
 
Veeam Backup & Replication Tips and Tricks
Veeam Backup & Replication Tips and TricksVeeam Backup & Replication Tips and Tricks
Veeam Backup & Replication Tips and Tricks
 
12 best practices for virtualizing active directory DCs
12 best practices for virtualizing active directory DCs12 best practices for virtualizing active directory DCs
12 best practices for virtualizing active directory DCs
 
Preparing for Server 2012 Hyper-V: Seven Questions to Ask Now
Preparing for Server 2012 Hyper-V: Seven Questions to Ask NowPreparing for Server 2012 Hyper-V: Seven Questions to Ask Now
Preparing for Server 2012 Hyper-V: Seven Questions to Ask Now
 

Recently uploaded

Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 

Recently uploaded (20)

Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 

VMware Disaster Recovery Planning: Essential Checklist

  • 1. VMware Disaster Recovery Planning: Essential Checklist Sponsored by VMware Disaster Recovery Planning: Essential Checklist Drop the baggage and simplify your Disaster Recovery strategy Sean Clark VCP 2, 3, 4 and VMware vExpert 2009
  • 2. VMware Disaster Recovery Planning: Essential Checklist Executive summary Planning and implementing a VMware disaster recovery (DR) plan is not a task to be taken lightly. If you jump in without some minimum planning you’ll end up with some surprises you, your boss or your budget won’t be agreeable to. Worse yet, if you skip key steps neglecting to collect key information prior to designing, you can end up with an unwieldy DR solution that doesn’t meet the needs of the business. This eBook will serve as a checklist that can guide you on the creation of a top-notch VMware disaster recovery plan. The checklist follows industry best practices for implementing complex technology solutions by taking a phased approach to instituting a DR plan. This approach includes the following phases: • Assessment—Gathering key requirements for DR solution • Design—Creating a DR plan to meet business and technical requirements • Deploy—Stand up necessary infrastructure. Install, configure and test solution • Manage—Test your DR plan as frequently as possible This approach should be reapplied as your business requirements change or to take advantage of technology advancements that can reduce costs and enhance DR capabilities. The result is a DR plan that is flexible enough to adapt with the times and your business. Since we’re talking about recovery of VMware environments, we will focus on leveraging its unique capabilities to the maximum degree. The unique capabilities and properties of VMware environments allow us to create the ultimate test-driven DR plan and help be a catalyst for moving to 100% virtualized environments. The focus of this eBook is the planning side of DR and less on the execution and operation of the DR plan. As such, we'll focus on the Assess and Design phases. Assess Business impact analysis Determine RPO (recovery point objective) and RTO (recovery time objective) Understand your budget Understand application dependencies Automate VMware environment data collection Design Virtualize stragglers Analyze resource requirements Design for easiest restore Decide on infrastructure configuration Test-drive DR plan 2
  • 3. VMware Disaster Recovery Planning: Essential Checklist Business Impact Analysis Let’s be frank. As cool as server virtualization technology is, it doesn’t provide your business with revenue, unless you are company like VMware or Veeam. As IT professionals, your job is to design, develop and manage the technology systems that support the business’ ability to turn a profit. But equally important, is the ability to restore these systems as rapidly as possible in a disaster. Before you begin spending money on your disaster recovery software, hardware and facilities, you need to know where to start. You should first assess your business and gain an intimate understanding of which processes, systems and data are most critical to the success and future survival of your company. This process is referred to as a business impact analysis (BIA). Without one, you open yourself to the risk of wasting resources or overprotecting assets of little value to your business. Worse yet, without a BIA, you may end up neglecting to plan recovery for key IT systems that your mission-critical systems depend on. What's in a BIA? A BIA can be as complex and time consuming as you want it to be. Complexity and time are also a discrete function of the size and complexity of your business. In either regard, all business impact assessments are looking to accomplish the same fundamental tasks. For example, the following list was gathered from a great free BIA template published by the U.S. Centers for Disease Control and Prevention for the purpose of helping guide the development of a DR plan. In this template, the following main areas of assessment are addressed: Key BIA activities 1. Identify critical business systems 2. Identify system resource dependencies 3. Identify key support personnel or teams 4. Estimate disruption impact 5. Determine resource recovery priority Having this granular knowledge of the business impact of your critical systems not only will help you in a real disaster scenario, but it will help you test your preparation for the disaster. Knowing where to focus your DR planning efforts will help you greatly streamline and prioritize your disaster recovery exercises, or tests. The BIA is not just a technical system inventory, but you’ll need to work with the business side to define RPO and RTO for key business services and the IT services they depend on. Setting the objectives gives DR planners and managers something to design and manage to. Without defining these key requirements for your disaster recovery planning, you risk spending too much on a higher level of data protection than is required. The other risk is that you don’t provide enough protection for your critical resources and end up costing the business time and money in the event of a disaster. In the following section, we’ll walk through why RPO and RTO planning matters. 3
  • 4. VMware Disaster Recovery Planning: Essential Checklist Determine RPO and RTO During your BIA, you should spend a good deal of time developing an intimate understanding of how your business makes money and catalog the key resources and processes necessary to enable revenue creation. In some companies, thismay be a single business process that will translate to clear guidance on RTO/RPO requirements. In larger companies, with diversified products and services, you will likely catalog multiple use cases to address with different DR strategies. Regardless of the business size, the process of DR planning is similar, and we apply the same process to categorize the use cases we discover in our DR assessments. The following are some example DR use cases. By reviewing these common use cases and identifying their RPO/RTO, you should be able to apply similar logic to your own business and gather these guiding requirements. Educational Institution: Keeping costs low On one end of the spectrum, would be a grade school with fixed budget based on enrollment and no revenue generation based on system up-time. However, the core product and service coming out of the school is the quality of the children’s education. In an environment like this, it’s important to keep costs as low as possible, but still provide a system that will reduce cost of recovery that can likely call for third-party IT staff to help recover systems. Most systems can withstand some loss of data and recovery needs to be timely, but certainly not instant. Since schools can still operate effectively without IT, it is likely that a RTO measured in days to a week will result from this assessment. The RPO would likely be around 24 to 48 hours for most systems. Accounting Firm: CDP during tax season Throughout the year accounting firms do a certain amount of business and are tolerant of 24 to 48 hour RPO and RTO. But in the United States, from February through April, it is the busy tax season. Overtime and packed daytime schedules are the reality. Data loss and system downtime is NOT an option. Near-zero RTOs and RPOs are required for this use case. For the small and midsized firms, expensive active-active accounting system designs are not an option, and neither is expensive array level replication. This is a perfect use case for Veeam’s SmartCDP. SmartCDP is a near-continuous data protection (near-CDP) solution where virtual machines (VMs) are continuously replicated to a safe site which brings RPO down to around 5 minutes and RTO can be as fast as the accounting firm’s IT professionals and executives are ready to declare a disaster and restart the affected VMs. Healthcare: Ensuring quality patient care In a healthcare setting there exists the perfect storm for DR planning. Today's healthcare IT systems can actually be a profit center for many organizations. These systems need to be functioning to allow profitable procedures like MRIs, ultrasounds or any of the cardiac-related procedures. The profit side of the equation is important, but not the only concern. In healthcare, patient care is king. If technology is not available to serve patient needs, then the profits are meaningless. Healthcare operates around the clock and pressures IT to deliver services at a very high level. These highly critical systems demand a low RTO to guarantee patient care goals are met and healthcare organizations can remain profitable through systems disasters. Data loss isn't necessarily a financial risk, 4
  • 5. VMware Disaster Recovery Planning: Essential Checklist unless lawsuits are considered, but a high quality of patient care dictates that the best patient health information to be available to ensure continuously good care through shift changes and doctor rotations. So, in most healthcare organizations, budget becomes the determining factor for what you'll end up choosing for RTO and RPO. While working within your fixed budget, you may establish RTOs and RPOs that are as low as possible during the times you require. Veeam Backup Replication with its ability to back up, replicate and provide near-CDP in one product, provides the flexibility to address all healthcare needs. Understand Your Budget Virtualized DR is much less expensive than traditional physical DR, but it is still an additional cost on top of your already sizable investment in virtualization software, supported server hardware and new storage systems. Some companies will have the budget freedom to design the “Cadillac” of DR solutions. For the rest of us, we have to be very aware of the budget limitations and the factors contributing to that limitation. Knowing your budget limit and some key strategies will allow you to optimize your DR plan to get the most capabilities out of your limited resources. Budget purchases wisely One recommendation for DR budget planning is to consolidate all disaster recovery options inside a single product so that you’re not paying twice for two software products, two backup infrastructures and the associated operational costs that can sink you. Instead, plan to make a strategic investment in virtualized DR and go “all-in” with Veeam Backup Replication and drop strategies that leverage legacy components. This can reduce ongoing license and support cost as well as simplify operations, creating a substantial cost savings. Phased Budget Ideally, you should suggest a phased DR assessment budget by the business or by your customer. In this method, you are allowed a fixed budget to conduct your assessment and initial planning with the expectation the outcome will be a more accurate budget estimation of the final solution. This method builds trust with the business or customer and ensures them that you are not making these recommendations on a whim and that the DR plan is exercising due diligence. But once the assessment is complete and a preliminary design can be conducted, you'll have to a decision to make in determining how much you will ask for. Communicate the Vision Just like companies and their initial server virtualization efforts realized, you may have to spend money to save money in the case of virtualized DR. These first pioneering IT organizations realized that the sooner they virtualized their entire environment, the sooner they could start reaping the rewards of reduced power consumption, reduced server hardware cost, and greater flexibility in operations. Delaying ROI of virtualizing your physical servers was not recommended and the same thing is true with a virtualized DR plan. The longer you have to maintain a legacy DR solution alongside a virtualized one, the more risk your business accepts, the more costly DR exercises are, and the more operational costs IT departments take on to maintain two or more separate DR solutions. At this point in the budget process, it's important to lay out the long term vision for 100% 5
  • 6. VMware Disaster Recovery Planning: Essential Checklist virtualized DR and communicate the benefits of legacy-free disaster recovery. If business leaders understand the true value of virtualized DR, you should have success funding the project properly to realize the full benefits. A good rule of thumb is to shoot for the plan that can create the lowest TCO (total cost of ownership) over the next 3 to 5 years. Executive Champion Virtualization can be a complex topic for business leaders to understand. Throwing DR planning on top of that can sometimes put non-technical leadership into a corner they are uncomfortable with. To make sure you get the DR plan your company needs, you'll need to understand the concerns and realities of the business, and be able to clearly communicate the solution's benefits to the company. If you are dreading these conversations you should consider identifying an executive champion to get involved. This champion is usually an executive familiar with IT but accustomed to planning with other executives and speaking at a technical level they can understand. For companies without formal technology executive positions like a chief information officer (CIO), an executive champion dedicated to DR planning project can be a critical component. Understand Application Dependencies It’s crucial to understand dependencies of core applications when creating your DR plan. Does an application depend on an external database on another VM? What restore order is needed to test the application? And even today, we still need to be concerned about what servers are still physical. These dependencies are critical to catalog and plan for. No matter how well you protect the critical VMs, if you forget the weakest link in the dependency chain, you might as well have not protected any systems. Active Directory, DNS and DHCP Everyone has some critical applications that are core to the organization’s success, and maybe people look to protect these applications first. This is a mistake that can be avoided but continuing to follow the change of dependencies down the lowest level. Assuming you have basic physical facilities and network access accounted for in the DR plan, you need to make sure that core infrastructure services are next on the plan. Like buying a car without wheels, restoring your critical applications without these core infrastructure services will have you going nowhere fast. Core Infrastructure Services Needed for DR • IP address assignment (DHCP, etc.)—Local to each site and required for any communication on the network • DNS—Ensures that servers and PCs understand how to reach each other as well as Internet resources • Active Directory—Provides directory service to secure access to recovered systems These services can be provided in a number of ways, but in the majority of small business and mid-sized companies, we are talking about Microsoft Windows Server VMs running Active Directory. Before Active Directory servers providing 6
  • 7. VMware Disaster Recovery Planning: Essential Checklist DHCP and DNS can be recovered, you need to ensure you have a strategy in place to guarantee their recovery. If Active Directory servers are restored incorrectly, you will waste precious hours conducting manual recovery steps to restore function to this critical service. Ensuring a successful trouble-free restore actually starts with a VM backup and replication tool that fully supports VSS (Volume Shadow Copy Services) for both backups and restore. Veeam Backup Replication has provided this functionality since its first release. This VSS-aware technology is the key layer of defense for situations in which you are unable to replicate Active Directory to your disaster recovery facility. Example scenarios include single site businesses without the budget for a DR site, or businesses that choose to only maintain DR contracts with cloud providers and don’t want to maintain active VMs that incur monthly fees. Mission Critical Applications Mission critical applications are the lifeblood of the company and consist of stateless application server VMs as well as VMs containing persistent data like databases or file system objects. With traditional legacy backups this can be a terrible chore to document and remain current on all the specific files and folders inside a VM that needs to be backed up, especially when application upgrades may create new files and folders not included in the original backup configuration. Focusing on entire VMs for a virtualized DR plan avoids focus on the micro-management of the data protection, but rather on identifying the higher level service components that need to be protected and restored. Similar to the Active Directory backups mentioned earlier, if your mission critical database is running SQL Server, you need to leverage VSS-aware products to ensure application consistency is maintained during backup and replication. Without this key technology, you will be left with crash-consistent databases which will slow your recovery time after a disaster or during disaster exercises. Microsoft SQL Server provides what’s called a VSS writer with its products, and is one of the key pieces that Veeam can leverage with its own advanced VSS requestor technology to ensure application-consistent backups. However, if you are not running a database or OS that supports VSS you will have to take other precautions. In the non-windows world, there can be various ways to ensure database and application consistency during backup and replication windows. You will need to identify these non-VSS enabled Databases and work with good database administrators (DBAs) that understand the application requirements so you can create a backup and replication method that can guarantee application consistency. This may require pre- and post-scripts to be developed, purchased or borrowed from the community or a vendor. These scripts can help guarantee recovery consistency by shutting down the database service and freezing I/O on the mission critical VM until Veeam can initiate the VM snapshot. Stateless Application Servers Not all servers contain persistent data, but all servers have a rebuild time. This can be as simple as an automated deployment or a large effort involving significant time and labor costs. These stateless application servers can be important servers to protect, but they will not be protected in the same way as busier servers with critical business data being creating daily. These servers can be protected less frequently and triggered only during critical periods containing change. For instance, prior to application upgrades or major software changes, you could initiate a whole-VM backup and take small, quick incremental backups for a 7
  • 8. VMware Disaster Recovery Planning: Essential Checklist period of time to ensure you have a good known state to restore to. Then shortly after the software change has been determined to be successful, you would then want to take another series of full and incremental backups to provide a good known state of the VM to restore back to if disaster occurs after the VM change. Once you have proven you have good backups of these stateless VMs, the schedule can be relaxed to save bandwidth and I/O. As long as you continue to test restores of the entire application stack, along with its dependent data tier, this can be an option for certain DR requirements. Protect Your Deployment Systems Some businesses choose to invest heavily into their ability to quickly re-install application stacks on stateless VMs rather then protecting more data than is technically needed. This can be a great strategy for scale-out workloads like Terminal Server-based application servers, java application or web servers. In these situations there is a large ROI (return on investment) from automating the provisioning of complex server configurations and utilizing it often for upgrades, server refreshes or scale out operations. This doesn’t mean you’re off the hook, though. You'll need to follow the dependencies and identify the systems responsible for re-deploying these stateless VMs to make sure that they are protected and available in the DR site. This exercise will raise some interesting questions about what should and should not be re-deployed as part of a disaster, ultimately bringing into the question of the value of end-to- end provisioning systems. In short, end-to-end provisioning strategies should also include re-deployed tested whole-VM images as well as whole application stacks. Your ultimate decision will just come down to numbers—how many VMs are based on a common configuration and how quickly they need to be restored in the event of the disaster. Automate VMware Environment Data Collection VM inventory automation can help quickly and accurately collect information on the virtual environment that’s invaluable to designing your DR plan. Whether you have 25 VMs or 2,500, automating the collection of VM information can jumpstart you on the way to accurately designing your DR plan. There are a multitude of tools available to assist with this data collection task. Since we’re planning for a virtualized DR plan, I’m a big fan of leveraging virtualization management software from Veeam to help ease this task. Veeam Reporter Veeam Reporter is a great tool that gives you the insight into your environment very quickly. There is both a free version and full version of Veeam Reporter. Both can be invaluable in quickly collecting inventory information from existing VMware environments. This information helps document your primary virtual datacenter, and can be a guide for setting up the disaster recovery site. Output from this tool include spreadsheets, Word documents and even Visio diagrams of your VMs, ESX(i) hosts, VMware datastores and networks. Veeam Reporter can grab a lot of data in just a few minutes. 8
  • 9. VMware Disaster Recovery Planning: Essential Checklist Veeam Monitor Whether you are looking to build out the bare minimum DR infrastructure or you are looking to determine at what point your DR solution is just getting gaudy, you'll need good statistics on current resource utilization to properly size your DR infrastructure. Veeam Monitor can be used to assist you with this resource utilization collection. Again, there is a free version, but the full version is the way to go if you would like to continue charting virtual infrastructure utilization after the planning phase. When measuring virtual infrastructure utilization, we are trying to capture a few key areas that will determine the ultimate cost of the solution. CPU and memory utilization is important for sizing the servers required for the recovery site. Here we’ll focus on CPU GHz used on average, and GB memory consumed. Storage Consumption with Veeam Backup Replication Storage requirements can be complex to discover. Although Veeam Monitor can report on how much storage you are using today, it’s not operationally realized for a virtualized DR plan. This means it doesn’t give you an easy way to estimate your storage requirements for backup and replication of whole VMs. To accurately assess storage needs you should consider using Veeam Backup Replication and conduct an actual proof-of-concept (POC) of the software. This will allow you to learn how the product will work in your environment but also to give you real-world values for backup storage needs. Everyone can determine the cost to store full backups since it is just a multiplier of the original disk, but incremental replication passes can be tricky. By running Veeam Backup Replication for a few days on actual workloads, you’ll accurately record the real-world values for the daily change rate as well as gain statistics required to size your DR storage systems. This daily change rate of the VM data will be critical in determining future replication bandwidth requirements as well. So, with a simple POC of your possible DR solution, you’ll be able to gather the statistics needed to properly size two of your most expensive DR resources: storage and network bandwidth. 9
  • 10. VMware Disaster Recovery Planning: Essential Checklist Virtualize the Stragglers If you still have physical servers, it’s time to make the switch. The benefits of virtualized DR are well known and have been written about and practiced for more than 5 years. No matter how good your DR solution for physical servers is, it can’t come close to approaching the capabilities and cost of a virtualized DR. But many workloads have avoided migrating to virtual for one reason or another, which throws a wrench in to the DR planning machinery. VMware Is Best DR Platform for Business Critical Workloads You probably have a large portion of your environment virtualized with VMware, but it’s likely that you have some business critical systems that remain on physical systems because of their importance. Unfortunately, placing your business critical systems on physical servers because they’re important is a mistake. If they were that critical to your business, don’t you think that providing the ultimate DR solution for them would be your organization’s starting point? These critical systems should be virtualized to experience the full benefits of virtualized DR, but not every application owner and DBA fully understands our virtualized DR zealotry. You'll need to communicate the benefits inherent to today’s virtualized DR to these application owners to win them over. Virtualized DR Benefits • Snapshots—Be able to test critical patches and roll back if failure occurs • Restore entire server image (operating system [OS], application, data) to any hardware without messing with drivers • Refresh hardware with zero downtime • Restores can be automated and tested often • Files and other application items can be restored from VM backup images • VSS integration can ensure application consistency VMs Performance Is No Longer a Barrier Stubborn DBAs and critical-application owners may love to take you up on DR capabilities alone, but they still have one trump card in their hand: VM performance concerns. Five years ago, they might be justified in playing that trump card. But with advances in virtualization software and hardware purposely built for virtualization, these concerns are no longer warranted. • VMs can now scale up to 8 processors with 255 GB of RAM • VMs are capable of providing north of 300,000 IOPS when configured with a powerful enough backend storage system • 10 GB networking erases concerns of VMs being starved of bandwidth by other VMs • Next vSphere version due out in 2011 will likely increase these limits more Yes, VMs can scale larger than ever before, but without proper VMware capacity planning practices, the benefits are negated. Planners still need to ensure they 10
  • 11. VMware Disaster Recovery Planning: Essential Checklist have the right consolidation ratios given the virtualized workloads and underlying hardware resources. Having the tools to properly plan these consolidation ratios, monitor utilization and give application owners relevant virtual hardware performance statistics is critical. Tools like Veeam Monitor can provide the performance view at the hypervisor level and provide OS level statistics in a single view. Having the right plan and the right visibility into performance will help gain trust and drive more use of virtualization where you need it most. The Singular Option: 1 VM Per Server All the management tools and virtualization know-how may still not be enough gain permission to virtualize critical servers. Many times these mission critical workloads have seen duty on non-x86 server platforms in the past, such as an AS/400 or a proprietary RISC-based platform. These options were not cheap and many times more expensive than a physical x86 server, so they are not easily defeated by server consolidation benefits. With today’s powerful virtualization enabled hardware and VMware software to provide the DR platform, you have a singular option available to meet the performance and DR requirements of the critical workload. That means dedicating a single host server to a critical VM. Who says just because you are running VMware on your servers that you have to maintain hero consolidation ratios? Putting performance (and egos) first and not being afraid to consider limited use of 1:1 consolidation ratios, will help you win over the stodgiest application owner. Over time, you may be able to win their trust to allow higher consolidation ratios as long as performance requirements are met. The singular option is a little of both, but when compared to the lack of DR features for physical servers or the cost of the proprietary past, it can make good sense. On-Demand Sandbox Testing Once virtualized, another unique benefit you can offer owners of business critical applications is the ability to troubleshoot on mirror image systems in real time without disrupting the production server image. How is this possible? Veeam Backup Replication offers an On-Demand Sandbox functionality. . This sandbox functionality allows you to boot VMs directly from an NFS server presented by the Veeam backup host, without requiring a time-consuming restore or provisioning extra storage to the vSphere environment. This capability allows problems to quickly be resolved since administrators will have exact copies of productions systems to test with, restart services or try fixes without the fear of disrupting operations on the live systems. This enables the system administrator's version of the Hippocratic Oath so administrators “do no harm” to production systems in the process of fixing them. This is no replacement for good system deployment capabilities, but there are plenty of instances where, due to the number of systems deployed, it doesn’t make sense to spend time automating the deployment. In this case, having the entire VM backed up for redeployment is a big benefit for developers. Analyze Resource Requirements It should go without saying, but DR planning is about preparing for the loss of your primary datacenter. This means you need to size and budget for a recovery site capable of meeting your requirements in a disaster scenario. During the assessment phase of our DR planning, automating the collection of some 11
  • 12. VMware Disaster Recovery Planning: Essential Checklist key virtual infrastructure inventory as well as resource utilization statistics is recommended. It’s now time to use that information to properly size your DR solution. Compute It's best to start with compute statistics, that is, how much CPU and memory are utilized. If you're planning to restore every single server and maintain identical capacity, this exercise is easy and you'll duplicate your production environment at the DR facility. In more budget-minded organizations, you're going to analyze the statistics of production workloads and identify only the critical workloads that need to be running in order to establish the estimated DR infrastructure required in a disaster. These utilization statistics translate into CPU sockets required. Storage When analyzing the storage requirements, we want to make sure that we have enough raw storage space to store what is necessary. But we also want to know what kind of performance characteristics are required to drive your primary workloads. For storage space requirements you will start with the total gigabytes of all the VMs that you plan to recover to the DR site. Add to that, the amount of full backups or replicas you'll want to keep and the amount of daily incremental backups. Generally speaking, DR storage is based on the VM's configured memory and storage allocation, so calculations could be derived from the statistics gathered with Veeam Reporter. In addition to the raw space, it's important to understand the performance required of your storage systems. This is usually measured as IOPS and storage bandwidth. These two statistics describe how active your VM storage is, and whether you can get by with SATA drives, SAS drives, or whether you'd be a good candidate for an auto-tiered storage system with enterprise flash or SSDs for tier 0, SAS for tier 1 and SATA for tier 2. Many people make the mistake of buying large capacity SATA for DR because they can save on storage purchase costs. However, when it comes time to rely on that storage in a disaster, the availability of their systems is in jeopardy due to performance. It's understandable to want to save money on your DR, but for this size of an investment, you need to make sure you're not shooting yourself in the foot by getting too risky. Analyze the statistics and budget accordingly. Network We talked about calculating daily change rate of data earlier. If you decide to use replication over a secured VPN connection over the Internet or leased WAN circuit, you'll want to know how much data will need to be moved across the network in a single day or replication window. This will help you forecast the size of Internet bandwidth required to be successful and if you need to upgrade your WAN circuits. If your options for Internet bandwidth are limited, this analysis will be crucial to understand whether you will be a good candidate for replication or whether whole-VM backups to tape-backed disk archives is a better option for you. WAN Acceleration Need In analyzing your network connectivity, it's critical that you understand your bandwidth, the latency between your primary site and DR site, and the reliability 12
  • 13. VMware Disaster Recovery Planning: Essential Checklist of the connection. If you have high latency and packet loss connections, you may not be able to meet your backup windows, and consequently, suffer lower RPOs. Products like HyperIP from Netex offer WAN acceleration technology that is purpose-built for accelerating large data transfers over packet loss and high latency network links. If you are a Veeam customer, they even offer a 1-year free trial version of HyperIP to allow you to thoroughly kick the tires before purchasing. Design for Easiest Restore It is imperative that a good DR plan design for the easiest restore possible. In a disaster situation, there can be a lot of confusion, different environments, and possibly a different or missing workforce. A disaster is not the time to have many complex, manual steps to follow while under the stress knowing your business' ability to pay your next paycheck may hang in the balance. Simplicity is king in a disaster situation. You can't count on having your best DR expert available to coordinate the recovery. You should plan for other personnel to be coordinating the recovery while you or your DR expert is stuck on a Caribbean island with the cell phone turned off. Being successful in this situation will require your skeleton DR staff to have plenty of DR exercises under their belt and have the simplest restore procedures possible. VM Recovery Steps Comparison Legacy Recovery Whole-VM Recovery Method OR with Veeam 1. Provision empty VM 1. Restore whole-VM 2. Reinstall a fresh system at 2. Power-on VM that was pre- the DR site verified with SureBackup 3. Patch the OS 4. Install application binaries Note: Replication would be a and other dependencies single step to power on the VM. 5. Install backup agent and then proceed with restore of unverified application data 6. Configure application to work with recovered data 7. VM is ready to be restarted and application verified for first time Don’t Reinvent the Wheel, Restore the Whole VM In a VMware DR plan, you want to utilize the most powerful features of VMs: encapsulation and hardware independence. VMs are just a group of files and can be copied to other ESX(i) servers (regardless of hardware vendor) and can be powered on and returned to service, sometimes, without any further modification. For this reason, whole-VM protection methods are superior to legacy methods that rely on multiple manual steps to create a workload from start to finish. From the comparison chart below it's pretty easy to see why whole-VM recovery is preferred. 13
  • 14. VMware Disaster Recovery Planning: Essential Checklist Using legacy protection measures on virtualized workloads introduces complexity, cost and risk to into your DR plan that your company can’t afford. By restoring the whole VM you drastically cut the number of steps required and you open the door to be able to test and verify the recovery of the VM prior to needing it. Start with Replication There are two general methods to accomplish whole-VM recovery: VM backup and VM replication. The first requires you to backup the entire VM to some external storage media or a replicated file system. Then when recovery is required, restore the VM to the recovery site ESX(i) servers through a simple file copy. Veeam Backup can make this process slightly quicker in that it offers instant-on features allowing you to present an NFS export to the ESX(i) server, and boot a VM directly from its backup file. Eventually you would need to perform a Storage vMotion of the VM to primary storage or do a full cold restore of the VM from a backup media/file system to the recovery VMware environment. The other recovery method is to replicate the entire VM to the recovery site ESX(i) servers so that the replica VM is already pre-staged and ready-to-boot. To recover the VM, you power it on. As simple as VM backup is, one-step recovery with VM replication is very hard to beat and it is almost impossible to provide better RTO unless you call active-active geo clustering a recovery technique.” When designing for easiest restore, VM replication has to be on the top of your list for tools to consider. Decide on Infrastructure Configuration After all the interviews, data collection and analysis, you'll eventually have to chart a direction and make some decisions. You'll have to decide on a final configuration for hardware, software, off-site data transport method, and recovery processes. There is no one right way to do this but armed with business requirements for recovery, application dependencies, and your budget guidelines, you should have enough information to start to make some decisions Servers Any x86 server hardware will do here, but the question is more about what kind of capacity do you require in a disaster and what's the most cost effective way to meet that need at the DR site? Those 5-year-old 2U rackmount servers with 4 total processor cores and 16GB of RAM might do okay in a pinch for a small portion of your DR environment, but only if you don't recover the whole environment. Although those servers might be free, they don't look so good when you're paying for rack space and power for dozens of servers at a co-location facility. It may be cost advantageous to purchase new servers that have 10 times the capacity which can reduce DR licensing costs for Veeam and VMware while cutting your physical space and power requirements by a factor of 10. Whatever your decision, make sure you provide for adequate capacity based on real world measurements from your production VMware environment and guided by the Business Impact Assessment (BIA). Storage If you need vMotion and High Availability at the DR site, you'll need to invest in shared storage to go with the VMware ESX(i) servers that you'll be replicating to or restoring VM backups to. Choosing NAS, iSCSI and Fiber Channel are all good 14
  • 15. VMware Disaster Recovery Planning: Essential Checklist decisions, and most are valid options. If you are a small business or a small remote office, shared storage for VMware may not always be possible and you may be required to use local storage contained within the recovery servers. Although these setups aren't as efficient to manage in a production environment, they can be good enough in a disaster to allow your business to provide revolutionary DR capability at a bargain price. In configurations with locally attached storage, you'll be happy to know that Veeam Backup Replication can support that option as well since it can write to any VMware datastore visible to ESX(i) server. Network We talked earlier about network considerations. Basically, there is enough network bandwidth or there is not. There either is high latency or there is not. If you have the budget, make the investment in high bandwidth links between your recovery site and your primary datacenter. This can allow the most reliability and lowest operational cost for your backups and replication since no error-prone manual or physical methods are required to me move data to recovery site. Whether it is due to budget-related or geography-related limitations, not everyone has the network bandwidth available to replicate critical assets. That's why the old adage remains true, Never underestimate the bandwidth of a van full of tapes driving down the highway. Your network realities may dictate a whole VM backup to disk or tape that is then trucked off-site for safe keeping or for test restoration at the DR site. In these situations you will be sacrificing the ultimate RTO from the start, so it's not as important to have all servers racked, stacked, powered and ready to go. You might even consider alternate means for provisioning server resources in these scenarios. DR in the Cloud? In the case where replication is not an option and you have VM backup images that can be restored to any ESX(i) servers in the world, why not restore to the cloud? There are countless VMware hosting providers available today that can rent you resource pools or whole VMware environments. Rather than investing in expensive, duplicate datacenter locations that will only be used in the unlikely event that an actual disaster occurs, you can instead bank that money and only pay a small portion in the event a disaster happens or in the event you'd like to test your recovery. If you do decide to move forward with restoring to a VMware hosting provider, you may need to do some advance planning on the contract side to help speed your recovery if needed. Although we're getting closer to the dream world that allows you to whip out the company credit card and spin up a DR site in minutes, it's more likely that you'll want to sign a contract in advance in order to get some guarantee that the resources you'll require will be available should you declare a disaster. Of course this insurance will cost you, but it will be much less than if you purchased the resources full time or if you stood up your own DR site. Test-Driven DR Plan In the software development world, a popular software development process is test-driven development (TDD). In TDD, developers first create automated unit tests that will only pass successfully if the new piece of code under development fulfills all criteria. By writing the test first and then developing the code, quality is 15
  • 16. VMware Disaster Recovery Planning: Essential Checklist improved since code can’t be released until the unit tests pass successfully. This process has proven very successful for software developers, and a derivation of the process can now be applied to virtualized DR. This derivation can be called test-driven DR and it turns traditional DR planning on its head by planning for the restore and verification of the restore before you plan to do your first backup. Design with Testing in Mind It takes more than petabytes of shiny deduplicated, compressed backups to save the day in a disaster situation. If you can't restore successfully and quickly from those fancy backups, then what was the point? With today's VMware virtualized systems, there is no longer an excuse to not test your recovery as often as possible. If replica VMs are ready to boot in a test recovery environment, you are just a PowerCLI script or web service call away from creating custom workflows to orchestrate the recovery of your protected VMs. By building upon what you learned with application dependencies and target RTOs, you can create custom workflows that will bring up your protected VMs in the order required to test your ability to restore. And since we're talking about virtualized environments, you can easily adjust the VMware networking with a simple web service call to ensure that recovered VMs are placed in an isolated network that you prepared in advance. Your functionality is only limited by your time and scripting ability. However, not everyone is a programmer or has the time to create these workflows and verification scripts. Veeam SureBackup is the solution to help programmers and non-programmers create a foundation for their test-driven DR plan. SureBackup Recovery Verification Is Test-Driven DR With the SureBackup functionality in Veeam Backup Replication, you can verify the recoverability of every VM backup every time. This recovery verification of individual VMs is the essence of test-driven DR planning since you are designing tests that will fail until you properly design and execute your automated backup and restore system properly. As in TDD, if a SureBackup verification test fails, you will reconfigure your recovery or backup until the verification passes all tests. Since it’s all virtual and able to automatically run within an isolated network, you can run these DR tests repeatedly until you find the hidden dependency, incorrect IP addressing, or out-of-order recovery step. This cycle of DR plan refinement can verify your entire DR plan within a few short days for small DR plans to weeks for more complex DR plans. Test-Driven DR Enables Continuous Testing With traditional DR exercises leveraging legacy DR solutions, businesses are lucky if they have the time and budget to test their DR plan annually, let alone resolve all outstanding issues with the recovery. The technology is available to make test-driven DR planning a continuous process for your virtualized environment. You should work toward a goal of near-daily automated recovery verifications to bulletproof your DR plan. Limiting yourself to annual or quarterly DR tests is a relic of DR planning past that no longer applies. When creating your VMware DR plan, be sure to not only eliminate legacy technologies of the past, but to scrap the legacy processes as well. Freeing your mind of yesterday’s DR baggage will help you embrace the possibilities of virtualized DR and fully experience its benefits for your business. 16
  • 17. VMware Disaster Recovery Planning: Essential Checklist About the Author Sean is a ten-year IT veteran with a background in software development, database administration, security coordination, and IT management. The last five years, he has focused on developing his expertise in VMware virtualization and surrounding technologies. He has kept current VMware Certified Professional (VCP) status on VI 2.5, VI 3.5 and vSphere 4. In 2009 Sean was awarded VMware vExpert status, one of 300 globally to receive the award recognizing their contribution to the virtualization community. Since Sean Clark then, Sean has been an active member of the virtualization VMware vExpert community as a notorious Twitter contributor with the handle of @vSeanClark, as co-instigator of the popular vmunderground.com community party at VMworld, and as a random blogger at http://seanclark.us. He has provided guidance on virtualization strategy to businesses of all sizes and from all industries, and is currently a virtualization consultant with TEKsystems working on a long-term cloud computing project for a Fortune 500 company. About Veeam Software Veeam Software, an Elite VMware Technology Alliance Partner, develops innovative software to manage VMware vSphere®. Veeam vPower™ provides advanced Virtualization-Powered Data Protection™ and is the underlying technology in Veeam Backup Replication™, the #1 virtualization backup solution. Veeam nworks extends enterprise monitoring to VMware and includes the nworks Management Pack™ for VMware management in Microsoft System Center and the nworks Smart Plug-in™ for VMware management in HP Operations Manager. Veeam ONE™ provides a single solution to optimize the performance, configuration and utilization of VMware environments and includes: Veeam Monitor™ for easy-to-deploy VMware monitoring; Veeam Reporter™ for VMware capacity planning, change management, and reporting and chargeback; and Veeam Business View™ for VMware business service management and categorization. Learn more about Veeam Software by visiting www.veeam.com. 17
  • 18. 2010 Products of the Year GOLD VMware Backup 100% Reliability Best RTOs Best RPOs SureBackup TM InstantRestore TM SmartCDP TM vPower TM Virtualization-Powered Data Protection TM 5 Patents Pending! VMware vSphere 5 Patents Pending! NEW Veeam Backup Replication™ vPower enables these game-changing capabilities in Veeam Backup Replication v5:  Instant VM Recovery—restore an entire virtual machine IN MINUTES by running it directly from a backup file  U-AIR™ (Universal Application-Item Recovery)—recover individual objects from ANY application, on ANY OS  SureBackup™ Recovery Verification—automatically verify the recoverability of EVERY backup, of EVERY virtual machine, EVERY time To learn more, visit www.veeam.com/vPower
  • 19. VMware Disaster Recovery Planning Essential Checklist DR planning in a VMware environment requires old-fashioned DR planning fundamentals but also requires fully leveraging virtualization’s unique characteristics. This checklist of 10 proven DR planning activities provides you a jumpstart towards an award-winning VMware DR plan. Conduct a Business Impact Analysis (BIA). A BIA helps you identify critical business systems, their IT and human dependencies, and an estimated disruption impact to your business. You can then determine which applications are most important. Know your recovery point objective (RPO) and your recovery time objective (RTO). Develop an intimate understanding of how your business runs and catalog the key resources and processes necessary to enable revenue creation. Translating the findings from the BIA into RTO/RPO requirements for each application, helps you focus your resources where they are needed most. Understand your budget. Virtualized DR is much less expensive than traditional physical DR, but it is still an additional cost on top of your already sizable investment in virtualization software, supported server hardware and new storage systems. Avoid the expense of maintaining both legacy and virtualization-aware backup systems by migrating to all virtual DR. Understand application dependencies. Most applications have dependencies external to the virtual machine (VM) that it runs on. In a disaster, it’s critical to have cataloged these dependencies because you will have to recover each one to restore end- to-end functioning for that application. Start at the base infrastructure services like DHCP, DNS and Active Directory. But don’t forget to account for file shares, databases or other non-virtualized servers recovered through legacy means. Automate VMware environment data collection. VMware inventory automation can quickly and accurately collect information on the virtual environment that’s invaluable to designing your DR plan. Tools from Veeam can help ease the task. Veeam Reporter can catalog the configuration of the VMware environment, even providing Visio diagrams to reference. Veeam Monitor can provide the performance statistics you need to size your DR infrastructure. Plus, a Veeam Backup Replication proof of concept (POC) is a good way to learn what your daily data change rate is so you can appropriately size your network connections to the recovery location. Virtualize stragglers. If you still have physical servers, it’s time to make the switch. The benefits of virtualized DR are well known and have been written about and practiced for more than 5 years. No matter how good your DR solution for physical servers is, it can’t come close to the capabilities and efficiencies of virtualized DR. Virtualize your remaining physical servers to achieve the most benefit from your DR Plan. Analyze resource requirements. Using the data collected in the assessment phase of your DR plan is invaluable in sizing the DR site and creating your DR budget for servers and storage. The largest limiting factor to the ideal DR plan for VMware is the bandwidth required to replicate all necessary VMs. Consider products, such as HyperIP from Netex, that offer WAN acceleration technology purpose-built for accelerating large data transfers over high packet loss and high-latency network links. This can allow for better use of available bandwidth without breaking your budget. Design for easiest restore. Simplicity is king in a DR situation. Rather than reinvent the wheel by reinstalling operating systems, applications and restoring individual files, you should restore the entire application as a VM to minimize restore time. Replicating the VM with Veeam Backup Replication can provide the lowest RTO possible since VMs only need to be powered on to restore service. Decide on infrastructure configuration. In today’s cost-conscious IT environment, it’s good to know there are options for your recovery site configuration. Although you can choose to self-host DR options in your own facilities, you can also take advantage of VMware service providers that could provide your DR infrastructure as an on-demand cloud service. Test-drive your DR plan. Setting up a DR plan for VMware environments is not a one time activity. You need to ensure that you test, test and test. Manual tests are good, but since you’re working with VMware technology, there’s no reason testing can’t be automated and run as often as daily if needed. Using Veeam Backup Replication’s SureBackup automated backup verification feature is a great way to do this.