Your SlideShare is downloading. ×
  • Like
Lean mgmt congress 2008
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Now you can save presentations on your phone or tablet

Available for both IPhone and Android

Text the download link to your phone

Standard text messaging rates apply

Lean mgmt congress 2008

  • 120 views
Published

 

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
120
On SlideShare
0
From Embeds
0
Number of Embeds
2

Actions

Shares
Downloads
1
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide
  • started implementing kaizen back in 1997. Right from we were convince that kaizen is the only way.To date our conviction have stood the test of time

Transcript

  • 1. Lean Management Congress-2008 (Lean SCM for Competitive Edge) Presented by: Mr. Yogesh Vaghani Vedzen Institute
  • 2. The Products3
  • 3. Milton PlasticsSensai Masaaki Imai are the recipients of the first ever Kaizen Award for World Class Manufacturing 4
  • 4. The first step is to understand your current operation or “Value Stream” You accomplish this byCREATING A CURRENT STATE VALUE STREAM MAP.
  • 5. FROM LOOKING TO SEEING AND FROM SEEING TO DOING
  • 6. Value Stream Mapping Follow a “products” production path from beginning to end, and draw a visual representation of every process in the material & information flow. Then, draw (using icons) a “future state” map of how value should flow.7