Your SlideShare is downloading. ×
0
Lean mgmt congress 2008
Lean mgmt congress 2008
Lean mgmt congress 2008
Lean mgmt congress 2008
Lean mgmt congress 2008
Lean mgmt congress 2008
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Lean mgmt congress 2008

142

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
142
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide
  • started implementing kaizen back in 1997. Right from we were convince that kaizen is the only way.To date our conviction have stood the test of time
  • Transcript

    • 1. Lean Management Congress-2008 (Lean SCM for Competitive Edge) Presented by: Mr. Yogesh Vaghani Vedzen Institute
    • 2. The Products3
    • 3. Milton PlasticsSensai Masaaki Imai are the recipients of the first ever Kaizen Award for World Class Manufacturing 4
    • 4. The first step is to understand your current operation or “Value Stream” You accomplish this byCREATING A CURRENT STATE VALUE STREAM MAP.
    • 5. FROM LOOKING TO SEEING AND FROM SEEING TO DOING
    • 6. Value Stream Mapping Follow a “products” production path from beginning to end, and draw a visual representation of every process in the material & information flow. Then, draw (using icons) a “future state” map of how value should flow.7

    ×