Your SlideShare is downloading. ×
0
CMGC Contracting at UDOT
CMGC Contracting at UDOT
CMGC Contracting at UDOT
CMGC Contracting at UDOT
CMGC Contracting at UDOT
CMGC Contracting at UDOT
CMGC Contracting at UDOT
CMGC Contracting at UDOT
CMGC Contracting at UDOT
CMGC Contracting at UDOT
CMGC Contracting at UDOT
CMGC Contracting at UDOT
CMGC Contracting at UDOT
CMGC Contracting at UDOT
CMGC Contracting at UDOT
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

CMGC Contracting at UDOT

800

Published on

Carlos Braceras presented to the Nevada Transportation Board about how UDOT is using CMGC.

Carlos Braceras presented to the Nevada Transportation Board about how UDOT is using CMGC.

Published in: Business, Technology
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
800
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
4
Comments
0
Likes
1
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. CMGC Contracting at UDOT Carlos Braceras, P.E. Deputy Director
  • 2. Why CMGC? • Deliver the Best Value Project • Owner Makes Informed Decisions • Exceed Public Expectations • Optimize Innovations • Risk Assessment & Management
  • 3. UDOT Committed Funds by Delivery Methodby Year of Advertisement Date ($ in Millions) $1.85B $800 9 $700 8 $600 223 $500 71 5 DBB 12 6 100 DB $400 128 106 136 CMGC $300 $200 $100 9 3 6 4 3 11 3 $0 2006 2007 2008 2009 2010 2011
  • 4. UDOT Development of CMGC CMAR Concept CMGC Concept Owner Owner Contract Manager Designer ContractorAt-Risk Subs Designer Specialty Sub Specialty SubContractor
  • 5. CMGC Team Approach• Partnering• Build Trust CMGC Team• Project Challenges All Identified Contractor UDOT Designer• Contractor Bids Actual Line Items
  • 6. Fair Price Strategy • Engineer’s Estimate Typically based on State Averages • Contractor’s Estimate Prepared for specific project bid items Typically based on production rates and unit price • Independent Cost Estimate (ICE) Cost Validation Reflects Current Market Conditions
  • 7. MVC Project Overview• Salt Lake County (2010 to 2013) CMGC 15 mile segment Two lanes in each direction• Utah County (2010 to 2011) Low bid 3 mile segment Two lanes in each direction
  • 8. Phased Approach
  • 9. Phased Approach
  • 10. Phased Approach
  • 11. Preconstruction Phase
  • 12. Results – Reduced Construction Cost100% 90% $276 $287 $350 $403 80% 70% 60% 50% $249 $259 $307 $346 OPCC1 40% OPCC2A 30% OPCC3 20% OPCC4 10% $228 $232 $269 $285 0% $200 $225 $250 $275 $300 $325 $350 $375 $400 $425 $450
  • 13. Benefits of CMGC • Deliver the Best Transportation Project at the Best Value • Owner Makes Informed Decisions • Optimize Innovations • Risks Managed Throughout Project Delivery
  • 14. Reference Materials & Questions UDOT Annual CMGC Reports, and other related documents available online at udot.utah.gov
  • 15. CMGC Contracting at UDOT Carlos Braceras, P.E. Deputy Director

×