Asphalt Conference Presentation Mar 2012

827 views
738 views

Published on

Carlos Braceras gave this presentation at the Ashpalt Conference on March 27, 2012.

Published in: Business
0 Comments
3 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
827
On SlideShare
0
From Embeds
0
Number of Embeds
24
Actions
Shares
0
Downloads
3
Comments
0
Likes
3
Embeds 0
No embeds

No notes for slide

Asphalt Conference Presentation Mar 2012

  1. 1. Utah Statewide Growth Trends
  2. 2. Strategic Goals Take care of what we have Preserve InfrastructureMake the system work better Optimize Mobility Improve safety Improve Safety Increase capacity Strengthen the Economy
  3. 3. Preserve Preserve Infrastructure Infrast
  4. 4. Pavement Conditions
  5. 5. 3 Maintenance Levelsto Prioritize ResourcesInterstate and Level 1 • 53% of all State Highway Lane Miles • 96% of all Vehicle Miles Traveled on State SystemLevel 2 • Less than 2,000 vehicles per day
  6. 6. Condition of Utah StateRoads • Overall Condition of UDOT Highways are Good • Majority of Roads in Poor Condition are Low Volume/Rural (Level 2)
  7. 7. Pavement Condition Historical – Projected (Interstate – 935 miles) (Level 1 – 2,185 miles) Ride Quality - Projected with 60 million / year Ride Quality - Projected with 90 million / year 100% 100% 90% 90% 80% 80% 70% 70% 60% 60% % of Miles% of Miles 50% 50% 40% 40% 30% 30% 20% 20% 10% 10% 0% 0% 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 % Good: IRI < 95 % Fair % Poor: IRI > 170 Upper & Lower Threshold Band (95 to 98%) % Good: IRI < 95 % Fair % Poor: IRI > 170 Upper & Lower Threshold Band (90 to 95%)
  8. 8. Pavement Condition Historical – Projected (Level 2 – 2,735 miles) Ride Quality – Projected at Current Funding Levels 100% 90% 80% 70% 60%% of Miles 50% 40% 30% 20% 10% 0% 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 % Good: IRI < 95 % Fair % Poor: IRI > 170 Upper & Lower Threshold Band (80 to 90%) Over 500 centerline miles in poor condition today At current funding levels, poor condition roads double by 2020
  9. 9. Pavement Condition Historical – Projected (Level 2 – 2,735 miles) (Level 2 – 2,735 miles) Ride Quality – Projected at Current Funding Levels Ride Quality - Projected with an Additional 40 million / year * 100% 100% 90% 90% 80% 80% 70% 70% 60% 60% % of Miles% of Miles 50% 50% 40% 40% 30% 30% 20% 20% 10% 10% 0% 0% 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 % Good: IRI < 95 % Fair % Poor: IRI > 170 Upper & Lower Threshold Band (80 to 90%) % Good: IRI < 95 % Fair % Poor: IRI > 170 Upper & Lower Threshold Band (80 to 90%) * Governor’s proposed 2013 budget
  10. 10. Condition of UDOT Bridges
  11. 11. Age Distribution
  12. 12. Optimize Optimize Mobility Mobility
  13. 13. Delay Along the Wasatch Front Davis, Weber, Salt Lake & Utah Counties
  14. 14. Mountain View Corridor  15 miles under construction  All 22 bridges and structures complete or underway
  15. 15. Mountain View Corridor  Sections of pavement, curb, gutter, and trails placed  Completion date – December 2012 Midas Creek Dec. 2011 Midas Creek at the start of construction
  16. 16. I-15 CORE  24 miles, 10 interchanges, 63 bridges  35-month schedule makes this the fastest billion-dollar project in U.S. history  On schedule for Dec. 2012 completion
  17. 17. Construction Progress  75% complete  95% of traffic on new concrete  2 million square yards of concrete placed
  18. 18. Southern Parkway
  19. 19. Southern Parkway  I-15 to airport complete  7 miles of new road  Future – St. George Airport to Sand Hollow Reservoir
  20. 20. West Davis EIS began: Jan 2010 EIS funding: $8 mil Aug 2010 - 46 Alt
  21. 21. West Davis Sept 2011 8 alternatives and options 9 Open houses 5,000 public comments Draft EIS late summer 2012
  22. 22. Hours of use Annual User Hours and Cost Savings
  23. 23. Improve Safety Improve Safety
  24. 24. Zero Fatalities A Goal We Can All Live With
  25. 25. Interstate Serious Injury and Fatal Crashes Engineering Solutions | Saving Lives
  26. 26. Interstate Serious Injury and Fatal Crashes Involving a Vehicle that Crossed the Median vs Total Miles of Cable Barrier Installed
  27. 27. Strength Strengthen Econom the Economy
  28. 28. Economic Impact Number of contractor and consultant companies (P rimes and S ubs ) 602 Private sector employees associated with current construction projects 13,063
  29. 29. Strengthen the Economy
  30. 30. Accelerated Techniques
  31. 31. Accomplishments 2012Finishing 28 projects worth more than $3 billion

×