Complete testing@uma

  1. 1. MANUAL TESTING1) Q. Why did you choose testing ?Ans: 1) Scope of getting the job is very very high. 2) No need of depend upon any technology. 3) Testing is going to be there forever. 4) I want consistence through out my life.2) Q. What exactly we need to get a job?Ans: 1) Stuff 2) Communication skills [reading+ writing + speaking+ lesion] 3) Confidence 4) Dynamism3) Q. Why explicitly the test engineers are been recruiting in to the softwarecompanies?Ans: 1) Once person cannot perform two tasks efficient at a time. 2) Sentimental attachments.4) Q. Who can get testing job?Ans: Any graduate who is creative can get testing job very easily5) Q. Why explicitly the testing engineers are been recruited into the softwarecompanies?Ans: 1) One person can’t perform two task efficiently at a time. 2) Sentimental Attachment. • PROJECT:- Project is something that is developed based on the particular customersrequirements and used by that particular customers only. 1
  2. 2. • PRODUCT:- Product is something that is developed base on the companies specification and used by the multiple customers.NOTE:- The company will decide the specification by picking the common requirements ofcustomer.6) Q.Classical definition of quality?Ans: Quality is defined has justification of all the requirements of a customer in a product.NOTE: Quality is not defined in the product it is defined in the customer mind. • DEFECT: Defect is defined as deviation from the requirements.7) Q. Latest definition of quality?Ans: Quality is defined as not only the justification of the requirements but also presence ofthe value [value ..means ..user friendly]8) Q. What is testing?Ans: Testing is a process in the defects are Identified, Isolated[separately],Subject forRectification[sending] Ensure that the product is defect free in order to produce a qualityproduct in the end and hence customer satisfaction.9)Q. What is bidding the project?Ans: Bidding the project is defined as request are proposal, estimation and signingoff(official-agreement). • KICK OF MEETING:- Kick off meeting is the initial meeting conducted in the software company soon after the project is signed off in order discuss the overview of the project once select project manager for that project. Us ally • High level management [HLM] • Project managers [PM] • Quality managers [QM] • Technical managers [TM] • Development leads & Test leadsWill be involved in this meeting Apart from them many times customer representations also 2
  3. 3. Will be involved in this meeting.NOTE:- Apart from this meeting any other start up meeting in also called as “kick offmeeting”. • PIN [ Project Initiation Note]:- PIN It is a mail prepared by the project manager and sent the CEO of software company as well as to all of his core team members in order to intimate then that they are about to start the actual project activities. CEO=Chief Executive Officer COO=Chief Of Officer SDLC [Software Development Life Cycle]:- It contains 6 Phase • Initial or Requirement Phase • Analysis Phase • Designed Phase • Coding Phase (or) Programming phase • Testing Phase • Deliver and maintenance PhaseInitial or Requirement Phase:- Task:-Interacting with the customer and gathering the requirements. Roles:- i) Business Analyst [BA] ii) Engagement manager [EM]Process:- First of all the Business Analyst can Appointment . from the customer, collectsthe template from the company meet the customer an the appointment date gathers therequirements with the help of the template and come back to the company with therequirement documentary. The Engagement manager will go through the requirements document. If at all hefinds any extra requirements hence he will deal with the excess cast of project. If it is anyconfession of requirements then the will ask the consult team to develop the prototype hewill demonstrates to the customer gather the clean requirements and finally hand over therequirements document to the business analyst.Proof:- Proof of this phase is “Requirements Document”. 3
  4. 4. This document is called with different name in different companies FRS (Functional Requirements Specification) CRS (Client or Customer Requirements Specification) URS (User Requirements Specification) BDD (Business Design Document) BD (Business Document) BRS (Business Requirement Specification)NOTE:-Some companies may maintains two documents in the initial phase, one is for Highlevel business flow information and the other in for Detail function information. But some companies may maintains both the intimation in a single document. • Template:- Template in a predefined format which is used for preparing the document easily and perfectly • Prototype:- Prototype is a roughly and rapidly developed model which is used is for demonstration to the customer in order to gather the clear requirement and also to win his confidence of the customer.Analysis phase:-Task:- • Feasibility study • Tentative planning • Technology selection & Environment conformation • Requirement analysisRoles:- • System Analyst [SA] • Project Manager [PM] • Team &Technical Manager [TM]Process:-Feasibility study:- (possibility) It is a detailed study conducted on requirement in order toconform whether all of those requirements are possible with in the given time budget andresources are not. 4
  5. 5. Tentative planning (Temporary):- The resource planning as well as scheduling will betemporary planned section.Technology selection & Environment conformation:- The list of all the technologies thatare required to accomplish this project successfully will be enlisted as well as the clientenvironment will be conformed here in this section.Requirement analysis:- The list of all the requirements that are required by the companylike human resource , software and hardware to accomplish that project ,successful will beenlisted and mentioned here in this section.Proof: The proof document if the analysis phase is SRS (System RequirementSpecification )Designed Phase:-Task:- i) High Level Designing [HLD] ii) Low Level Designing [LLD]Roles:- i) Chief architect (CA) : is responsible for high level designing. ii) Technical Lead (TA): is responsible for low level designing.Process:- The chief architect will divided whole project into modules ,by drawing somediagrams using a language UML(Unified Modeling Language)  The technical lead will divided the modules into sub modules by drawing some diagrams using the same UML.  Apart from this takes GUI design also will be done in this phase.  Some time pseudo code also will be developed in this phase.Proof:- The proof document of this phase is TDD (Technical Design Document) • Pseudo code:-It is set of English statement which used for developing in the actual code very easily and comfortably.Coding Phase:-Task:- coding (or) programmingRoles:-Developers (or) programmingProcess:- The developers will develop the actual source code with the support of technicaldesign document as well as by following the coding standards. 5
  6. 6. Example for coding standards:  Proper indentation  Color coding.  Proper commenting.Proof:- The proof document of the coding phase SCD (Source Code Document).Testing phase:-Task:- TestingRoles:- Test engineersProcess:-  Test engineers will receive the requirement document and will start understanding the requirement.  While understanding the requirement if at all the get any doubt then they will list out all the doubt in the requirements clarification note and will send it to the author of the requirement doubt BA(Business Analyst).  Once the clarification are given if still more clarification are required then they will conduct a review meeting and will get all the clarification.  Once all the requirement are clearly understood then they will take the Test case template and will write the test cases.  Once the 1st Build is released they will execute the test cases.  If at all any defects are found they will list out then in the defect profile and will send it to the development department .  Once the next Build is released they will re execute the required test case.  If at all any more defect are found they will update the defect profile and will send it to the development department.  Once the next Build is released the same process will be continued.  This process will be continued again and again till the product is defect free.Proof:- The proof the testing phase is Quality Product . • Test Case:- If is an Idea of test engineer to test something based on the requirements. 6
  7. 7. Delivery & Maintains Phase:-Delivery:-Task:- Hand overring the application to the client .Roles:- Deployment Engineers or Installation EngineersProcess:- Deployment engineers will go to the clients place , install the application into theoriginal customer ,Environment and finally hand over’s the software to the customer.Proof:- The final official argument made between the company and the customer is theproof document this phase.Maintains:- Once the customer start using the application if at all any problem occurs thenthat problem will become the task ,based on the task corresponding roles will be appointed,these roles will define the process, solves the problem and final get the Application latter. Some customer many request for continuo’s maintenance in that situation thecompany will send a team of member to the customer place continuously in order to take careof that software.Q. where exactly testing comes in to picture? Which sort of testing you are expecting? How many sort or testing are there?Ans:- They are two sort of testing i) Un convectional testing. ii) Convectional testing.Un convectional testing:- It is a sort of testing in which the quality assurances people. Willcheck each and every role in the organization in order to conform weather they are doingtheir work according to the companies proper guidelines are not. Right form the staring of theSDLC to the end of it.Convectional testing:- It is a sort of testing in which the test engineers will check thedeveloped application (or) its related parts are working according to the expectation or notfrom the coding phase to the end of the “SDLC”Methods of the testing (or) testing techniques:- Basically there are two methods of testing. i) Black Box testing. 7
  8. 8. ii) White Box Testing (or) Glass Box Testing (or) Clear Box TestingBlack Box Testing:- It is a method of testing in which one will perform testing only on theFunctional part of an application with out on the having the knowledge of structural part. Usually the black box Test engineers will perform it.White Box Testing:- It is a method of testing in which one will perform testing on theStructural part of an application . Usually developers (or) White box testers will perform it.Gray Box testing:- It is a method of testing in which one will perform testing on both thefunctional part as well as the structural part of an application. Usually the test engineers who have the knowledge of structural part will perform it.Levels of Testing:- There are five levels of testing • Unit level testing. • Module level testing. • Integration level testing. • System level testing. • User acceptance level testing.Unit level testing:-Unit:- Unit is defined as smallest part of an application.(program) In this stage the white box testing will test each and every developed programand also the combination of programs.Module level testing:-Module:- Module is defined as a group of related features to perform a major task in theapplication. In this stage the Black box test engineers will test the functional part of themodule.Integration level testing:- In this stage the developers of will develop someinterface(linking program) in order to integrate the modules this interface will be tested bywhite box testers. Developers will follow any one of the approaches white integration themodule. 8
  9. 9.  Top down approaches  Bottom up approaches  Hybrid approaches (or) Sand rive approached  Big-Bang approaches • Top down approaches:- In this approaches the parent modules will be developed first and then the corresponding child modules will be developed and integrated.STUB:- While integrating the modules in top down approach if at all any mandatorymodules are missing then that mandatory modules will be replace with a temporaryprogram. 9
  10. 10. • Bottom up approach:- In this approached the child modules will be developed first and will be integrated to the corresponding parent modules.DRIVER:- While integrating the module in bottom up approached if at all any mandatorymodules is missing then that modules is replaced with a temporary program “DRIVER” • Hybrid approach (or) San drive approach:- This a mixed approach of Both top down and bottom up approaches. 10
  11. 11. • Big-Bang approach:- In this approach one will wait till all the modules are developed and finally will integrate then at a time.System level testing:-System:- Once the software application is installed in to an environment then as a whole wewill call it as a system. In this stage the block box test engineers will conduct many type of testing likeload testing, performance testing, stress testing, comparability testing, system integrationtesting……..ect. • System integration testing:- It is a type of testing in which on will perform some action on module and check for the reflections in all the related are as of the application.User acceptance level testing:- In this stage the block box test engineer will perform testingon the user desired areas in the presence of accept the application happy.Environment:- Environment defined as group of hardware compounds with some basicsoftware (OS) where one can install the Presentation Logic, Business Logic, Data BaseLogic. [or] Environment defends as combinations of three layer that is PresentationLayer, Business Layer, Data Base Layer. Where once can install the Presentation Logic,Business Logic, Data Base Logic. 11
  12. 12. Type Of Environment:-  Stand Alone Environment (or) One Tier Architecture.  Client Sever Environment (or) Two Tier Architecture.  Web Based Environment (or) Three Tier Architecture.  Distributed Environment (or) N-Tier Architecture.Stand Alone Environment (or) One Tier Architecture:- In this environment only one tier will be there. Presentation layer, business layer,data base layer will be present in the same tier. When ever the application need to be used by single user at timethen environment will be suggested.Client Sever Environment (or) Two Tier Architecture:- In this environment two tier willbe there .one is for client and another is for data base server. Presentation layer and thebusiness layer will be available is each and every client and the data base player will bepresent in data base server. When ever the application need be used single premises and there is noproblem with the security of the. Business logic as well as the application need accessed veryfast lye then this environment be suggested. 12
  13. 13. Web Based Environment (or) Three Tier Architecture:- In this environment three tier willbe there one is for clients, the middle is one is for application sever and the other is for database sever. presentation layer available in the client business layer will be available in theapplication server. data base sever. When ever the application need to be used all over the world by limitednumbers of user and wounds the business logic will be secured and function updaters to beeasily them the in environment can be suggested. 13
  14. 14. • WEB SERVER:- Web server is a software which provides web services to the client. EX:- IIS(Internet Information Services)Distributed Environment (or) N-Tier Architecture:-This environment is same as webenvironment more the one application sever is introduced in separate hers in order todistributed the load and increase the performance. When ever the application needs to be use by huge number of user then thisenvironment can be suggested. • THIN CLIENT:- If at all the client machine is having only the .presentation logic then it is know as thin client. • THICK CLIENT:- If at all the client machine is having both presentation logic as well as business logic then it is known as thick client. • APPLICATION:- It is a Presentation Layer, Business Layer, Data Base Layer.SOFTWARE DEVELOPMENT PROCESS MODELS:-  Waterfall Model  Prototype Model  Evolutionary Model  Spiral Model  Fish Model  V-ModelWaterfall Model:- 14
  15. 15. Phase Activity Outcome REQ & INTIAL GATHER BRS INGNG SYS, ANALYAIA SRS DESIGN S/W DESIGN TDD,GUI DESIGN UNIT TEST UTR IMPLIM CODING ENTATI INT .TEST ITR ON MTR MOD TEST BLOCK STR TESTING SYS TEST BOX UATR TESTING UATDELIVER & DELIVERY TO CLIENTMAINENENCE Advantages:- It is a simple model and easy to implement. Project Monterey and maintains is very easily. Draw Back:- Can’t accept the new requirements in the middle of the process. Prototype Model:- 15 CLIENT ENVIRONMENT SRS DOC. BASED LINED CONFORMATION S/W PROTOTYPE PROTOTYPE REQ. UN CLEAR H/W PROTOTYPE BRS DOC. BASE LINED DEMO TO CLIENT DEMO TO CLIENT REQ. ARE REFINED
  16. 16. Advantage:- when ever the customer is not clear with his requirement. Them this is bestsuitable modelDraw Back:- Is not a compiled develop process model. It’s a still time consumer model. Company should where the cost of prototype User may limit requirement by sticking into the project.Evolutionary Model:- 16
  17. 17. INITIAL REQ. FEED BACK WITH N NEW REQ. DEVELOP OAPPLICATION USER USER VALEDATION ACCEP T YE S APPLICATION BASE LINE Advantage:- when ever the customer is evolution the requirement then this is the Best suitable model Draw Back:- time consuming model Costly model Deed lines can’t properly define. No transference. Project monetary any maintenance is very difficult. Spiral Model:- 17
  18. 18. 1) DEINING THE OBJECTVES /WORK ANALYSIS/CONSTRAINTS4)REFINIG &PLANNING 2) RISK ROOTFOR THE NEXT CYLE CAUSE ANALYSIS ESTIMATION 3) IMPLEMENATION CONTINGENCIESAdvantage:- When ever the project highly risk based then this is the best suitable model.Draw Back:- Time consuming model. Costly model. Risk root cause analysis is nota easy task.Fish Model:-REQ ANAYSIS DESIGN CODING DELIVERYMAI-GATHERING SYSTEM Testing Maintan 18
  19. 19. SRS HLD SCDBRS REVIEW LLD BLOCK Box Testing Test S/W SRS REVIEW TDD REVIEW WHIT BOX TESTING ChangesAdvantage:- As both the verification are done the outcome will be a quality product. Draw Back:- Time consuming. Costly model.V-Model:-Verification ValidationINITIAL & BRS PREPARING PROJECT PLANNINGANALYIS SRS PREPARING TEST PLANNINGDESIGN & TDD DESIGN PHASE TESTINGCODING SCD PROGRAM PHASE TESTINGTESTING S/W BUILD SYSTEM TESTING TEST MANAGEMT PROCESS USER ACCEPTANCE TESTINGDEVIVER & PORT TESTINGMANINTENANCE S/W EFFICIENCY DRE= A TEST S/W CHANGS A+BA= Defects found by the testing team.B= Defects raised by the customer.Advantage:- As both the verification and validation is done and test management process ismaintained. The outcome will be quality product.Draw Back:- It is time consuming model. It is a costly model. • Verification:- Verification is a process of checking whether the product is being developing in a right manner or not. • Validation:- Validation is a process of checking whether the develop product is right or not. 19
  20. 20. TYPE OF TESTING:- • Build acceptance testing (or) Build verification testing (or) Sanity testing • Regression testing • Re testing • Half- testing • B-testing • Static testing • Dynamic testing • Instillation testing • Compatibility testing • Exploratory testing • End-To-End Testing • Security testing • Usability testing • Reliability testing • Mutation testing • Adhoc testingBuild acceptance testing (or) Build verification testing (or) Sanity testing:- It is a type of testing in which one will conduct overall testing one the released build inorder to conform where the proper of not for conducting detailed testing In this type of testing us ally they check the following. 20
  21. 21. i) Weather the build can be properly installed in to environment or not ii) Weather one can navigate to all the pages of the application or not. iii) Weather all the important feature are available or not. iv) Weather all the requirement connections are properly established or not. In some company they will call this types of testing as Smoke testing alsobut in some companies they say that just before releasing the build the developer will checkweather the build is proper or not i.e. know as Smoke testing. Once the build is released the testing engineers will once again check weatherthe build is proper or not i.e. knows as BAT (or) BVT (or) sanity testing.Regression testing:- It is a type of testing in which one will perform testing on the readytesting functionality again and again us allay it is done in two servicers. i) When even some defects are identified raised to the development department once the next build is released the testing engineers will check the defect functionality as well as the related functionality once again. ii) When ever some new feature are added i.e. the application next build is released to the testing department then the test engineers will check all the related feature’s of those new feature’s once again. NOTE: - Testing new features for the first time not regression testing. Some companies may do Random testing at the end that also will fall under regression testing only.Retesting: - It is a type of testing in which one will perform testing on the same functionalityagain and again with multiple sets of data in order come to a conclusion weather thefunctionality is working fine or not.NOTE:- i) Regression testing starts form the 2nd build and continue up to the last build. ii) Re testing starts from the 1st build and continuous up to the last build. 21
  22. 22. iii) During regression testing also re testing will be conducted that is the reason some people even call it as Re and Regression testing.Half testing: - It is a type of testing user accepting testing conducting in the soft warecompany by the test engineers just before the delivery.B-testing: - It is a type of testing user accepting testing conducting in the client place eitherby the end user (or) by the third party testing experts just before actual implementation of aapplication.Static testing: - It is types of testing in which one will perform testing on the application onits related factors without perform any action. EX: - GUI testing, Document testing, code--------------ectDynamic testing: - It is types of testing in which one will perform testing on the applicationon its related factors by perform some action.EX: - retesting, functionality testing…….ect.Instillation testing :- It is a type of testing in which one will trey to instillation theapplication by following the guide ling provided in the deployment document in order toconform whether those guidelines really suitable for instillation the application comfortable(or) not.Compatibility testing:- It is type of testing in which one will install the application intomultiple environment prepared with different .combation in order to check .whether it issuitable with those environment (or) not.Monkey testing: - It is type of testing in which one will intentionally perform some actionin order to check stability of the application.Port testing: - It is type of testing in which one will install the application into the originalcustomers environment and check whether it is comprisable with that environment (or) not.Exploratory testing:- It is type of testing in which Do many expert will check thefunctionality of the application which out having the knowledge of requirement just byparallel exploring the functionality. • Exploratory: - Have in the base knowledge of some concept doing something and more about it is knows as exploratory.End-To-End testing: - It is type of testing in which one will perform testing on all the end toend sceneries of the application. 22
  23. 23. Ex:- login Balance enquiry ----10,000 With draw -------3,000 Balance stmt ----------7,000 LogoutSecurity testing:- It is type of testing in which one will perform testing on the application inorder to conform whether it is properly protected (or)not. i) Authentication testing : It is a type of security testing in which one will enter different combination of user names and password .and check whether only authorized people are able to access the application (or)not. ii) Direct URL testing: It is type of security testing in which one will enter the direct URL’s if secured pages and check whether they access (or) not. URL [Uniform Resource Location] iii) Fire wall leakage testing (or)User realized testing :- It is type of testing in which one will enter into the application as a authorized user and will try to access bye and his limited in order to conform whether he can access (or)not.Usability testing:- It is type of testing in which one will check the user friendly of theapplication.Reliability testing (or) Socking testing:- It is type of testing in which one will use theapplication continues for long period of time in order to set the stability of the application.Mutation testing:- It is type of testing in which one will perform testing on the applicationor its related factors after doing some changes to them.Adhoc testing:-It is a type of testing in which one will perform testing on the application inthe there own style after understanding requirement very clearly. Us ally this type of testing will be encouraged after formal testing.SOFTWARE TESTING LIFY CYCLE (STLC):- STLC contain 6 phase i) TEST PLANNING ii) TEST DEVELEPOMENT iii) TEST EXECUTION 23
  24. 24. iv) RESULT ANALYSIS v) BUG TRACKING vi) REPORTTest planning:- Test plan is strategic document which contains some information thatdescribes how to perform testing on that application in a effective ,efficient and optimizedway. • Plan:- Plan is a strategic document which contain some information that describe how to perform task in a effective, efficient and optimization. • Optimization:- Optimization is a process are utilizing the available resources to their level best and getting the maximum possible out put.Index of test plan (or) Contents of test plan:-1.0) Introduction 1.1) objective 1.2) reference document2.0) Coverage testing 2.1) features be testing 2.2) features not be testing3.0) Test strategic 3.1) levels of testing 3.2) type of testing 3.3) test design techniques 3.4) configuration management 3.5) test metrics 3.6) terminology 3.7) automation plan 3.8) list of automated tools4.0) Base criteria 4.1) acceptance criteria 24
  25. 25. 4.2) suspension criteria5.0) Test deliverables6.0) Test environment7.0) Resources planning8.0) Scheduling9.0) Staffing and training10.0) Risk and consistencies11.0) Assumption12.0) Approval information1.0) INTRODUCTION:- • Objective: - Purpose of the document will be clearly described here in this section. • Reference document:- The list of the document that are referred will preparing this documents will be listed out here in this section EX: - SRS, Project plan2.0) COVERAGE TESTING:- • Features are tested: - The list of all the features with in the scope which are to be tested will be listed out here in this section. • Features not be tested:- The list of all the features that are not planed for testing will be listed out here in this section. EX:- i) Out of scope features ii) Low risk features iii) Features that are planed to be incorporated in feature iv) Features that are skipped based on the time constrains. 3.0) TEST STRATEGE:- (defines) Test strategic is an organization level term which is common for all theproject in that organization. • Test Plan:- Test plan is a project level term which is specific for that project only. 25
  26. 26. • Level of testing: - the list of all the levels of testing that are maintained in the company will be listed out here in this section. • Type of testing: - The list of all the type of testing that all perform in that company will be listed out here in this section. • Test design techniques: - The list of all the techniques that used in that company while designing test cases will be listed out here in this section. EX: - BVA, ECP • Configuration management:- • Test Metrics: - The list of all the metrics that are maintained on the company doing the test process will be listed out here in this section. Ex: - Defect Metric Test case Metric • Terminology: - The list of all the terms used in that company along with their meaning will be listed out here in this section. • Automation plan: - The list of all the areas that are planned for automation in that company will be listed out here in this section. • List of automated tools: - The list of all the automated tools that are used in that company will be listed out here in this section.4.0) Base criteria:- • Acceptance criteria: - When to stop testing will be clearly described in this section. • Suspense criteria: - When to suspense testing will be clearly described here in this section.5.0) Test deliverables: - The list of all the document that are to be developed of deliverydoing testing process testing process will be mentioned here on this section. 26
  27. 27. 6.0) Test environment:-The details of environment that is about to be used for testing will beclearly mentioned here in this section.7.0) Resource planning:- Who has to do what will be clearly described here in this section.8.0) Scheduling (or) Time planning:- The starting dates and ending dates of each and evertask will be clearly planed and mention in this section.9.0)Staffing and training:- To accomplish that project sues fully if at all any staffrequirement and if at all any training requirement then that detailed will be clearly mentionhere in this section.10.0) Risk and Continence:- This list of all the potential risk and continence solution planwill be clearly mentioned here in this section. Ex:- Employee may leave the company the middle of the project? Ans. Employee need to mint on benched. Unable to de clearly project with in the deadline project? Ans. Proper plan insurance. Costumer may impose the deadline? Ans. What not be tested should planned. Unable to test all the feature with in the given time? Ans. Priority based the execution.11.0) Assumptions: - The listed of all the think that are be assumed by the test engineer willbe clearly mentioned here in this section.12.0) Approached information:- Who has approval this document when it is approval willbe clearly described in this section.ii)Test development phase:- Requirement Documentation HLI LLI L USE CASES SCREEN SHORT 27
  28. 28. Use cases:- Use case describes of the functionality of certain application terms of action response. Login User Name Password Login Clear Cancel i) Functional requirement ii) Special requirement Functional requirement:-  Login screen should contain user name, password connect to fields login, clear, cancel button.  Connect fields is not mandatory but it should be allow user to select the data base option when ever require.  Upon entering valid user name, password and clicking on login button corresponding page must be displayed.  Upon entering in to any of the fields and clicking on clearly button all the fields must be cleared and courser should he display in the user name.  Upon clicking on cancel button login screen must be closed.Special requirement:-  Initial when ever the login page invoked login and when ever and clear button is disabled.  Cancel button must be all ways enable.  Upon entering some information in to and of the fields clear button must be enabling.  Upon entering some information in to both user name and password field’s login button must be enabling. 28
  29. 29.  Tabbing order must be user name, password, connect to, login, clearer, cancel.Use case template:- i) Name of the use case ii) Brief description of the use case iii) Action in valued iv) Special requirement v) Pre condition vi) post condition Vii)Flow conditionUse Case Document:-Name of the use case:- i) Name of the use case: Login use case ii) Brief description the use case: This use case describes the functionality of all the features present in the login screen. iii) Actors involved: Normal user and Add mine user. iv) Special requirement: two types  Explicitly requirement  Implicitly requirement • Explicitly requirement:- The requirement the explicitly given by the customer are know as explicitly requirement. • Implicitly requirement: The requirement that are analyzed by the business analyst which will add some value to the application with out disturbing any of the original customer requirements.Explicitly requirement:-  Install when ever the login page invoked login and clear button is disables.  Cancel button must be any way enable.  Open entering some information into any the field’s clear button must be enabling.  Upon entering some information into both user name and password field’s login button must be enable.  Tabbing order must be user name password connect to login clear cancel. 29
  30. 30. Implicitly requirement:-  Open entering invalid user name valid password and click on login button the following error message must be displayed. “Invalid user name please try again”.  Upon entering valid user name in valid password and click on login button following error message must be displayed. ”invalid password please try again”  Upon entering invalid user name invalid password and click on login button following error message must be displayed. ”invalid user name and password please try again”  Initial when ever the login screen is invoked the curser must be display on the user name fields. • Precondition:- login screen must available. • Post condition:- Either home page (or) add mine and error message for invalid user.Flow of events:- Two types i) Main flow ii) Alternative flowMain flow:- Action  Actors invoke the application.  Actors entrees valid user name valid password and click on login button.  Actors entrees valid user name valid password select a data base also and click on login button.  Actors entrees invalid user name valid password and click on login button.  Actors entrees invalid password valid user name and click on login button.  Actors entrees invalid user name invalid password and click on login button.  Actors entrees some information into any of the field and click on clear button.  Actors click on cancel button. 30
  31. 31. Response Application display the login screen with the following fields user name, password, connect to, login, clear, cancel. Authentication, application display either home page (or)admin page depending upon the actor entered. Authentication, application display either home page (or)admin page depending upon the actor entered with the mentioned data base connections . Go to Alternative flow Table 1 (Invalid user name) Go to Alternative flow Table 2 (invalid password) Go to Alternative flow Table 3 (invalid user name and password). Go to Alternative flow Table 4 (clear click). Go to Alternative flow Table 5 (cancel click). 31
  32. 32. Alternative flow Table 1:- Action  Actors enters invalid user name valid password and click on login button.Alternative flow Table 2:-  Actors enters in valid password valid user name and click on login button.Alternative flow Table 3:-  Actors enters invalid user name invalid password and click on login button.Alternative flow Table 4:-  Actors enter some information into any of the fields and click on clear button.Alternative flow Table 1:-  Actors click on the cancel button. 32
  33. 33. Response  Authentication, Application displace, the following error message invalid user name please try again.  Authentication, Application displace, the following error message invalid password please try again.  Authentication, Application displace, the following error message invalid user name and invalid password please try again.  Application clears all the fields’ login screen and displaces the cursor in the user name fields.  Application clicks the login screen.Guide line to be followed by test engineers soon after the receive the document :-  Identify the module to which the use case belong to? Ans: Security module  Identify the functionality of the use case with respect total functionality ? Ans : Authentication .  Identify the functionality point and prepare the functionality point document? Ans: Where ever user perform some actions on the application that is called functional point.  Identify the input requirement to perform testing ? Ans: Valid and invalid user name and password .  Identify the actors invalid ? Ans: Normal user and admin user.  Identify the weather the use case linked with any other use case ? Ans: Home pager and admin page use case. 33
  34. 34.  Identify the precondition? Ans: Login screen must be available  Identify the post condition ? Ans: Either home page and admin user and error.  Understand main flow of the application ?  Understand the alternative of the application?  Understand the special requirement ?  Document the test cases for the main flow ?  Document the test cases for the alternative ?  Document the test cases of special requirement?  Prepare the traceability matrix (or) curser reference matrix? • Functional point :- The point where the user can perform some action in the application is know as functional point. Testing process related document:- UCD FPD TSD DTCD DTDUse Case Functional Test Detail Test Defect PointDocument Point Scenario Case Document Document Document Document Traceability matrix :-It is a document which contains table of linking information used for traceability back for the reference in any kind of confusion (or)questionable situation. EX1:- (CTM) Complete Traceability Matrix. UCID TPID TSID TCID DID 3 4 8 10 2 6 99 86 36 3 20 30 45 55 4 34
  35. 35. EX2:- RTM ( Requirement Traceability Matrix). TCID REQUIREMENT ID1 1.02 1.03 2.04 2.05 3.0EX3:-DTM(Defect Traceability matrix). DTD TCID1 2.32 4.63 7.55 8.5Type of test case:- Test case are broadly divided in 3 types. i) GUI test case ii) Functional test case (two types) a) +Ve test case b) –Ve test case iii) Non-Functional test casesGuide line for the writing GUI test case:- Any idea a test engineer with which he feels that we can test something with out doing anyaction will follow under GUI test case. EX:- 35
  36. 36.  Check for the available of all the object .  Check for the consistence for the object.  Check for the allayment of the object  If at all the customer requirement are given.  Check for the spelling and grammar.Guide line for the writing the +Ve test case:-  Test engineer should have +Ve mind set.  He should consider the +Ve flow of the application  He must use only the valid input from the point of the functionality. 36
  37. 37. Requi Test Cat Prere Description Expected value Test data Actual valuer ego Test steps Resul Buil case ry quisit t d Noement Id e C00 • Invo 1 ke • Login • Login screen is Pass -NA- the screen display. +V appli should e catio be n. display LOT • All the objects available as per the LOT Pass • Chec • All the k for object the must be C00 avail available 2 -NA- login abilit y of screen as GU all for the • All the object I the LOT. are consisted objec with each other tive in login Pass scree n as • All the spelling for • All the are correct. the Objects LOT must be . consiste • Initially the C00 -NA- nt with cursor position • Chec 3 each in the connect to k for other. fields. the Pass GU • Login, clear, cano I nistic cancel button of all are to enable. the -NA- • All the objec spelling C00 t in Fail must be the 4 correct. login GU scree n. I • Initially • Chec • Clear button is the k for enable. -NA- cursor the must Fail spelli position C00 ng in in the 5 the user login name. 37 GU scree • Initially I n. login, -NA- • Chec clearly k for button the must be
  38. 38. LOT(Login Object Table):-S.No Object Name Object Type1 User name Text box2 Password Text box3 Connect to Combo box4 Login Button5 Clear Button6 Cancel Button VIT (Valid Input Table ) S.No User Name Password Excepted Actual Value Result Value Admin page 1 Suresh QTP Admin page Pass Home page 2 Nag Amal Nag home Pass page Home page Chiru home 3 Chiru Sridevi page Pass Ntr home Pass Home page page 4 Ntr Balakrishna Venky home Pass page Home page 5 Venky Illu Pass Admin page Admin page 6 Admin Admin 38
  39. 39. IVIT(Invalid Input Table) S.No User Name Password Expected Actual Value Result Page Invalid user 1 Sure Qtp name plz tray Admin page Fail again Invalid user 2 Chirutha Sridevi Plz entry pass name plz tray valid user again name 3 Ntr Balakr Invalid pass Plz entry password plz valid tray again Password 4 Nag Tab Invalid password plz Pass tray again Plz entry valid Invalid Password 5 Jvreddy JVR password plz Fail tray again Plz entry valid User Invalid user name 6 Upendra Anu name and Fail password plz tray again Invalid password plz tray again Guide line for the writing the –Ve test case :-  Test engineer should have –Ve mind set.  He should consider the –Ve flow of the application  He must at list one invalid input in each set of data.Test execution phase:- In this phase test engineer will do the following.  He will perform the action as it is described in the description Colum.  He will observer the actual behavior of the application. 39
  40. 40.  He will document observer value under the actual value Colum.Result analysis :- In this phase test engineer will compare the expected value with actual values andif both are matching they will decide result as pass other wise fail. If at all the test if not executed then they will decide the result as blocked.Bug tracking:- Bug tracking is processes which defect are isolate, identify, and managed.Def Te Issue Reprod B D Bu Vers Defe Defe Defect F Fi Fi Datect st descript ucible y at ild ion ct ct ix x x a ca ion e Resol da bu se Seve Prio ution B te ild Clo ID rity rity y ser Initially the C0 cursor is1 J 1 2.3.6 05 position v ed in the Not r connect applicab to filed . le Initially login and clear 1 2.3.6 Not button applicab2 are J C0 le. enable v 06 instead r of begin display. Upon clicking >Enter on clear some button informat 40
  41. 41. all the ion any field are of3 C0 clear but fields. 1 2.3.6 11 the cursor is >click nit on clear position button. in the J >observ user v e that all name r the filed. fields are cleared but the cursor is not display in the user name. Upon 1 2.3.6 entering user >Enter name,4 user passwor name d as per DVIT. C0 DIVT 14 and >Enter J clicking the v on login passwor r button d DVIT. correspo nding >Click error on login message button are not display >observ as per e that the correspo DIVT. nding error message is not 41
  42. 42. display the5 Upon DVIT. entering some 1 informat C0 2.3.6 ion 15 >Enter some only into user name filed only J into the v passwor Only r d filed.6 into 1 2.3.6 user name field (or) > C0 only observe 16 into that passwor login d filed button is login enable button instead is of being enabled display. J misted v of r display. 42
  43. 43. DIVIT(Defect Invalid Input Table)S.No User Name Password Expect Actual Value1 Suresh QTP Plz enter valid Plz enter valid user name user name Plz enter valid Plz enter valid2 Uma Jvr user name user name &password Plz enter valid3 Uprndra Anu Plz enter valid user name &password user name • Defect ID:- The sequence of the defect no will be mentioned her in this section. • Test case ID:- The test case id based on the which defect is found will be mentioned her in this section. • Issue Description:- What exactly the defect is will be clearly described here in this section. • Reproducible stops:- The list of all the step which are followed by the test engineer in order to identify the feature will be mention here in this section. • Defection By:- The name of test engineer who has the defect are defect in this section. • Defection Date:- The date are on which will be mention her in this section. • Defection Build:- The build number in which the defect will be mention in this section.Defection Version:- The version number in which the defect is found will be mention in this section. • Severity:- Severity describes the severity of the defect severity is classified in to 4 types. • Fatal (or) s1 (or) sev1 (or) 1. • Major (or) s2 (or) sev2 (or) 2. • Minor (or) s2 (or) sev3 (or) 3. • Suggestion (or) s4(or)sev4 (or)4.Fatal:- It at all the related to the navigational block on available by of main functionality then suchtype of problems are treated as fatal defects.EX:- Page Page Page Page Not openi 1 2 3 4 ng 43
  44. 44. Val1 Val2 ResultAddMajor defect:- If at all the problem are related to the working the major functionality them such typeof problem are treated a major defect. EX:- 10 Val 1 20 Val 2 Result -10 addMinor Defect :-If at all the problem some related to the and feel of the application then such type ofproblem are treated as minor defect.Ex:- Val 1 Val 2 Result BADSuggestion :- If at all the problem are related to the value of the application then such type ofproblems are treated as suggestion.Ex:- +Ve $ 44 Invalid entry please tray again Invalid entry please enter +Ve integer
  45. 45. Not user friendly message User friendly messagePriority :- Priority describes the sequence in which defect need to be rectify. Priority is classified in to 4 types. i) Critical (or) pri 1(or) p1 ii) High (or) pri 2(or) p2 iii) Medium (or)pri 3(or)p3 iv) Low (or) pri 4(or) p4  Generally the fatal defect will be given critical priority, major defect will be given, high priority, minor defect will be given medium priority, but dependence on the situation priority will be changed. Low severity high priority case:- When ever there is a customer visit all the look and feel defects will be given highest priorityeven though they are less serious. High severity low priority case:- When ever some part of model if development, reminding part is testing department, the test engineer will raise that part is fatal issue but the development will given low priority given it. HoldBug life cycle:- Require Rejected ment No As per design Developer Is it Is defect 45 really a Open really defect rectificati on If Application Testing defect Stop the testing Rectification New No Yes Closed Fixed
  46. 46. Yes Build 1 Build 2 Yes NoRe opened • New:- When ever the defect is newly identified by the test engineer then the status is new. • Open:- When ever the developer the accepts then • Deferred:- When ever the developer the accepts the defect but wants some time for rectifying the defect the will set the status is deferred. • Fixed:- When ever the defect is rectified the developer will set the status as fixed. • Reopened and Close:- Once the next build released the test engineer will check whether defect is relay rectified (or)not if at all they feel relay rectified then they will set the status as closed other wise reopened. • Hold:- When ever the developer is configured to accept or reject the defect they will set the status is hold. When ever the defect is hold status as they will be a meeting on that defect (Triage meeting) and if at all consoled as a defect the developer will open it other wise the tester will closed it. • Rejected:-When ever the developer is conformed it is not a defect there he will status is rejected. 46
  47. 47. When ever the defect is rejected status the test engineer will once again check if at all he also feels it is a not a defect then he will set the status as closed other he will reopened. • As per design:- (it is a rare case only) When ever the developer feels the tester has raised the defect with out having knowledge of latest requirement then he will check the status as As per design. When ever the defect in as per design status the test engineer will go to the new requirement if at all he also feel it is as per design only then he will set the status is closed other wise reopened.Reporting phase:-Classical Bug reporting process :- Test lead Develop lead Tester Developers Draw Back:-  Redundancy  Time consuming  No transparency  No securityCommon repository oriented bug repotting process:- Test lead Common repository Develop lead 47
  48. 48. Bug tracking tool oriented Bug Reporting process :- Common repository BTTBug tracking tools :- Bug tracking tool is soft ware application which can be accessed only by theetherized people which provides all the facility for bug tracking tools.EX:- Bug zilla, issues trackingTest closer Activity :- This a finely activity done in the process the test summary report whichcontain some following information . No.of cycles execution. Devotion in of each cycle. No.of test case are execution in which cycle. No.of test case are passed are failed . No.of defect are found in each cycle and extra.Way of testing:- there or two type. i) Manual testing. 48
  49. 49. ii) Automation testing.Manual testing:- Manual testing is a process in which all the phase of software testing life cycle liketest planning, test development, test execution, result analysis, bug tracking and report or accomplishsuccessful manually with human efforts.Draw back of manual testing:- • Time consuming. • Less accuracy. • Tiredness. • Simulations action are all most impossible . • Con’t repeat the same task again and again with some interest. • More no.of human resources are required. 49

×