The crown estate
Upcoming SlideShare
Loading in...5
×
 

The crown estate

on

  • 791 views

 

Statistics

Views

Total Views
791
Views on SlideShare
791
Embed Views
0

Actions

Likes
0
Downloads
4
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment
  • Water column Fisheries Rights to Oil, Gas and Coal Public rights of navigation

The crown estate The crown estate Presentation Transcript

  • 中英海上风能研讨会 Martin Simpson 马丁 · 辛普森 Head of Energy and Technology 能源与技术部主任 22 nd September 2011 2011 年 9 月 22 日 皇家产业(管理局) : 英国投标与 审核 程序 Sino- British Offshore Wind Power Workshop The Crown Estate: UK Bidding and Permitting Processes
  • 皇家产业(管理局) The Crown Estate Urban Estate 市区产业 Marine Estate 海洋产业 Rural Estate 乡村产业 Windsor Estate 温莎产业
  • 海洋产业 部
    • 850,000 km2 海 域
    • 22000km of coast line
    • 22000km 海岸线
    • A responsibility to enhance the estate’s value
    • 责 任之一是 提高产业的价值
    • Subject to good management and stewardship
    • 需要精于 管理 , 尽职尽力
    The Marine Estate
  • 能源商务活动 Wave and Tidal 波浪能与潮汐能 Gas Storage 天然 气储存 CO2 Storage CO2 储存 Offshore Wind 海上风能 Energy Business Activities
  • 英国海上风能计划
    • Rounds 1&2 including Extensions and Demo’s
    • 第 1&2 阶段 , 包括扩 建 部分和示范
      • 1.5 GW operational
      • 1.5 GW 在运行
      • 2.7 GW under construction (8 projects)
      • 2.7GW 在建项目( 8 个项目)
      • 3 projects consented, pre-construction (up to 1 GW )
      • 3 个 核 准 , 施工前准备(达 1GW )
      • 4 projects awaiting consent (up to 1.3 GW)
      • 4 个项目待 核 准(达 1.3GW )
      • 8 projects pre-application (up to 2.9 GW)
      • 8 个项目准备申请 核 准(达 2.9GW )
    • Scottish Territorial Waters (STW)
    • 苏格兰领域水域
      • 5 projects active in pre-application (up to 5 GW)
      • 5 个项目准备申请 核 准(达 5GW )
    • Round 3
    • 第三阶段
      • 32 GW in development
      • 32GW 在 开发
    • R3 focus is
    • 第三阶段重点是:
      • Renewable energy targets
      • 可再生能源目标
      • Jobs
      • 就业
      • Scale and programme
      • 规模与规划
    UK Offshore Wind Programme
  • 产业 进展
      • Technology viability
      • 技术 可行性
      • System knowledge
      • 系统知识
      • Developing concepts
      • 发展理念
      • Developing relationships
      • 发展关系
    2000-2009 Pioneering Phase 示范 阶段 2009-2015 commercialising offshore 2009-2015 商业 化 海上 风电场 2015- Industrial Large scale GW offshore power plants 2015- 工业性大规模 GW 级 还剩风电场
      • Stimulating competition
      • 刺激性竞争
      • Applying lessons
      • 吸取教训
      • R&D & demonstration
      • 研发和示范
      • Scale
      • 规模
        • sourcing
        • 来源
        • knowledge base
        • 知识基础
      • Cost efficiency
      • 成本效率
        • technology development
        • 技术 发展
        • installation and O&M concepts
        • 安装和 O&M 理念
        • value chain engineering
        • 价值链工程
      • Component reliability
      • 部件的可靠性
      • Apply R&D & demonstration
      • 应用研发和示范
        • New concepts
        • 新理念
        • New materials
        • 新材料
        • New technology
        • 新技术
    Industrial Evolution
  • 第 3 阶段
    • Development in partnership with The Crown Estate to consent
    • 与皇家资产伙伴关系的开发
    • Shared development risk. Pre-consent co-funding > £100m. Contract obligations on programme and budget to consent. Competition criteria based on confidence in end-to-end delivery.
    • 同意分担开发风险。预先同意共同出资 > 1 亿英镑。
    • 签订规划的合同责任和批准的预算。
    • 竞争标准基于点到点递送信任
    • A zonal approach (exclusivity for development partner/consortium)
    • 分区方法(专有开发伙伴 / 联盟)
    • Assess cumulative impact, engage holistically with stakeholders, supply chain confidence, strategic supply chain development.
    • 评估 累积的效果,与利益相关方全程参与。
    • 供应链信任,战略性供应链开发
    • Direct intervention by The Crown Estate to promote and de-risk
    • 由皇家资产直接干预来促进和分担风险
    • Investment in enabling actions on national issues, master planning, workstreams on key risks, forums of developers and politicians.
    • 投资于能够采取行动的国家事务、总规划、重要风险工作流,开发商和政治家论坛
    The Round 3 Approach
  • Projec Approval . 项目审批 Apply for Consents 申请许可 Obtain Consents 获取许可 Option Notice Served 择买卖特权通告 Lease Commencement 租赁开始 Works Implementation 工作实施 Works Completion 工程完工 Zone Appraisal 区域评估 Agreement For Lease (AfL) Project A 租赁( Afl) 项目 A 协议 Zone Development Agreement (ZDA) 区域开发协议( ZAD) Zone Development 区域开发 From 2 yrs 从 2 年 From 1 yr 从 1 年 Typ. 1 yr 典型 1 年 Project Approval 项目审批 Typ. 50 yr 典型 50 年
    • Key Project Consents
    • 重要项目同意项
    • Planning Acts
    • 规划法规
    • IPC/ Marine Scotland
    • IPC/ 海洋 苏格兰
    • Marine Bill
    • 海洋法
    • Appropriate Assessment
    • 恰当评估
    Partner Development Actions Zone Appraisal & Planning 伙伴开发活动区评估和规划 Development Actions 开发行动 Option Period 选择 买卖的特权 期 Project Build 项目建设 Lease – Project A 租赁 - 项目 A Project Identification Project B 项目鉴定 项目 B Project Identification Project A 项目鉴定 项目 A Project Co 项目合作 Zone Partner 区域伙伴
  • 环境 评估和项目 审批 Project Concept 项目 概念 Consent Determination 审批决定 Consent Application 申请审批 Discharge Consent Conditions 发放审批条件 Pre-application 2 - 3 Years 预审核 2-3 年 Construction 3 Years 施工 3 年 Examination by Regulators 12 – 15 Months 审核 12-15 个月
    • Environmental survey
    • 环境勘查
    • Environmental impact assessment
    • 环境影响评估
    • Stakeholder /Public consultation
    • 咨询 利益相关方 / 公众
    • Resolution of objections
    • 异议决议
    • Mitigation planning
    • 减缓计划
    • Scheme adaptation
    • 规划改编
    • Submission of Docs
    • 递交文件
    Financial Investment Decision 1 – 2 years 投资决定 1-2 年
    • Pre-construction survey
    • 施工前勘查
    • Construction and post construction survey
    • 施工中和施工后勘查
    • Monitoring reports
    • 监测报告
    Environmental permitting
  • UK Pipeline Market Shares
  • 其他有关资料 http://www.thecrownestate.co.uk 海上风电场指南 英国海上风电报告 2011 迈向第 3 阶段: 海上风电供应链建设进展 Supporting Information