Your SlideShare is downloading. ×
6 maroc-final-aavb-aipcr
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Introducing the official SlideShare app

Stunning, full-screen experience for iPhone and Android

Text the download link to your phone

Standard text messaging rates apply

6 maroc-final-aavb-aipcr

1,387
views

Published on

Published in: Business

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,387
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
30
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. www.bouregreg.com PROJET D’AMENAGEMENT ET DE MISE EN VALEUR DE LA VALLEE DU BOUREGREG LA VALEE DU BOUREGREG® PROJET D’AMENAGEMENT ET DE MISE EN VALEUR DE PRESENTATION LION’SAIPCR PRESENTATION club OCTOBRE 2008 Octobre 2008
  • 2. LA ZONE D’INTERVENTION Oracle Certified Professional DU PROJET PROJET D’AMENAGEMENT ET DE MISE EN VALEUR DE www.bouregreg.com LA VALEE DU BOUREGREG®
  • 3. www.bouregreg.com LIMITE DE LA ZONE D’AMENAGEMENT DU BOUREGREG CONFORMEMENT AUX DISPOSITIONS DE LA LOI 16-04 Océan Atlantique Océ PRINCIPAUX REPERES SUPERFICIE GLOBALE 5.750 Ha Rabat Arrondissements urbains : ESPACE CONSTRUCTIBLE Hassan Youssoufia 15 km DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR Souissi 15% Commune rurale : Oum Azza PROFONDEUR VALLEE 15 Km DECOUPAGE Salé 6 SEQUENCES Arrondissements urbains : Lamrissa PHASE I Bettana H’ssaine SEQUENCES Commune rurale : 1&2 Shoul BUDGET ALLOUE 3.250 MDH Barrage sidi Med Ben Abdellah Lac 3 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 4. www.bouregreg.com ►VALLEE DU BOUREGREG : UN POTENTIEL IMPORTANT La vallée du Bouregreg est un site à caractère exceptionnel : DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR Par son échelle Par son patrimoine naturel et écologique Par ses qualités paysagères Par son patrimoine historique 4 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 5. OCTOBRE 2008 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR 5 www.bouregreg.com DE LA VALLEE DU BOUREGREG
  • 6. www.bouregreg.com ►VALLEE DU BOUREGREG : UN SITE AGRESSE ET MENACE La vallée du Bouregreg subit tous types d’agressions et se distingue par des caractéristiques physiques contraignantes: Très forte pollution atmosphérique et du fleuve ; DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR Déséquilibre de l’écosystème par la salinité de l’eau ; Risques d’inondations ; Mauvais drainage des eaux pluviales ; Versants instables ; Mauvaise portance des sols ; Habitat insalubre. 6 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 7. OCTOBRE 2008 ►PLAINE D’OULJA INNONDEE COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR 7 www.bouregreg.com DE LA VALLEE DU BOUREGREG
  • 8. www.bouregreg.com ►EXTENSION QUARIAT OULAD MOUSSA DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR 8 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 9. www.bouregreg.com ►URBANISATION ANARCHIQUE HAY YOUSSOUFIA DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR 9 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 10. www.bouregreg.com ►REJET DE LIXIVIAT DANS LE FLEUVE DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR 10 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 11. www.bouregreg.com ►DECHARGE D’AKREUCH :400 TONNES DE DECHETS/JOUR DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR 11 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 12. www.bouregreg.com ►DECHARGE ANARCHIQUE OULJA : 500 TONNES/JOUR DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR 12 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 13. www.bouregreg.com DE L’IDEE A LA REALISATION LA VALEE DU BOUREGREG® PROJET D’AMENAGEMENT ET DE MISE EN VALEUR DE Oracle Certified Professional AGENCE BOUREGREG SEQUENCE I, II,III, IV, V et VII
  • 14. www.bouregreg.com ►PARTI D’AMENAGEMENT GLOBAL Séquence I >Prenant en compte les composantes Séquence II urbanistiques, paysagères et Séquence III physiques du site, le parti d’aménagement global de la vallée du Bouregreg subdivise le site en six DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR séquences : Séquence I BAB AL BAHR >Séquence II AL SAHAT ALKABIRA (AMWAJ) >Séquence III KASBAT ABI RAQRAQ >Séquence IV SAHRIJ EL OUED Séquence IV >Séquence V AL MANZAH AL KABIR Séquence V >Séquence VI Séquence VI BOUHAYRAT AS SOUHOUL 14 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 15. www.bouregreg.com ►PLAN D’AMENAGEMENT SPECIAL SPÉCIFICITÉS DU PLAN URBANISATION EQUILIBREE ET DEVELOPPEMENT DURABLE D’AMÉNAGEMENT SPÉCIAL DE LA VALLÉE DU BOUREGREG ► Urbanisme respectant le patrimoine paysager et hydraulique de la vallée Transport Mémoire du lieu Citoyenneté Environnement ► Architecture tenant compte du climat local et des matériaux durables ► Toitures végétalisées et assurant la gestion des eaux de pluies DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR ► Optimisation des déplacements par un réseau de transport public multimodal SOUPLESSE DES RÈGLES D’UTILISATION DE SOL ET FLEXIBILITÉ DES USAGES POUR UNE MAÎTRISE DE LA QUALITÉ DU CADRE BÂTI COHESION SOCIALE ► Choix entre la hauteur maximale ou le ► Mixité sociale coefficient d’occupation du sol (COS) ► Liberté dans l’implantation des commerces ► Équipements socio-éducatifs et des équipements à l’intérieur d’un lot urbain PERRENISATION ET REHABILITATION DU ► Mixité des usages PATRIMOINE HISTORIQUE ET ARCHEOLOGIQUE ► Orientations architecturales non restrictives ► Sauvegarde du patrimoine par une réglementation appropriée et par une restauration soignée ► Développement urbain permettant des adaptations ► Intégration des axes et des cônes de vue des bâtiments historique dans la composition des projets urbains 15 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 16. AGENCE BOUREGREG INFRASTRUCTURES Oracle Certified Professional DE TRANSPORT PROJET D’AMENAGEMENT ET DE MISE EN VALEUR DE www.bouregreg.com LA VALEE DU BOUREGREG®
  • 17. www.bouregreg.com Plan de Circulation de la Vallée du Bouregreg Pont Moulay El Hassan Pont Moulay Youssef Pont Al Fida Pont Mohammed V *Source: Étude générale des Transports Semaly-CID 2005 Agence pour l’Aménage ment de la COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 18. www.bouregreg.com NOUVEAU PONT DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR MOULAY EL HASSAN PLUS QU’UN PONT UN TRAIT D’UNION 18 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 19. www.bouregreg.com DE LA VALLEE DU BOUREGREG ►NOUVEAU PONT MOULAY EL HASSAN ET VIADUC D’ACCES PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR 19 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 20. www.bouregreg.com …..Equipement rehaussant la valeur du site et du foncier NOUVEAU PONT My El Hassan DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR 1. La proposition de Marc MIMRAM a été retenu par le jury pluridisciplinaire en juin 2006. 2. Haut de 14 mètres, le nouveau pont permettra une navigabilité du fleuve Bouregreg jusqu’aux limites du pont de l’ONCF en amont. 3. Il offrira un tirant d’eau allant jusqu’à 11 mètres, hauteur largement suffisante pour l’accès des bateaux aux marinas du projet AMWAJ. 4. Les travaux de construction ont démarré en décembre 2007. En attendant la livraison de ce nouvel ouvrage à l’horizon 2010, le pont actuel a fait l’objet de travaux de réfection 20 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 21. www.bouregreg.com DÉCONGESTION DURABILITÉ ENVIRONNEMENT NAVIGABILITÉ SYMBOLIQUE INSERTION URBAINE TRANSPARENCE QUALITÉ ARCHITECTURALE 3 1 4 5 2 DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR PRIX GENERAUX 58 MDH LOT 1 668 MDH LOT 2 223 MDH COUT TOTAL 1.150 MDH LONGUEUR TOTALE 1.215 ML COFFRAGE 140.000 m2 TIRANT D’AIR 10 M ACIER 9.500 T BETON CLAIR DE HAUTES PERFORMANCES 67.000 m3 FONDATIONS 30 à 40 m 21 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 22. www.bouregreg.com …..LE VIADUC RELIE LE NOUVEAU PONT MOULAY EL HASSAN AU ROND POINT DE CARDONNA CREANT UNE ENTRÉE DE LA VILLE VERS L’EST SANS POUR AUTANT ÊTRE UN REMPART… DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR LARGEUR LONGUEUR MODULARITE 20 ML 611 ML Des pas de 21 Mètres POSSIBILITE D’UTILISATION POUR PARKING OU PERSPECETIVES D’INSERTION DU VIADUC PROGRAMME IMMOBILIER COMMERCIAL 22 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 23. www.bouregreg.com NOUVEAU My EL HASSAN PONT DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR MISE EN PLACE DES PALPLANCHES 23 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 24. www.bouregreg.com NOUVEAU PONT My EL HASSAN DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR RECEPAGES DES PIEUX 24 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 25. PIZZAROTTI ALPI DE CO Oracle Certified Professional TUNNEL DES OUDAYAS PROJET D’AMENAGEMENT ET DE MISE EN VALEUR DE www.bouregreg.com LA VALEE DU BOUREGREG®
  • 26. www.bouregreg.com …..Equipements enhancing the Whole project value TUNNEL Des OUDAYAS DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR 1. La réalisation du tunnel sous les Tranchée couverte : 56m Oudayas s’inscrit dans le cadre de la mise à niveau des infrastructures de transport de la Séquence 1, ce projet Tunnel au rocher : 311 m permettra le décongestionnement du Tranchée ouverte : 308 m site ainsi que la restitution de la Rampe: 246m place souk El Ghzel aux piétons Croisette : 1150 m Tranchée 1. Le maître d’ouvrage est l’Agence couverte: 67m pour l’Aménagement de la Vallée de Carrefour giratoire : 34m Bouregreg, qui mène ses opérations de construction en concertation et en collaboration étroite avec le Ministère de la Culture (passage sous les monuments historiques). 26 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 27. www.bouregreg.com DE LA VALLEE DU BOUREGREG ►TUNNEL DES OUDAYAS PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR Planning de réalisation CONTRAINTES 2007 2008 2009 2010 Mise en sécurité des bâtiments historiques Passage sous les bâtiments historiques Excavation et revêtement des galeries Excavation et revêtement des tranchées Interférence avec le tunnel existant Equipement du tunnel Dispositions particulières en matière Mise en service provisoire de sécurité et d’organisation - réaménagement place Souk El Ghzel Mise en service définitive 27 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 28. www.bouregreg.com TUNNEL Des OUDAYAS TRAVAUX D’EXCAVATION DU TUNNEL CÔTE OCEAN DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR 28 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 29. www.bouregreg.com TUNNEL Des OUDAYAS DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR MISE EN PLACE DES VOILES D’ETANCHEITE ET FERRAILLAGE 29 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 30. www.bouregreg.com TUNNEL Des OUDAYAS DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR TRAVAUX DE BETONNAGE DE LA GALERIE N°1 30 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 31. www.bouregreg.com TUNNEL Des OUDAYAS DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR INTERFERENCE AVEC LA GALERIE EXISTANTE 31 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 32. www.bouregreg.com TUNNEL Des OUDAYAS TRACE DU TUNNEL DES OUDAYAS Le projet du tunnel vise entre DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR autre à restituer la continuité historique entre la médina et les Sortie Oudayas, sachant que l’aménagement de la place El Ghzel en espace public est de nature à intégrer le site archéologique de Tachfine 32 Entrée COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 33. www.bouregreg.com TRAMWAY DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR RABAT-SALÉ LA VILLE EN MOUVEMENT 33 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 34. www.bouregreg.com …..Equipements enhancing the Whole project value TRAMWAY Rabat-Salé DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR 1. La réponse la plus appropriée à la problématique des transports en commun dans l’agglomération de Rabat -Salé avec une desserte pérenne, fiable et écologique des principaux pôles d’activité 2. Les deux lignes du réseaux prioritaires (2010) totalisent 19,5 Km avec un tronc commun de 1,5 Km. 3. L’Agence a engagé plusieurs concertation avec l’ensemble des parties prenantes dans ce projet pour cadre les implications institutionnelles, financières et MISE EN SERVICE Mars 2011 opérationnelles de ce projet structurant pour la capitale 34 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 35. www.bouregreg.com Tracé du réseau à long Terme Réseau à long terme avec deux traversées du Bouregreg et quatre lignes Pont Al Fida L4 bis ► lignes 1 et 2 Salé – Témara et Al Massira avec un tronc commun ► ligne 3 Akkrach - centre ville Rabat ► ligne 4 Salé Al Jadida– centre ville Rabat par Al Fida Agence pour l’Aménage ment de la COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 36. www.bouregreg.com ►RESEAU TRAMWAY RETENU : INTERMODALITE DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR 36 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 37. www.bouregreg.com ►CARACTERISTIQUES DU RESEAU RETENU CARACTERISTIQUES LIGNE 1 LIGNE 2 TRONC COMMUN LONGUEUR 11.7 Km 7.8 Km 2.9 Km SATIONS 22 14 5 DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR INTER STATIONS 560 m 600 m PASSAGERS 4050 Voy/H/S 4050 Voy/H/S 8100 Voy/H/S TPS PARCOURS 36 min 25 min VITESSE COM 18.5 Km/h 19 Km/h Bonne qualité de desserte des pôles émetteurs / attracteurs majeurs des 2 villes Bonne adéquation offre demande en capacité EXPLOITATION EQUILIBREE Exploitation adaptable indépendante du trafic voitures Évolutivité souple vers le réseau à long terme 37 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 38. www.bouregreg.com DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR TRAMWAY Rabat-Salé FRONTS OUVERTS AU 30 SEPTEMBRE 2008 38 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 39. www.bouregreg.com TRAMWAY De RABAT-SALÉ ETAT D’AVANCEMENT ETUDES PROJET % d’avancement % d’avancement Les études projets sont presque finalisées, y compris la ET DCE validation par le maître d’ouvrage 80% Plusieurs marchés travaux sont adjugés ou encours, avec des engagements à hauteur de 2 042 000 000 DHS HT: DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR Matériel roulant Plateforme et voie ferrée Ligne aérienne de contacts Signalisation ferroviaire Équipement Énergie Courants faibles DEVIATIONS DES RESEAUX % d’avancement Les travaux de déviations des réseaux ont débuté % d’avancement en mars 2007 (80 KM de réseaux à dévier) LIGNE 1 LIGNE 1 LIGNE 2 LIGNE 2 Les travaux sur la ligne 1 sont encours RABAT RABAT d’achèvement (90%) 90% 30% Les travaux de la ligne 2 avancent selon les plannings et seront finalisés décembre 2008 SALE SALE 90% 35% 39 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 40. www.bouregreg.com ETAT D’AVANCEMENT DES TRAVAUX TRAVAUX DE PLATEFORME 5 fronts de travaux sont engagés sur Rabat et Salé. DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR Les travaux réalisés concernent : Élargissement des voiries Terrassements Multitubulaire Massifs de ligne aérienne de contact Béton de fondation I. 3 fronts de travaux d’élargissement des voieries et de terrassement de la plateforme sont ouverts • Rabat – Avenue Al Alaouine • Rabat – Allal Al Fassi -Cité universitaire/Bab Al Irfane • Salé –Boulevard Mohamed V La Pose de voie ferrée et la II. Deux nouveaux fronts ont été ouverts fin juin 2008: soudure des rails est prévue • Rabat – Rue RIAD/Abou Inane pour fin octobre • Rabat – Boulevard Ibnou Khaldoun III. Deux autres fronts seront ouverts en octobre 2008: • Rabat – Avenue Nations Unies • Rabat – Avenue Patrice Lumumba 40 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 41. www.bouregreg.com TRAMWAY De RABAT-SALÉ ETAT D’AVANCEMENT RABAT : AV AL ALAOUIYINE - REALISATION DES COULAGE DU BETON DE FONDATION ET PREPARATION DE LA MULTITUBULAIRES ET DES MASSIFS DES POTEAUX DE POSE DES RAILS LAC DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR 41 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 42. www.bouregreg.com TRAMWAY De RABAT-SALÉ ETAT D’AVANCEMENT RABAT : AV IBN KHALDOUN / CERNAGE DES PALMIERS PHOENIX ET TRANSPLANTATION SUR LE MEME SITE RABAT : ALLAL AL FASSI – BAB AL IRFANE / TERRASSEMENT ET ELARGISSEMENT DES VOIRIES FINALISES – REALISATION DE LA MULTITUBULAIRE ET DES MASSIFS DE LAC DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR 42 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 43. www.bouregreg.com CENTRE DE MAINTENANCE HAY KARIMA TRAMWAY De RABAT-SALÉ ►Assure des fonctions multiples : remisage, maintenance, lavage, locaux d’exploitation, etc. DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR Allotissement retenu : ► Lot 1 terrassement : marché attribué à GTR, ► Lot 2 Bâtiments tous corps d’état, ► Lot 3 Charpente métallique, ► Lot 4 Voirie Réseaux Divers. ► Montant des travaux : ►Dates prévisionnelles de budget prévisionnel de lancement des travaux : 240 MDH TTC août 2008. 2008 Octobre APPEL D’OFFRES EN COURS 43 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 44. www.bouregreg.com TRAMWAY De RABAT-SALÉ ….. Le nouveaux design du matériel roulant conçu en collaboration avec le fournisseur « Alstom », est spécifique pour le projet de Tramway de Rabat Salé, avec une inspiration graphique marocaine déclinée sur DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR la livrée extérieure et intérieure des véhicules Des artistes marocains de renom ont été sollicités afin de décliner le thème du « Zellige » sur les rames du Tramway 44 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 45. www.bouregreg.com TRAMWAY De RABAT-SALÉ ….. Style « organique », constituée d’un mobilier porteur d’une image singulière et contemporaine. Les formes et matériaux reprennent les caractères de l’identité de Rabat : le végétal apporte ombrage et confort, les mats support des abris rappellent de manière très contemporaine les troncs d’arbres et l’omniprésence de la nature autour de Rabat, ainsi DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR que le savoir faire marocain dans le façonnage du métal. L’insertion urbaine du tramway comprendra 32 stations disposées tous les 500 m avec des longueurs de quais de 60m 45 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 46. www.bouregreg.com TRAMWAY De RABAT-SALÉ DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR PRESPECTIVE D’INSERTION : STATION MOHAMEMED V À SALÉ 46 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 47. www.bouregreg.com TRAMWAY De RABAT-SALÉ PRESPECTIVE D’INSERTION : STATION MELILIYA A RABAT DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR 47 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 48. www.bouregreg.com TRAMWAY De RABAT-SALÉ PRESPECTIVE D’INSERTION : AVENUE MY ISMAIL A RABAT DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR 48 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 49. www.bouregreg.com TRAMWAY De RABAT-SALÉ PRESPECTIVE D’INSERTION : AVENUE IBNKHALDOUN A RABAT DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR 49 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 50. www.bouregreg.com ►RAPPEL DE LA DEMARCHE DE LA VALLEE DU BOUREGREG PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR •L’Agence tend à convenir des modalités de financement de la totalité ou de parties du projet en essayant : d'établir et optimiser des montages de financement complexes, combinant des instruments financiers variés (titres, prêts de toutes natures), faisant souvent appel à plusieurs établissements financiers différents (pool de financement), en accordant une attention particulière tant à la limitation des risques financiers qu'à l'optimisation de la rentabilité. 50 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET OCTOBRE 2008
  • 51. COMMENT NOUS RECONNAÎTRE? CONSEIL D’ADMINISTRATION Octobre 2008 PROJET D’AMENAGEMENT ET DE MISE EN VALEUR DE www.bouregreg.com LA VALEE DU BOUREGREG®
  • 52. OCTOBRE 2008 COMITE DE SUIVI – ETAT D’AVANCEMENT ET BUDGET NOTRE CHARTE GRAPHIQUE PROJET D’AMENAGEMENT ET DE MSIE EN VALEUR 52 www.bouregreg.com DE LA VALLEE DU BOUREGREG