WATER USERS ASSOCIATION (WUA) REGISTRATION                  DETAILSName of   Total CCA     No. of    Area benefitedProject...
IRRIGATION PROJECTS IN PANCHMAHAL DISTRICTPanam Project Circle, Godhra      PANAM      HADAF      KARADKadana Project Circ...
Deputy Exe. Engineer &           PANAM PROJECT                  Office Superintendent  Personal Secretary                 ...
PANAM PROJECT CIRCLEPanam High Level Canal Project, Command Area:18000 ha., Estimated Cost: 200 Crore.Dam Safety works of ...
PANAM PROJECT CIRCLESantroad Weir : 2000 Ha. Command Area.Constg. of Big & Small Checkdams on River & drains ofPanchmahal ...
INDEX MAP   6
PANAM HIGH LEVEL CANAL PROJECT PANAM HIGH LEVEL CANAL – HEAD REGULATOR   7
PANAM HIGH LEVEL CANAL PROJECT         TUNNEL ENTRANCE     8
INAUGURATION OF TUNNEL BYHON. CHIEF MINISTER, GUJARAT                       Dt. 25/01/2009                                ...
10
EXCAVATION WORK   11
LEFT BANK MAIN CANAL   12
BRIDGE TYPE ROAD CROSSING   13
BOX TYPE ROAD CROSSING   14
VARIOUS OBSTRUCTIONS – HOUSES, WELLS, PROTECTED TREES                                                    15
HARD ROCKOVER BURDEN                          16
PANAM DAMLength of Masonary Dam – 189 m.Year of Construction - 197710 Radial Gates – Size: 14.93 m x 11.28 m.Max. Flood Di...
PANAM DAMVillages benefited - 132,Benefited Area- 36405 Ha.Length of Main Canal - 99.725 kmLength of Distriburoty & Minors...
PANAMyear 2004 : 3.56 Lacs cusecsMax. discharge released in the                               DAM                         ...
PANAMyear 2004 : 3.56 Lacs cusecsMax. discharge released in the                               DAM                         ...
PANAM DAMINSPECTION GALLARY                     21
PANAM DAM - DAM SAFETY WORKS              Cleaning of Drainage Gallery      Before...                              After.....
HADAF DAMLength of Masonary Dam – 89 m.       Year of Construction - 1986                     5 Radial Gates – Size: 14.95...
HADAF DAMBenefited villages–21, Benefited Area–5238 ha.Rehabilitation of 582 families of 7 villages.                      ...
HADAF DAM            25
KARAD DAMLength of Earthen Dam - 1019 m.Year of Construction - 1958Benefited villages- 25Benefited Area - 6190 ha.        ...
KARAD DAM                      Benefited villages- 25                      Benefited Area - 6190 ha.માટી બંધ પર અંશતઃ માટી...
KARAD DAM               Over flow on 09.09.2010  Fuse Gates                                         28
SANTROAD WEIR                       Length of Weir: 280 m.                                    Year of Construction : 2008 ...
PANAM PROJECT                                        No. ofSr.                   Taluka                       BenefitedNo....
PLANNED CROPPING PATTERN                            Tobacco 2%        Tw o Season Cotton 8%                               ...
MAJOR DISTRIBUTORIES OF PANAM PROJECTSr.       Name of       Off taking Length of    C.C.A.     Major CropsNo.      Distri...
Irrigation benefits given to affected people ofNarmada Project in Khajuri Colony under Panam Command                      ...
Obstructions in Irrigation ManagementMain canal from Ch. 0 to 30 km flows parallel to Panam River.Main Canal is contour ca...
Obstructions in Irrigation ManagementHeavy seepage from BankingChange of cropping pattern in the initial reach due to assu...
Frequent sliding of Rock debris in Main canal during monsoon.                                                             ...
Removal of Rock Debris                    AfterBefore                            37
Renovation works of CanalPanam Main Canal                                38
Renovation works of Canal                  Karad Main Canal                        After   Before
Renovation works of Canal                  Minor No.1                     After   Before
Renovation works of Canal                            41
Restoration of Structures             Karad Main Canal Ch. 3 KM
N.R.E.G.A. Works           Desilting work in          Panam Main Canal                               43
N.R.E.G.A. WorksKarad Main Canal
N.R.E.G.A. WorksKarad Canal
BIG CHECKDAM               RAMNATH                         46
BIG CHECKDAM               MOKAL                       47
SMALL CHECKDAM     Karada      48
DEEPENING OF PONDS                     49
DEEPENING OF PONDS              VILLAGE - UCHET
LIFT IRRIGATION SCHEME                BORIYAVI                           51
LIFT IRRIGATION SCHEME              SARADIA-DHAMNOD                                52
TRAINING           53
TRAINING           54
PARTICIPATORY IRRIGATION MANAGEMENTSr No    Name of Scheme   Total C.C.A. (Ha.)   No. of WUAs   Area (Ha.) 1      Panam   ...
PARTICIPATORY IRRIGATION MANAGEMENT                                      56
PARTICIPATORY IRRIGATION MANAGEMENT    Before               After                                      57
Upcoming SlideShare
Loading in...5
×

Panam Project Presentation

2,736

Published on

Presentation of Panam Project circle - T.M . Dholakia, Superintending Engineer

Published in: Education, Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
2,736
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Panam Project Presentation"

  1. 1. WATER USERS ASSOCIATION (WUA) REGISTRATION DETAILSName of Total CCA No. of Area benefitedProject (in Ha.) WUAs (in Ha.)PANAM 36405 40 12261KARAD 6190 5 727HADAF 5238 6 1935Total : 47833 51 14923 1
  2. 2. IRRIGATION PROJECTS IN PANCHMAHAL DISTRICTPanam Project Circle, Godhra PANAM HADAF KARADKadana Project Circle, D’ Colony KADANA BHADAR (P) KABUTARIVadodara Irri. Circle, Vadodara DEV SUKHI 2
  3. 3. Deputy Exe. Engineer & PANAM PROJECT Office Superintendent Personal Secretary CIRCLE, GODHRAPanam Project Division, Panam Irrigation Division, Quality Control Sub Godhra Godhra Division, Godhra Panam Dam Sub Division, Panam Irrigation Sub Panam Dam Division, Shahera Panam Project Sub Division Panam Irrigation Sub Division No.2, Godhra No.1, Morva (Rena) Irrigation Project Sub Panam Irrigation Sub Division Division No.2, Godhra No.2, Veganpur Koliyari Sub Division No.2, Panam Irrigation Sub Division Morva (Hadaf) No.3, Godhra 3
  4. 4. PANAM PROJECT CIRCLEPanam High Level Canal Project, Command Area:18000 ha., Estimated Cost: 200 Crore.Dam Safety works of Panam, Hadaf & KaradProjectsIrrigation Management and M & R of 100 km longPanam Main Canal, 800 km Network of Distributory& Minors.Panam Irrigation Scheme : 36405 Ha. CommandAreaKarad Irrigation Scheme : 6190 Ha. Command Area.Hadaf Irrigation Scheme : 5238 Ha. Command Area. 4
  5. 5. PANAM PROJECT CIRCLESantroad Weir : 2000 Ha. Command Area.Constg. of Big & Small Checkdams on River & drains ofPanchmahal District.Deepening of Big & Small Tanks of PanchmahalsDistrict.“Mahatma Gandhi National Rural EmploymentGuarantee Act” works Desilting in Canals, Jungle Cutting, Earthwork Checkdam DesiltingLift Irrigation SchemeRestoration of Stepwells. 5
  6. 6. INDEX MAP 6
  7. 7. PANAM HIGH LEVEL CANAL PROJECT PANAM HIGH LEVEL CANAL – HEAD REGULATOR 7
  8. 8. PANAM HIGH LEVEL CANAL PROJECT TUNNEL ENTRANCE 8
  9. 9. INAUGURATION OF TUNNEL BYHON. CHIEF MINISTER, GUJARAT Dt. 25/01/2009 9
  10. 10. 10
  11. 11. EXCAVATION WORK 11
  12. 12. LEFT BANK MAIN CANAL 12
  13. 13. BRIDGE TYPE ROAD CROSSING 13
  14. 14. BOX TYPE ROAD CROSSING 14
  15. 15. VARIOUS OBSTRUCTIONS – HOUSES, WELLS, PROTECTED TREES 15
  16. 16. HARD ROCKOVER BURDEN 16
  17. 17. PANAM DAMLength of Masonary Dam – 189 m.Year of Construction - 197710 Radial Gates – Size: 14.93 m x 11.28 m.Max. Flood Discharge – 356000 Cusecs. 17
  18. 18. PANAM DAMVillages benefited - 132,Benefited Area- 36405 Ha.Length of Main Canal - 99.725 kmLength of Distriburoty & Minors - 800 kmIrrigation started - 1980Canal bed Power House - 2 Mega wattRehabilitation of 42 effected villages 18
  19. 19. PANAMyear 2004 : 3.56 Lacs cusecsMax. discharge released in the DAM 19
  20. 20. PANAMyear 2004 : 3.56 Lacs cusecsMax. discharge released in the DAM 20
  21. 21. PANAM DAMINSPECTION GALLARY 21
  22. 22. PANAM DAM - DAM SAFETY WORKS Cleaning of Drainage Gallery Before... After... 22
  23. 23. HADAF DAMLength of Masonary Dam – 89 m. Year of Construction - 1986 5 Radial Gates – Size: 14.95 m x 10.64 m. Max. Flood Discharge – 162000 Cusecs. 23
  24. 24. HADAF DAMBenefited villages–21, Benefited Area–5238 ha.Rehabilitation of 582 families of 7 villages. 24
  25. 25. HADAF DAM 25
  26. 26. KARAD DAMLength of Earthen Dam - 1019 m.Year of Construction - 1958Benefited villages- 25Benefited Area - 6190 ha. 26
  27. 27. KARAD DAM Benefited villages- 25 Benefited Area - 6190 ha.માટી બંધ પર અંશતઃ માટીકામ કરવામાં આવેલ છે . 27
  28. 28. KARAD DAM Over flow on 09.09.2010 Fuse Gates 28
  29. 29. SANTROAD WEIR Length of Weir: 280 m. Year of Construction : 2008 Storage Capacity : 117 Mcft. Benefited Area 2000 ha. of 4 villages by Lift Irrigation. No Land Acquisition required. 29
  30. 30. PANAM PROJECT No. ofSr. Taluka BenefitedNo. District benefited Area (in Ha.) villages Lunawada 28 8150 Shahera 47 58891 Panchmahal Godhra 28 13264 Kalol 16 42142 Vadodara Savali 13 4888 Total :: 132 36405 30
  31. 31. PLANNED CROPPING PATTERN Tobacco 2% Tw o Season Cotton 8% Kharif Paddy 19% Rabi Vegetable 10% Kharif 65% Rabi 52%Oil Seeds/Pulses 3% Two Season 13% TOTAL 130% Kharif Hybrid Bajari 19% Rabi Wheat 27% Kharif Maize 10% Kharif Jow ar 2% 31
  32. 32. MAJOR DISTRIBUTORIES OF PANAM PROJECTSr. Name of Off taking Length of C.C.A. Major CropsNo. Distributory from Main Distry. (in Ha.) Canal (km) (km)1 Ladvel 31.94 11.90 2220 Paddy2 23/R Rabadia 38.30 4.04 2017 Paddy3 24/R Morva 52.81 8.45 3481 Paddy, Maize4 25/R Kabirpur 54.33 14.81 4554 Paddy, Maize5 29/R 71.80 11.14 1591 Paddy, Wheat6 32/R.A. 82.01 14.48 5099 Tobacco, Cotton, Wheat7 32/R.B. 83.16 14.00 1488 Wheat8 34/R Sansoli 92.05 5.20 1794 Maize 32
  33. 33. Irrigation benefits given to affected people ofNarmada Project in Khajuri Colony under Panam Command 33
  34. 34. Obstructions in Irrigation ManagementMain canal from Ch. 0 to 30 km flows parallel to Panam River.Main Canal is contour canal. One side is hill & Other side Panam RiverHigh banking of 12 to 20 m. 34
  35. 35. Obstructions in Irrigation ManagementHeavy seepage from BankingChange of cropping pattern in the initial reach due to assured irrigation. 35
  36. 36. Frequent sliding of Rock debris in Main canal during monsoon. 36
  37. 37. Removal of Rock Debris AfterBefore 37
  38. 38. Renovation works of CanalPanam Main Canal 38
  39. 39. Renovation works of Canal Karad Main Canal After Before
  40. 40. Renovation works of Canal Minor No.1 After Before
  41. 41. Renovation works of Canal 41
  42. 42. Restoration of Structures Karad Main Canal Ch. 3 KM
  43. 43. N.R.E.G.A. Works Desilting work in Panam Main Canal 43
  44. 44. N.R.E.G.A. WorksKarad Main Canal
  45. 45. N.R.E.G.A. WorksKarad Canal
  46. 46. BIG CHECKDAM RAMNATH 46
  47. 47. BIG CHECKDAM MOKAL 47
  48. 48. SMALL CHECKDAM Karada 48
  49. 49. DEEPENING OF PONDS 49
  50. 50. DEEPENING OF PONDS VILLAGE - UCHET
  51. 51. LIFT IRRIGATION SCHEME BORIYAVI 51
  52. 52. LIFT IRRIGATION SCHEME SARADIA-DHAMNOD 52
  53. 53. TRAINING 53
  54. 54. TRAINING 54
  55. 55. PARTICIPATORY IRRIGATION MANAGEMENTSr No Name of Scheme Total C.C.A. (Ha.) No. of WUAs Area (Ha.) 1 Panam 36405 35 11200 2 Karad 6190 05 730 3 Hadaf 5238 06 1950 TOTAL: 47833 46 13880 55
  56. 56. PARTICIPATORY IRRIGATION MANAGEMENT 56
  57. 57. PARTICIPATORY IRRIGATION MANAGEMENT Before After 57

×