• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Panam Project Presentation
 

Panam Project Presentation

on

  • 2,734 views

Presentation of Panam Project circle - T.M . Dholakia, Superintending Engineer

Presentation of Panam Project circle - T.M . Dholakia, Superintending Engineer

Statistics

Views

Total Views
2,734
Views on SlideShare
2,415
Embed Views
319

Actions

Likes
0
Downloads
0
Comments
0

7 Embeds 319

http://www.tmdholakia.com 272
http://apps.tradablebits.com 17
http://fence.tradablebits.com 16
https://jujo00obo2o234ungd3t8qjfcjrs3o6k-a-sites-opensocial.googleusercontent.com 6
http://jujo00obo2o234ungd3t8qjfcjrs3o6k-a-sites-opensocial.googleusercontent.com 6
http://panam.jalsampatti.com 1
http://www.docshut.com 1
More...

Accessibility

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Panam Project Presentation Panam Project Presentation Presentation Transcript

    • WATER USERS ASSOCIATION (WUA) REGISTRATION DETAILSName of Total CCA No. of Area benefitedProject (in Ha.) WUAs (in Ha.)PANAM 36405 40 12261KARAD 6190 5 727HADAF 5238 6 1935Total : 47833 51 14923 1
    • IRRIGATION PROJECTS IN PANCHMAHAL DISTRICTPanam Project Circle, Godhra PANAM HADAF KARADKadana Project Circle, D’ Colony KADANA BHADAR (P) KABUTARIVadodara Irri. Circle, Vadodara DEV SUKHI 2
    • Deputy Exe. Engineer & PANAM PROJECT Office Superintendent Personal Secretary CIRCLE, GODHRAPanam Project Division, Panam Irrigation Division, Quality Control Sub Godhra Godhra Division, Godhra Panam Dam Sub Division, Panam Irrigation Sub Panam Dam Division, Shahera Panam Project Sub Division Panam Irrigation Sub Division No.2, Godhra No.1, Morva (Rena) Irrigation Project Sub Panam Irrigation Sub Division Division No.2, Godhra No.2, Veganpur Koliyari Sub Division No.2, Panam Irrigation Sub Division Morva (Hadaf) No.3, Godhra 3
    • PANAM PROJECT CIRCLEPanam High Level Canal Project, Command Area:18000 ha., Estimated Cost: 200 Crore.Dam Safety works of Panam, Hadaf & KaradProjectsIrrigation Management and M & R of 100 km longPanam Main Canal, 800 km Network of Distributory& Minors.Panam Irrigation Scheme : 36405 Ha. CommandAreaKarad Irrigation Scheme : 6190 Ha. Command Area.Hadaf Irrigation Scheme : 5238 Ha. Command Area. 4
    • PANAM PROJECT CIRCLESantroad Weir : 2000 Ha. Command Area.Constg. of Big & Small Checkdams on River & drains ofPanchmahal District.Deepening of Big & Small Tanks of PanchmahalsDistrict.“Mahatma Gandhi National Rural EmploymentGuarantee Act” works Desilting in Canals, Jungle Cutting, Earthwork Checkdam DesiltingLift Irrigation SchemeRestoration of Stepwells. 5
    • INDEX MAP 6
    • PANAM HIGH LEVEL CANAL PROJECT PANAM HIGH LEVEL CANAL – HEAD REGULATOR 7
    • PANAM HIGH LEVEL CANAL PROJECT TUNNEL ENTRANCE 8
    • INAUGURATION OF TUNNEL BYHON. CHIEF MINISTER, GUJARAT Dt. 25/01/2009 9
    • 10
    • EXCAVATION WORK 11
    • LEFT BANK MAIN CANAL 12
    • BRIDGE TYPE ROAD CROSSING 13
    • BOX TYPE ROAD CROSSING 14
    • VARIOUS OBSTRUCTIONS – HOUSES, WELLS, PROTECTED TREES 15
    • HARD ROCKOVER BURDEN 16
    • PANAM DAMLength of Masonary Dam – 189 m.Year of Construction - 197710 Radial Gates – Size: 14.93 m x 11.28 m.Max. Flood Discharge – 356000 Cusecs. 17
    • PANAM DAMVillages benefited - 132,Benefited Area- 36405 Ha.Length of Main Canal - 99.725 kmLength of Distriburoty & Minors - 800 kmIrrigation started - 1980Canal bed Power House - 2 Mega wattRehabilitation of 42 effected villages 18
    • PANAMyear 2004 : 3.56 Lacs cusecsMax. discharge released in the DAM 19
    • PANAMyear 2004 : 3.56 Lacs cusecsMax. discharge released in the DAM 20
    • PANAM DAMINSPECTION GALLARY 21
    • PANAM DAM - DAM SAFETY WORKS Cleaning of Drainage Gallery Before... After... 22
    • HADAF DAMLength of Masonary Dam – 89 m. Year of Construction - 1986 5 Radial Gates – Size: 14.95 m x 10.64 m. Max. Flood Discharge – 162000 Cusecs. 23
    • HADAF DAMBenefited villages–21, Benefited Area–5238 ha.Rehabilitation of 582 families of 7 villages. 24
    • HADAF DAM 25
    • KARAD DAMLength of Earthen Dam - 1019 m.Year of Construction - 1958Benefited villages- 25Benefited Area - 6190 ha. 26
    • KARAD DAM Benefited villages- 25 Benefited Area - 6190 ha.માટી બંધ પર અંશતઃ માટીકામ કરવામાં આવેલ છે . 27
    • KARAD DAM Over flow on 09.09.2010 Fuse Gates 28
    • SANTROAD WEIR Length of Weir: 280 m. Year of Construction : 2008 Storage Capacity : 117 Mcft. Benefited Area 2000 ha. of 4 villages by Lift Irrigation. No Land Acquisition required. 29
    • PANAM PROJECT No. ofSr. Taluka BenefitedNo. District benefited Area (in Ha.) villages Lunawada 28 8150 Shahera 47 58891 Panchmahal Godhra 28 13264 Kalol 16 42142 Vadodara Savali 13 4888 Total :: 132 36405 30
    • PLANNED CROPPING PATTERN Tobacco 2% Tw o Season Cotton 8% Kharif Paddy 19% Rabi Vegetable 10% Kharif 65% Rabi 52%Oil Seeds/Pulses 3% Two Season 13% TOTAL 130% Kharif Hybrid Bajari 19% Rabi Wheat 27% Kharif Maize 10% Kharif Jow ar 2% 31
    • MAJOR DISTRIBUTORIES OF PANAM PROJECTSr. Name of Off taking Length of C.C.A. Major CropsNo. Distributory from Main Distry. (in Ha.) Canal (km) (km)1 Ladvel 31.94 11.90 2220 Paddy2 23/R Rabadia 38.30 4.04 2017 Paddy3 24/R Morva 52.81 8.45 3481 Paddy, Maize4 25/R Kabirpur 54.33 14.81 4554 Paddy, Maize5 29/R 71.80 11.14 1591 Paddy, Wheat6 32/R.A. 82.01 14.48 5099 Tobacco, Cotton, Wheat7 32/R.B. 83.16 14.00 1488 Wheat8 34/R Sansoli 92.05 5.20 1794 Maize 32
    • Irrigation benefits given to affected people ofNarmada Project in Khajuri Colony under Panam Command 33
    • Obstructions in Irrigation ManagementMain canal from Ch. 0 to 30 km flows parallel to Panam River.Main Canal is contour canal. One side is hill & Other side Panam RiverHigh banking of 12 to 20 m. 34
    • Obstructions in Irrigation ManagementHeavy seepage from BankingChange of cropping pattern in the initial reach due to assured irrigation. 35
    • Frequent sliding of Rock debris in Main canal during monsoon. 36
    • Removal of Rock Debris AfterBefore 37
    • Renovation works of CanalPanam Main Canal 38
    • Renovation works of Canal Karad Main Canal After Before
    • Renovation works of Canal Minor No.1 After Before
    • Renovation works of Canal 41
    • Restoration of Structures Karad Main Canal Ch. 3 KM
    • N.R.E.G.A. Works Desilting work in Panam Main Canal 43
    • N.R.E.G.A. WorksKarad Main Canal
    • N.R.E.G.A. WorksKarad Canal
    • BIG CHECKDAM RAMNATH 46
    • BIG CHECKDAM MOKAL 47
    • SMALL CHECKDAM Karada 48
    • DEEPENING OF PONDS 49
    • DEEPENING OF PONDS VILLAGE - UCHET
    • LIFT IRRIGATION SCHEME BORIYAVI 51
    • LIFT IRRIGATION SCHEME SARADIA-DHAMNOD 52
    • TRAINING 53
    • TRAINING 54
    • PARTICIPATORY IRRIGATION MANAGEMENTSr No Name of Scheme Total C.C.A. (Ha.) No. of WUAs Area (Ha.) 1 Panam 36405 35 11200 2 Karad 6190 05 730 3 Hadaf 5238 06 1950 TOTAL: 47833 46 13880 55
    • PARTICIPATORY IRRIGATION MANAGEMENT 56
    • PARTICIPATORY IRRIGATION MANAGEMENT Before After 57