Results from HSS Assessments in 20 Townships
(Infrastructure)

Dr. Thida Kyu
Deputy Director(Planning)
DOH
Conditions of RHCs in 20 Townships
Sr Name of No;
No Townships of
RHCs
1
2
3
4
5
6
7
8
9
10

Lewe
Yedashe
Shwe Gu
Bamaw
Py...
Conditions of RHCs in 20 Townships
Sr Name of No;
No Townships of
RHCs

RHC Building
Good

Need
Need New
Renovation Constr...
RHCs which need renovation /new
construction in HSS 20 TS
Total No: of RHCs which need renovation / new
construction in HSS 20 TS

Total No; of RHCs- 120 in 20TS
Need Renovation -3...
Sub-centres with No Building in HSS 20 TS
Township

No SC building

Township

No SC building

Hsipaw

1

Ye-U

6

Pyinmana...
Appointed MWs who have no SC building in 20 TS
Township

MW
Assigned

No SC
building

Township

MW
No SC building
Assigned...
Labour Room attached RHCs & Electricity from EPC in HSS 20 TS
Name of Townships
Myeik
Kyaing Tone
Kaw Hmu
Nga Putaw
Hakha
...
RHCs with attached Labour Room
and Electricity from EPC
Nyaung Shwe
MUDON
Kamaroat S/C

In Mudon township
-Totally 6 RHCs & 24 sub centers
- 3 RHCs have labour room attached
- 8 sub centers ...
Kawt Kha Pon RHC attached at Village Authority’s
building

Kawtkhapon RHC in Mudon has no building and
it has to be opened...
Pyinmana
Among 5 RHCs in Pyinmana township,
1 RHC (Boe-ma) and 4 sub centres
have no building,
1 sub centre is being const...
Shwegu

22out of 55RHC have good building.
out of RHC have good building.
33RHCs need renovation.
RHCs need renovation.
On...
Yaydarshae

Kyun Pin Su S/C

Hle Pwe lay RHC has no RHC Building
18 sub centres have no sub-center buildings.

Aye Gye S/C...
Bamaw township

Naung Lite SC
Naung Lite SC
under Ma au pin RHC
under Ma au pin RHC

3RHCs have labour room attached.
Thaton

2 sub centers Kyarpun RHC (Duyin Seik and Gaw ),
1 sub cencre (Thein Seik -2) under the Thein Seik RHC,
2 sub cent...
Hsipaw

One out of 14 sub-centers and
3 special region clinics
( Pan Hone, Nar Nyu and Ohn mu)
had building that need
majo...
Conclusion
• Infrastructures are needed for motivation of midwives
to work in the community especially in HTR areas
• Infr...
Magyi Seik RHC,
Nyaung Shwe

Gamone Taung RHC,
Pyinmana
5.total infrastructure (dr thida kyu)
5.total infrastructure (dr thida kyu)
Upcoming SlideShare
Loading in...5
×

5.total infrastructure (dr thida kyu)

84

Published on

Published in: News & Politics, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
84
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

5.total infrastructure (dr thida kyu)

  1. 1. Results from HSS Assessments in 20 Townships (Infrastructure) Dr. Thida Kyu Deputy Director(Planning) DOH
  2. 2. Conditions of RHCs in 20 Townships Sr Name of No; No Townships of RHCs 1 2 3 4 5 6 7 8 9 10 Lewe Yedashe Shwe Gu Bamaw Pyinmana Nyaung Shwe Tharyarwad dy Tha Htone Mudon Hsipaw Total RHC Building Good Bad Need Need New Renovation Construction Labour room Electricity(EPC) + 8 8 5 6 5 4 7 2 2 4 4 1 3 3 0 2 0 3 3 0 1 1 0 1 1 2 5 3 3 0 4 3 1 0 1 7 4 3 3 0 3 0 6 5 6 5 4 4 5 3 2 1 1 2 2 1 2 0 0 1 0 1 3 3 5 2 0 3 0 61 39 20 16 5 28 14
  3. 3. Conditions of RHCs in 20 Townships Sr Name of No; No Townships of RHCs RHC Building Good Need Need New Renovation Construction Bad Labour room Electricity(EPC) + 1 Myeik 5 4 1 1 0 5 2 2 Kyaing Tone 5 4 1 1 0 3 2 3 Kaw Hmu 5 2 2 2 0 5 3 4 Nga Putaw 5 2 2 2 0 4 0 5 Hakha 4 3 1 0 1 1 0 6 Hlaing Bwe 8 5 3 3 0 7 0 7 Hti Lin 5 4 1 1 0 0 0 8 Demawsoe 7 1 6 5 1 0 1 9 MaungDaw 9 7 2 2 0 1 1 10 Ye Oo 6 4 2 0 0 6 0 59 36 21 17 2 32 9 Total
  4. 4. RHCs which need renovation /new construction in HSS 20 TS
  5. 5. Total No: of RHCs which need renovation / new construction in HSS 20 TS Total No; of RHCs- 120 in 20TS Need Renovation -33 Need New Construction -7
  6. 6. Sub-centres with No Building in HSS 20 TS Township No SC building Township No SC building Hsipaw 1 Ye-U 6 Pyinmana 4 Lewe 8 Htilin 1 Yedeshay 18 Bamaw 1 Shwegu 1 Demawsoe 13 Hlaingbwe 10 Hakha 0 Thaton 6 Thayawady 3 Mudon 8 Kawhmu 2 Maungdaw 8 Ngaputaw 6 Nyaung-Shwe 0 Myeik 11 Kengtong 10 Total 117
  7. 7. Appointed MWs who have no SC building in 20 TS Township MW Assigned No SC building Township MW No SC building Assigned Hsipaw 19 1 Ye-U 32 6 Pyinmana 17 4 Lewe 38 8 Htilin 28 1 Yedeshay 31 18 Thayawady 33 3 Kawhmu 24 2 Bamaw 27 1 Shwegu 23 1 Demawsoe 41 13 Hlaingbwe 47 10 Hakha 24 0 Thaton 43 6 Mudon Maungda w NyaungShwe 35 8 32 8 Ngaputaw 29 6 35 0 Myeik 32 11 Kengtong 34 10 Total 624 117
  8. 8. Labour Room attached RHCs & Electricity from EPC in HSS 20 TS Name of Townships Myeik Kyaing Tone Kaw Hmu Nga Putaw Hakha Hlaing Bwe Hti Lin Demawsoe MaungDaw Ye Oo Lewe Yedashe Shwe Gu Bamaw Pyinmana Nyaung Shwe Tharyarwaddy Tha Htone Mudon Hsipaw Total No; of RHCs 5 5 5 5 4 8 5 7 9 6 8 8 5 6 5 7 6 5 6 5 120 Labour Room + 5 3 5 4 1 7 0 0 1 6 2 5 3 3 0 3 1 3 3 5 60 Electricity(EPC) 2 2 3 0 0 0 0 1 1 0 4 3 1 0 1 0 2 0 3 0 23
  9. 9. RHCs with attached Labour Room and Electricity from EPC
  10. 10. Nyaung Shwe
  11. 11. MUDON Kamaroat S/C In Mudon township -Totally 6 RHCs & 24 sub centers - 3 RHCs have labour room attached - 8 sub centers do not have subcentre building, even no demarkated land space for S/C.
  12. 12. Kawt Kha Pon RHC attached at Village Authority’s building Kawtkhapon RHC in Mudon has no building and it has to be opened at the local authority’s office in the morning.
  13. 13. Pyinmana Among 5 RHCs in Pyinmana township, 1 RHC (Boe-ma) and 4 sub centres have no building, 1 sub centre is being constructed. Temporary building for We’ Gyi S/C Midwives who do not have sub centre building, have to stay in village administration offices or stay attached to village head’shome.
  14. 14. Shwegu 22out of 55RHC have good building. out of RHC have good building. 33RHCs need renovation. RHCs need renovation. Only 33RHCs have labour room ; ; Only RHCs have labour room Need to build one sub center Need to build one sub center
  15. 15. Yaydarshae Kyun Pin Su S/C Hle Pwe lay RHC has no RHC Building 18 sub centres have no sub-center buildings. Aye Gye S/C does not have sub centre building and has to open at local authority office One local person from the village willing to give his own land to construct S/C
  16. 16. Bamaw township Naung Lite SC Naung Lite SC under Ma au pin RHC under Ma au pin RHC 3RHCs have labour room attached.
  17. 17. Thaton 2 sub centers Kyarpun RHC (Duyin Seik and Gaw ), 1 sub cencre (Thein Seik -2) under the Thein Seik RHC, 2 sub centres (Kadaik Lay and Tawgyi ) under Kadaikgyi RHC and Naungbo subcenter under Painetaw RHC have no building.
  18. 18. Hsipaw One out of 14 sub-centers and 3 special region clinics ( Pan Hone, Nar Nyu and Ohn mu) had building that need major renovation and need to construct 1 SC . 5 RHCs have labor rooms.
  19. 19. Conclusion • Infrastructures are needed for motivation of midwives to work in the community especially in HTR areas • Infrastructures for working and living have to be fulfilled • Prioritization have to be done for those in real need than those that can wait for the construction of sub center • Similarly for renovation, HSS program could take care of a few: but in the CTHP, gaps for refurbishment were mentioned for donors and other interesting parties concern and contribution.
  20. 20. Magyi Seik RHC, Nyaung Shwe Gamone Taung RHC, Pyinmana