• Email
  • Favorite
  • Download
  • Embed
  • Private Content

Loading…

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

Lean Times Require Lean Thinking

by ThoughtWorks Australia on Mar 31, 2009

  • 8,503 views

The Toyota Way, also known as Lean, was born from hardship and survival. It is an approach that does not rely on the accidental fortunate circumstance of being in a positive business climate. The syste...

The Toyota Way, also known as Lean, was born from hardship and survival. It is an approach that does not rely on the accidental fortunate circumstance of being in a positive business climate. The system that propelled Toyota to the top of the global automotive industry is designed to succeed in both good times and bad.

Lean thinking fundamentally changes the engagement model between IT and the business, challenging traditional relationships with staff,customers and partners.

This session, presented by a partnership between ThoughtWorks and KM&T, explains the Lean approach to challenges, continuous improvement, productivity, and quality, and how these principles can help you deliver high-value,high-quality software solutions to reduce operational costs, increase profitability, and survive.

With presenters bringing deep expertise from Toyota, Lean and Agile principles, learn how to:
-Identify and eliminate non-value adding work and cost (i.e., waste)
-Build quality into processes to remove unnecessary rework
-Apply Just-in-Time (JIT) principles to software delivery
-Build processes that optimise use of resources and productivity for the entire end-to-end value stream
-Engage everyone to continuously improve your team and practices
-Understand the differences between repetitive processes, product development and software development

Join us to discover how to do more with less.
»
»
»
»
»
»
BRISBANE
Tuesday 17 March, 2009
8am –- 9.30am
Hilton
190 Elizabeth Street, Brisbane
SYDNEY
Tuesday 24 March, 2009
8am –- 9.30am
Hilton
488 George Street, Sydney
MELBOURNE
Tuesday 31 March, 2009
8am –- 9.30am
Marriott
Cnr Exhibition & Lonsdale
Streets, Melbourne
PERTH
Tuesday 7 April, 2009
8am –- 9.30am
Hilton
14 Mill Street, Perth
A light buffet breakfast will be provided *
*

Accessibility

Categories

Tags

thoughtworks agile kmt lean toyota responsibility lean thinking thinking kanban john shook lean bueno tw 5

More...

Upload Details

Uploaded via SlideShare as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

Cancel

8 Embeds 244

http://jchyip.blogspot.com 89
http://www.slideshare.net 58
http://blog.aplikacja.info 46
http://paper.li 22
http://www.encob.net 19
http://passthebuck.wordpress.com 8
http://buffetvert.blogspot.com 1
http://jchyip.blogspot.com.es 1

More...

Statistics

Favorites
24
Downloads
1,126
Comments
0
Embed Views
244
Views on SlideShare
8,259
Total Views
8,503
Post Comment
Edit your comment Cancel

Lean Times Require Lean Thinking — Presentation Transcript