    1. Quarterly Technology Briefing “Lean Times Require Lean Thinking” presented in partnership with
    2. Lean Times Require Lean Thinking Jason Yip ThoughtWorks Paul Heaton KM&T Image from http://www.bluefountainmedia.com/blog/?p=38
    3. “ As the Japanese economy entered a steep recession in that year, the Toyota Motor Company ran out of cash , which was tied up in inventory for products customers no longer wanted. The company fell under the control of bankers who chopped the company in two, creating separate firms to divide the marketing and sale functions from the product development and production functions. (These firms were only recombined in 1982 to create the current Toyota Motor Corporation.) Founding president Kiichiro Toyoda (new president Akio Toyoda’s grandfather) was driven out in the process . The pursuit of what became the Toyota Production System , along with the product development, supplier management, and customer support systems, was the creative response to this crisis .” James Womack, Respect Science Especially in a Crisis, http://www.manufacturingnews.com/news/09/0309/womack.html
    4. Lean was born from hardship and survival
      • Free up scarce cash
      • Reduce costs while enhancing quality
      • And very little time to do this
      http://www.flickr.com/photos/jtcatbagan/2420624616/
    5. What happened since then?
    6. In 2008, Toyota surpasses GM as the world’s largest auto maker Toyota and Honda lead in J.D Power quality ratings
    7. “ Our recurring losses from operations, stockholders' deficit and inability to generate sufficient cash flow to meet our obligations and sustain our operations raise substantial doubt about our ability to continue as a going concern ” General Motors SEC filing, 2009
    8. Who would you rather be?
    9. Is this really relevant to us?
    10.  
    11. Toyota success with the Prius
      • Developed within 18 months.
      • Toyota used 150 engineers during development.
      • A typical competitor will take 4 years
      • A typical competitor will use 600 engineers.
      Source - National Center for Manufacturing Sciences report Note: this includes designing the Plant to produce it!!
    12. What message do I want to give?
      • Lean Thinking is now becoming a recognised world wide business model in multiple sectors.
      • It is not just all about Toyota Cars..!
    13. Agile Toyota Honda New product development Scrum XP Lean Lean Software Development Iterative and Incremental development Kanban
    14. So, what is Lean?
    15. Just-in-Time (not Just-in-Case)
      • The right material
      • At the right time
      • At the right place
      • In the exact amount
    16. Stop The Line
      • “ stop and fix problems as they occur rather than pushing them down the line to be resolved later”
      • Jeffrey Liker and David Meier, Toyota Way Fieldbook
    17. The essence of Lean is engaging everyone in identifying and solving problems
    18. Activities that do not add value workload that is not balanced work that creates burden for the team members or processes Picture Source – Toyota Motor Company Australia Waste Un-Evenness Overburden
    19. 8 WASTES Over- production Waiting Transport or Conveyance Rework Motion Stock & Materials Over- processing In LEAN 8 types of waste have been identified These classifications have been adopted globally - for any process. They apply equally to any process . All of these 8 can be either “ Necessary Waste” or “ Un-necessary Waste” Depending on circumstance Not using People Resource
    20. Waiting Waiting is where people or materials are not being utilised because they are waiting for another person or process to complete before work can resume.
      • Examples:
      • Waiting for patient records
      • Waiting for medical staff
      • Waiting for test results
      Waiting
    21. Overproduction Overproduction is where an excess of processes, or services are being created, without there being any real requirement for them.
      • Examples:
      • Sending the same letter to the patient more than once
      • Re-writing notes or forms because of their illegibility
      Over- production
    22. Transport or Conveyance Unnecessary transportation of patients, stock, patient records and equipment which is not reaching its end goal, adds no value. Too much transportation should be avoided and is often the result of departments spaced far apart, or resources not being closely linked.
      • Examples:
      • Moving patients unnecessarily from ward-to-ward
      • Moving documents/patient records from one department to another
      Transport or Conveyance
    23. Over-processing Over-processing is where a process or person works hard, but not necessarily smart, creating a waste which is not always easy to see, and can often be mistaken as part of the process.
      • Examples:
      • Producing documents/charts/notes which are never to be seen or used
      • Performing more tests then are necessary for a patient
      Over- processing
    24. Rework Rework is where a process or procedure is not completed correctly the first time and therefore needs to be re-done, or adjusted before it is deemed completed.
      • Examples:
      • Producing multiple documents due to incorrect information or errors
      • Multiple tests or clinic dates for a patient as correct information was not collected or noted upon initial visit or test
      Rework
    25. Stock Stock = Materials in Stores (Medical equipment, Work-In-Process (WIP) & Finished Work) Excess Stock = Cost (Cash)
      • Examples:
      • Too many drugs at ward
      • Uncontrolled material ordering
      Stock
    26. Motion Motion is related to human movement. Good work area layout and process design minimises the amount of movement and saves time & effort when finding or fetching material or documents.
      • Example:
      • Poor work area design, causing unnecessary:
        • Walking
        • Bending
        • Stretching
      Motion
    27. Resource Resource is the most valuable asset in any business, without it, no business can function or succeed successfully. The trick is to use the resource as they are the local experts.
      • Examples:
      • Not Listening
      • Not Asking
      • Not Empowering
      • Not doing anything with generated / suggested ideas
      Resource
    28. How does this fit with IT?
    29. Understanding of problem space Understanding of solution space Focus Business as Usual +++ (specification as input) +++ (focus on task efficiency) Cycle time + cost reduction Typical projects + (iterative specification) ++ (control what needs to be learned) Earlier ROI New Product Development ? (specification as output) ? (focus on learning efficiency) Acquire and exploit knowledge faster than competitors
    30. “ Put yourself in the position of the customer and ask if you would pay less for the product or be less satisfied with it if a given step and its necessary time were left out.” Mike Rother and John Shook, Learning to See
      • Extra features (overproduction)
      • Delays (waiting)
      • Hand-offs (source of delays and defects, loss of information)
      • Re-learning
      • Partially done work (obsolescence, not JIT)
      • Task switching (reduces throughput)
      • Defects (unnecessary rework)
      • Unused employee creativity
      Software development waste
    31. Non Value Add “ unnecessary wastes” Waste to Eliminate ! Non Value Add “ necessary waste” Waste to Reduce ! Value Add Increase!
    32. RENAL patients going through a Hospital Process Pictures provided courtesy of Agility Healthcare Solutions What is added value to the Customer Look at End to End Value Chain
    33. Mapping the Process… Source – NHS Centre for Innovation
    34. 36 process steps 7 value add 29 process steps were non-value add or waste Who thinks that of the 36 steps: 100% - 75% was added value activity? 75% - 50% was added value activity? 50% - 25% was added value activity? Less than 25% was added value? 1 2 3 4 5 6 7 8 9 28 29 30 31 32 33 34 35 36 19 20 21 22 23 24 25 26 27 10 11 12 13 14 15 16 17 18
      • Drive Cultural Change
      • People Engagement
      • Raise Problems in the moment
      • Cross Functional Team
      • Tracking Problems
      • Regular Disciplined Meetings
      • Responsibilities assigned
    35. Continuous Improvement P – Plan D – Do C – Check A - Act Improvement to patient care & experience Value Waste Flow Perfection
    36. Hospital Result…
      • ISSUE
      • Renal patients taking FIFTEEN days to get through process
      ACTIVITY Process Map Team Work Waste ID Problem Solving Project Mgt Committed Leader RESULT Waste reduction allowed sustainable reduction to EIGHT days
    37.  
    38.  
    39.  
    40.  
    41. Set-based Concurrent Engineering
    42. No problem is a problem
      • Authority-focus
      • “ Whose job is this?”
      • “ Not my problem”
      • Responsibility-focus
      • “ What is the right thing to do?”
      • “ How can I help?”
      “ Managing to Learn” by John Shook
    43. Daily standup meetings
    44. Heartbeat retrospectives
      • What did we do well, that if we don’t discuss we might forget?
      • What did we learn?
      • What should we do differently next time?
      • What still puzzles us?
      • http://www.retrospectives.com/pages/RetrospectiveKeyQuestions.html
    45. Technique Time to detect problem Pairing Seconds Test Driven Development Seconds to minutes Co-location Seconds to minutes Continuous Integration ~20 minutes to a couple hours User Stories A couple days Timeboxed development 1 – 4 weeks Small releases 1 – 3 months
    46. Just-in-Time is a response to the problem of overproduction
    47. Stop The Line is a response to the problem of unnecessary rework due to defects
    48. The essence of Lean is engaging everyone in identifying and solving problems
    49. What type of results are we talking about?
    50. McKinsey on Lean IT “ In our experience, applying the principles of lean manufacturing to [application development and maintenance] can increase productivity by 20 to 40 percent while improving the quality and speed of execution .” N. Kindler, V. Krishnakanthan, R. Tinaikar, “Applying lean to application development and maintenance”, McKinsey on IT, Spring 2007
    51. Forrester Research on ThoughtWorks Agile/Lean Category Improvement Total defects 63% less Critical defects 79% less Effort 62% less Duration 69% less
    52. So…what is required?
      • A Clear Customer Focused Vision
      • Sustained Leadership Commitment
      • People Engagement / Role Clarity / Skills Developed
      • Structure Process & Project Management
      • Change Champions
      • A Sense of Urgency
      • Appropriate Activity Monitoring
      • Appropriate HR Policies
    53.  
    54. What’s next?
      • Start where you are
      • Don’t shy away from your problems
      • Go and see
      • Think
      • And ask for help
    55. For Further Information please contact: ThoughtWorks – Jason Yip Email [email_address] Web www.thoughtworks.com.au KM&T – Paul Heaton mail [email_address] Web www.kmandt.com.au
    SlideShare Zeitgeist 2009

    + ThoughtWorks AustraliaThoughtWorks Australia Nominate

    custom

    1986 views, 9 favs, 4 embeds more stats

    The Toyota Way, also known as Lean, was born from h more

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 1986
      • 1896 on SlideShare
      • 90 from embeds
    • Comments 0
    • Favorites 9
    • Downloads 256
    Most viewed embeds
    • 71 views on http://jchyip.blogspot.com
    • 12 views on http://www.encob.net
    • 6 views on http://passthebuck.wordpress.com
    • 1 views on http://buffetvert.blogspot.com

    more

    All embeds
    • 71 views on http://jchyip.blogspot.com
    • 12 views on http://www.encob.net
    • 6 views on http://passthebuck.wordpress.com
    • 1 views on http://buffetvert.blogspot.com

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories