Your SlideShare is downloading. ×
ELM FORK ATHLECTIC COMPLEX presentation thom
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

ELM FORK ATHLECTIC COMPLEX presentation thom

231

Published on

Briefing on the Elm Fork Athletic Complex, detailing facts, phases, budgets, and conceptual sketches.

Briefing on the Elm Fork Athletic Complex, detailing facts, phases, budgets, and conceptual sketches.

Published in: Design
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
231
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
1
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Elm Fork Athletic Complex Dallas Park and Recreation
  • 2. 2
  • 3. 3
  • 4. 4
  • 5. 5
  • 6. PHASE 1 CONSTRUCTION6
  • 7. 7
  • 8. 8
  • 9. 9
  • 10. 10
  • 11. 11
  • 12. 12
  • 13. 13
  • 14. 14
  • 15. 15
  • 16. 16
  • 17. 17
  • 18. Land Acquisition18
  • 19. MAINTENANCE BUILDING DESIGN OPTIONS20
  • 20. (Optional) LEED CERTIFIED DESIGN MAINTENANCE BUILDING21
  • 21. 22
  • 22. 23
  • 23. 24
  • 24. 25
  • 25. Master Plan • Master Plan elements: – 19 soccer fields • 14 lighted international play fields • 5 youth practice fields – Championship field (lighted) • Covered seating – Central concession facility with • Concessions and storage • Restrooms • Ticket booth • Referee rooms • Office and conference room • First aid26
  • 26. Master Plan – 3 restroom/vending satellite pavilions – Parking for 700 cars – Re-routing existing drainage channel – Landscape and irrigation – Irrigation pond (12 million gallon) – Connector trail and loop trail – Connection to Citywide & RegionalTrail Network – 28 Acres nature area – Playground – Maintenance facility • Future Walnut Hill Lane improvements to benefit park – Dallas County and City of Dallas27
  • 27. Proposed Walnut Hill Lane Improvements28
  • 28. BUDGET Land Construction Acquisition Phase 1 $2.4M $19M Phase 2 (finish out) $20M Total Construction $39M29
  • 29. Phase 1 Development • Components of Phase 1 – 14 International fields – 5 Practice/Youth fields – 3 restroom/vending satellite pavilion – Parking and drives – Connector trail and loop trail – Site grading and fill – Site utilities – Landscape – Fencing – Irrigation30
  • 30. Restroom/Vending Satellite Pavilion31
  • 31. SATELLITE PAVILION32
  • 32. 33

×