Your SlideShare is downloading. ×
How You Can Shingle A Storage Shed Roof_
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

How You Can Shingle A Storage Shed Roof_

323
views

Published on

Published in: Business

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
323
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. How You Can Shingle A Storage Shed RoofStep One in how you can shingle a storage shed roof: Whenever you shingle a storage shed roof,remove any shingles if youre re-shingling the rooftop of the old shed. See if that old paper hasdamages, replace patch that old paper with new. When you are shingling a brand new roof, makesure that the rooftop boards are safely attached have proper alignment. Be sure to nail that arentnailed in, lower.For added weather-proofing and water-sealing, you can caulk between your roofing board seams.Step Two in how you can shingle a storage shed roof: If you are using a new roof, lay lower roofingpaper. Start in a corner from the roof and, from an advantage to a different edge, roll paperoutrageous. &frac14 inch of paper should remain as overhang around the finish. Secure the paperhaving a heavy-duty staple-gun after cutting. Now perform the other strip. Overlap with roughly 1 ".When enough strips happen to be laid to pay for the whole roof completely, trim the paper around thefinishes for any 1/4 inch overlap.Step Three in how you can shingle a storage shed roof: Begin lounging the shingles by beginning inthe roofs lower edge. Be sure the very first shingle row will over hang by 1/4 to at least oneOr2 inch.Nail each shingle lower while you lay it lower around the upper edge. Use roofing nails. After youhave finished the very first row, begin lounging the 2nd. Make sure you overlap enough to own roof aclean appearance. Once you have arrived at the very best, start on the other hand.Step Four: On top ridge from the roof, cap with more than hanging shingles. Can start one ridge finishwith one shingle you lay in an position of 90 levels towards the row of shingles youve just laid. Nailshingle lower. Nail another shingle. Make certain you overlap each by one to two inches. Continueand finished. There is a nice shed roof! That did not brake the financial institution.roofing contractor chestnut hill ma