Unitech Services Presentation

  1. 1. Unitech Building Systems, LLC. Strong, Economical, Quality
  2. 2. Who we are ?•  Unitech  Building  Systems,  LLC.  was  founded  in  2002,    and  recently   restructured  its  opera>ons  to  serve  other  developing  countries.      •  Unitech  Building  Systems,  LLC.  is  a  designer  and  supplier  of  structural   three  dimensional  panels  for  use  in  the  building  industry.        •  Our  system  is  extremely  fast  to  build  and  can  represent  a  savings  in  labor   and  material  of  approximately  40-­‐50%.  •  Methods  of  Manufacturing  are  approved    approved  by  ASTM  E330  and   has  received  recogni>on  by  the  U.N.D.P.-­‐  United  Na>on  Development   Program    •  Our  system  does  not  use  expensive  and  limited  resources  such  as  those   found  in  conven>onal  construc>on,  such  as  water,  wood  or  concrete   blocks.  •  Unitech  Building  Systems  has  the  capabili>es  to  act  as  a:     –  Master  Planner  &  Designer   –  Builder  and  Supplier  &   –  Construc>on  Manager    
  3. 3. Our Approach Client   PHASE  #1   PHASE  #  2   Enter  into  Formal  contract   Verifica>on  of  Funds  from   with  Unitech  Building  Systems     funding/  financial  en>ty  or   (2-­‐3  weeks)   ins>tu>on   (1-­‐2  week)     UBS  develops  a  Technical    Submit  project  fee  to  1  on  1  consulta>on  with  client   Proposal  based  on   Client  DraYs  contract  to  UBS   and  UBS   Consulta>on  with  Project   based  on  Technical  Proposal   Unitech  per  contract  with   Detailed  in  Phases   fees  as  agreed  upon.     UBS  DraYs  Master  Plan   Schedule  for  Fabrica>on   and  Construc>on  of   Project  
  4. 4. Master Development Planners
  5. 5. What Does a Master Planned Community Mean for You?•  Schools • Parks   Ideal  for  children.   Great  for  children  who   Focuses  on  their   are  in  developmental   development  in  these   stages.  Provides     type  of  communi3es   excellent  sociological   and  socioeconomic     benefits   Keeping  a   Caring  for  individuals   community  safe   with  various  needs   starts  with  a  police   requires  having  a  state   and  fire  sta3on    in   of  the  art  Hospital  in   them.     your  community  •  Police  and   • Hospitals   Fire  Sta3ons  
  6. 6. Unitech Communities A Unitech Community is: -  Affordable -  Comfortable -  Modern -  Safe -  Socioeconomically beneficial -  Practical
  7. 7. Unitech Levels of HousingEconomical Luxury Mid Class
  8. 8. Case Study #1•  48 Square Meters•  (2) Bedroom•  (1) Bath•  Dining Room•  Kitchen•  Living Room•  (5) Windows•  (5) Doors•  Paint on exterior & interior walls•  Finish Roof System•  5 Days of Installation Time with a 5 person crew  
  9. 9. Case Study #2•  190 Square Meters•  (4) Bedroom•  (2.5) Baths•  Dining Room•  Kitchen•  Living Room•  (8) Windows•  (9) Doors•  Paint on exterior & interior walls•  Finish Roof System•  15 Days of Installation Time with a 7 person crew  
  10. 10. Unitech Building Systems Green Technology•  Thermal•  High R- Value up to R-20•  Comfortable•  Made from partially Recycled Steel•  Scraps from our fabrication process are recycled, melted & reused & re-made into high quality material•  Polyurethane Foam is water based•  Eco-Friendly (U.N.D.P recognized
  11. 11. THE FOLLOWING TABLE SHOWS THE POTENTIAL SAVINGS OF TRADITIONAL MATERIALS BUILDING 30 HOMES PER DAY CONTINOUSLY IN 5 YEARS USING UNITECH MATERIAL   PROJECTED  NATURAL  RESOURCE  SAVINGS  (  in  thousands  )   Cement=TONS,  WOOD=  Kilos,  TREES=  Hectarea,  BLOCK=  Kilos,  STEEL=  TONS  200,000  180,000  160,000  140,000  120,000  100,000   80,000   60,000   40,000   20,000   0   1  year   2  years   3  years   4  years   5  years   Cement   10,000   20,000   30,000   40,000   50,000   Wood   15,422   30,844   46,266   61,688   77,110   Trees   6,070   12,140   18,210   24,280   30,350   Blocks   36,818   73,636   110,454   147,272   184,090   Steel   3,208   6,410   9,400   12,310   15,600  
  12. 12. Unitech’s state of the art Renewable Energy Panels

×