IFMA Presentation: BIM Making the Facility Manager's Life Easier

2,073 views

Published on

Published in: Education, Business, Technology
0 Comments
3 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
2,073
On SlideShare
0
From Embeds
0
Number of Embeds
4
Actions
Shares
0
Downloads
68
Comments
0
Likes
3
Embeds 0
No embeds

No notes for slide
  • Quarter million $ saved on Cath 9
  • Go to Revit demo after this slide. Focus on 3D views, and explain that the drawings are views of a model, not drafted abstractions.
  • Go to Revit demo after this slide. Focus on 3D views, and explain that the drawings are views of a model, not drafted abstractions.
  • IFMA Presentation: BIM Making the Facility Manager's Life Easier

    1. 1. BIM Making the FacilityManager’s Life Easier:Techniques to Reduce Risk on Your NextProject and Protect Your Investment Eric Peabody Suj Mishra eric@dpsf.com suj@dpsf.com 415 777-3737 415 777-3737
    2. 2. Agenda Quick Overview What is BIM, how does it work Reduce Risk Use the Risk=Cost equation to benefit everyone Prove it! Experimental data on three identical projects Use BIM in FM today Free tools to implement BIM nowThe Design Partnership LLP Architects + Planners
    3. 3. Quick Overview of BIMThe Design Partnership LLP Architects + Planners
    4. 4. Project Delivery Improvement Automatic Document Coordination 3D Systems Coordination Virtual Building Simulation Direct FabricationThe Design Partnership LLP Architects + Planners
    5. 5. BIM is a 3D DatabaseThe Design Partnership LLP Architects + Planners
    6. 6. A Federated ModelThe Design Partnership LLP Architects + Planners
    7. 7. 3D Laser SurveyThe Design Partnership LLP Architects + Planners
    8. 8. Clash Detection & CoordinationStructuralPlan Where is the coordination error?MechanicalPlanThe Design Partnership LLP Architects + Planners
    9. 9. The Design Partnership LLP Architects + Planners
    10. 10. Direct FabricationThe Design Partnership LLP Architects + Planners Images courtesy of Marelich Mechanical
    11. 11. Direct FabricationThe Design Partnership LLP Architects + Planners
    12. 12. PrefabricationThe Design Partnership LLP Architects + Planners
    13. 13. Just-in-time DeliveryThe Design Partnership LLP Architects + Planners
    14. 14. The Design Partnership LLP Architects + Planners Image courtesy of Marelich Mechanical
    15. 15. The Design Partnership LLP Architects + Planners
    16. 16. Image courtesy of Marelich MechanicalThe Design Partnership LLP Architects + Planners
    17. 17. The Design Partnership LLP Architects + Planners
    18. 18. Reduce RiskThe Design Partnership LLP Architects + Planners
    19. 19. The Big BIM/IPD/Lean IdeaThe Design Partnership LLP Architects + Planners
    20. 20. Increase in Architect’s Exposure Unknown Consequences Of Sharing BIM Information Design Only Information In BIM Model Extensive Pre-coordination Fabrication From Design Models Increased Exposure to RiskThe Design Partnership LLP Architects + Planners
    21. 21. Decrease in Contractor’s Risk Reduced Coordination Errors Reduced Unknown Conditions More Efficient Workflow Cooperation & Collaboration Reduced Contingency Increased Confidence &  Reduced RiskThe Design Partnership LLP Architects + Planners
    22. 22. Decrease in Owner’s Risk Reduced Bids Due To Reduced Contractor Risks Reduced Risk Of – Change Orders From Unknown Conditions – Coordination Changes – Fighting Among AEC Entities Reduced User Changes Due To Better Pre-visualization And PlanningDesign Partnership LLPRiskThe Reduced Architects + Planners
    23. 23. Architect’s Exposure  However Architect’s Risk  Reduced Risk for All = Reduced CostThe Design Partnership LLP Architects + Planners
    24. 24. Prove it!The Design Partnership LLP Architects + Planners
    25. 25. 7910
    26. 26. Experimental ControlsExperimental Variables BIM Use Area* Start** ArchitectCath Lab 7 CAD 720 SF 2006Cath Lab 9 2” 1,173 SF 2009 StandardCath Lab Everything 1,060 SF 201010*Results expressed per SF to normalize this variable**Cost values escalated to 2010 relative value to normalize this variable
    27. 27. Cath Lab 7 CAD OnlyThe Design Partnership LLP Architects + Planners
    28. 28. 7
    29. 29. Cath Lab 7: Siemens Biplane Cath Lab Project Area: 720 Gross Square Feet Construction Start: 2006Procedure Room: 600 Net Square Feet BIM Use: None
    30. 30. (E) CAD V.I.F. (N) CAD ConstructionThe Design Partnership LLP Architects + Planners
    31. 31. (E) CAD V.I.F. (N) CAD ConstructionThe Design Partnership LLP Architects + Planners
    32. 32. (E) CAD V.I.F. (N) CAD ConstructionThe Design Partnership LLP Architects + Planners
    33. 33. (E) CAD V.I.F. (N) CAD ConstructionThe Design Partnership LLP Architects + Planners
    34. 34. The delay was caused…by the over-head structural and M/E/P/FP not being coordinated. The majority of the overhead had to be re-designed. DPR ConstructionThe Design Partnership LLP Architects + Planners
    35. 35. Cath Lab 9 BIM to 2”The Design Partnership LLP Architects + Planners
    36. 36. 9
    37. 37. Cath Lab 9: Siemens Biplane Hybrid OR Project Area: 1,173 Gross Square Feet Construction Start: 2009Procedure Room: 821 Net Square Feet BIM Use: Model to 2”
    38. 38. 3D Scan (E) Model (N) Model ConstructionThe Design Partnership LLP Architects + Planners
    39. 39. 3D Scan (E) Model (N) Model ConstructionThe Design Partnership LLP Architects + Planners
    40. 40. 3D Scan (E) Model (N) Model ConstructionThe Design Partnership LLP Architects + Planners
    41. 41. 3D Scan (E) Model (N) Model ConstructionThe Design Partnership LLP Architects + Planners
    42. 42. Cath Lab 10 BIM EverythingThe Design Partnership LLP Architects + Planners
    43. 43. 10
    44. 44. Cath Lab 10: Siemens Biplane Pediatric Cath Lab Project Area: 1060 Gross Square Feet Construction Start: 2010Procedure Room: 717 Net Square Feet BIM Use: Model Everything
    45. 45. 3D Scan (E) Model (N) Model ConstructionThe Design Partnership LLP Architects + Planners
    46. 46. 3D Scan (E) Model (N) Model ConstructionThe Design Partnership LLP Architects + Planners
    47. 47. 3D Scan (E) Model (N) Model ConstructionThe Design Partnership LLP Architects + Planners
    48. 48. 3D Scan (E) Model (N) Model ConstructionThe Design Partnership LLP Architects + Planners
    49. 49. ResultsThe Design Partnership LLP Architects + Planners
    50. 50. Construction Cost BIM Use % from CADCath Lab 7 CADCath Lab 9 2” Standard -15.0%Cath Lab Everything*All figures in 2010 Relative Value -4.1%10Change Order BIM Use % of TotalCost 7 CADCath Lab 12.4%Cath Lab 9 2” Standard 8.1%Cath Lab Everything <0.1%10*All figures in 2010 Relative ValueThe Design Partnership LLP Architects + Planners
    51. 51. Construction BIM Use Construction Days/SF % fromScheduleCath Lab 7 CAD 8.40 mo 0.23 D/SF CADCath Lab 9 2” Standard 8.50 mo 0.15 D/SF -34.8%Cath Lab Everything 8.45 mo 0.16 D/SF -30.4%10All Costs Survey All Construction Margin** Total Services* $Cath Lab 7 18.5% 18.5%Cath Lab 9 1.6% 27.3% (15.0%) (22.0%) (23.3%)Cath Lab 10 1.6% 18.5%*All design professional fees, including non-BIM fees (4.1%) (18.6%) (17.9%)**Cath lab contribution margin of ~$8,000 per dayThe Design Partnership LLP Architects + Planners
    52. 52. ConclusionsSave up to 23% on project costsComplete project 35% fasterDrop change order rate to <0.1%44% fewer RFIsThe Design Partnership LLP Architects + Planners
    53. 53. Federated Model REVIT 3D CADD REVIT NAVISWORKS ABS CADD/REVITThe Design Partnership LLP Architects + Planners
    54. 54. Use BIM in FM Today BIM model from construction phase Navisworks Freedom Smart Tags linked to (E) systems QR codes linked to (E) systemsThe Design Partnership LLP Architects + Planners
    55. 55. Free Tools Navisworks Freedom: Model Navigation QR reader: QR Droid or Adobe AIR QR Code Generator: Kaywa.comThe Design Partnership LLP Architects + Planners
    56. 56. Thanks. Questions?Find the slides from this presentation on SlideShare.Search for us by name: TheDesignPartnershipOr by our public profile: http://www.slideshare.net/TheDesignPartnership Eric Peabody Suj Mishra eric@dpsf.com suj@dpsf.com 415 777-3737 415 777-3737

    ×