SlideShare a Scribd company logo
1 of 16
Document Revision No: 1.0
Cutover Drive Test Report
Time is Almighty Page 1 of 16
Drive Test Report of Ramayanpet
Cluster Name: T&R
DocumentVersion1.0
ZTE CORPORATION
ZTE Plaza, Keji Road South,
Hi-Tech Industrial Park,
Nanshan District, Shenzhen,
P. R. China
518057
Tel: (86) 755 26771900 800-9830-9830
Fax: (86) 755 26772236
URL: http://support.zte.com.cn
E-mail: doc@zte.com.cn
Document Revision No: 1.0
Cutover Drive Test Report
Time is Almighty Page 2 of 16
Contents
1 OVERVIEW.................................................................................................................. 3
1.1 Evaluation Objectives....................................................................................... 3
1.2 Evaluation Process............................................................................................ 3
1.3 Devices Used in one DT team .......................................................................... 4
1.4 DT Routes......................................................................................................... 6
2 Drive Plots for the Pre-cut & Post Cut ................................................................ 7
2.1 Mobile Rx Power (Long Call) .......................................................................... 7
2.1.1 PRE-Mobile Receive Power Plot (Long Call) ...................................................... 7
2.2 Mobile Tx Power (Long Call) .......................................................................... 8
2.2.1 PRE- Mobile Transmit Power (Long Call) ........................................................... 8
2.3 Forward Frame Error Rate (F-FER).................................................................. 9
2.3.1 PRE- Forward Frame Error Rate (F-FER)............................................................ 9
2.4 Aggregate Ec/Io (Long Call) with Drop call .................................................. 10
2.4.1 PRE- Aggregate Ec/Io (Long Call) with Drop call ............................................. 10
2.5 Aggregate Ec/Io (Short Call) with Access Fail.............................................. 11
2.5.1 PRE- Aggregate Ec/Io (Short Call) with Access Fail ........................................ 11
2.6 Active PN Plot (Long Call)............................................................................. 12
2.6.1 PRE- Active PN Plot .......................................................................................... 12
2.7 No. of PN in active set .................................................................................... 13
2.7.1 PRE- No. of PN in active set .............................................................................. 13
2.8 Forward RLP Throughput............................................................................... 14
2.8.1 PRE- Forward RLP Throughput ......................................................................... 14
3 PERFORMANCE Statistics for the Pre-cut & Post Cut Drive Test..................... 15
3.1 Long Call Report............................................................................................. 15
3.2 Short Call Report ............................................................................................ 15
3.3 Data Report ..................................................................................................... 15
3.4 Handoff Detail report...................................................................................... 15
Document Revision No: 1.0
Cutover Drive Test Report
Time is Almighty Page 3 of 16
1 OVERVIEW
This report presents the results of the Drive Test performed for Ramayampet for the TTSL- T&R CDMA 2000
1XRTT network.
1.1 Evaluation Objectives
The objective of this evaluation is site Ramayampet
Sl.
No.
Cell
Number
Sector Site Name Latitude Longitude Azimuth PN
Sector
Antenna
Type
M Tilt
ZTE
BSC
1 41 0 Ramayampet 18.116083 78.427694 30 135 739624 4 4
1 41 1 Ramayampet 18.116083 78.427694 130 303 739624 3 4
1 41 2 Ramayampet 18.116083 78.427694 260 471 739624 3 4
1.2 Evaluation Process
The site performance is evaluated through Pre & Post drive tests on the agreed drive routes within the
specified coverage zone. Network Coverage and call performance have been compared and verified by these
tests.
Table -1 Evaluation Procedures of Network in Ramayampet
Period Work contents Test Items Participating
personnel
Duration
16/03/2008 Pre-DT Long voice call;
Short voice call;
Data download
The satisfactory completion of this evaluation came from the co-endeavor of the TTSL and ZTE
Corporation.
Document Revision No: 1.0
Cutover Drive Test Report
Time is Almighty Page 4 of 16
1.3 Devices Used in one DT team
Table -2 Tools and Software used in one DT team
DRIVE TEST TOOLS
ITEMS QUANTITY COMMENTS
ZXPOS CNT1 (with dongle) 1 Drive Test Tool
ZXPOS CNA1 (with dongle) 1 Analysis Tool
Laptop 1
Provide the Platform where we Install the Drive
Test and Analysis Tool, and do the Drive Test
activity and analysis of the drive test data,
Handset with data cable 3
The handset type is PANTECH
Test Mobile for the Drive Test activities. One is
for the short call, one is for the long call, the
other one is for data download.
Power Inverter 1
To provide AC power supply to Drive test
equipments.
External GPS 1 For logging the routes
Vector Map(MapInfo format)
1
Provide the Information regarding Roads,
Railway Tracks, Streets etc, which is helpful
during the drive Test activity to make the drive
Test route.
Document Revision No: 1.0
Cutover Drive Test Report
Time is Almighty Page 5 of 16
Table -3 Voice Call Duration Time
Table -4 Data Call Setup
Data Call Setup
Type File Size
1X data call FTP Down Load 2MB (Zip File)
FTP server IP 172.23.129.245
Short Call Setup
Configuration Time(sec)
Call Setup Time 10s
Call Holding Time 30s
Idle Time 10s
Long Call Setup
Configuration Time(sec)
Call Setup Time 10s
Call Holding Time Infinite
Idle Time 0 s
Document Revision No: 1.0
Cutover Drive Test Report
Time is Almighty Page 6 of 16
1.4 DT Routes
The DT routes are shown in following figure:
Document Revision No: 1.0
Cutover Drive Test Report
Time is Almighty Page 7 of 16
2 DRIVE PLOTS FOR THE PRE-CUT & POST
CUT
2.1 Mobile Rx Power (Long Call)
2.1.1 PRE-Mobile Receive Power Plot (Long Call)
Figure -1 Rx Power test result
Document Revision No: 1.0
Cutover Drive Test Report
Time is Almighty Page 8 of 16
2.2 Mobile Tx Power (Long Call)
2.2.1 PRE- Mobile Transmit Power (Long Call)
Document Revision No: 1.0
Cutover Drive Test Report
Time is Almighty Page 9 of 16
2.3 Forward Frame Error Rate (F-FER)
2.3.1 PRE- Forward Frame Error Rate (F-FER)
Document Revision No: 1.0
Cutover Drive Test Report
Time is Almighty Page 10 of 16
2.4 Aggregate Ec/Io (Long Call) with Drop call
2.4.1 PRE- Aggregate Ec/Io (Long Call) with Drop call
Document Revision No: 1.0
Cutover Drive Test Report
Time is Almighty Page 11 of 16
2.5 Aggregate Ec/Io (Short Call) with Access Fail
2.5.1 PRE- Aggregate Ec/Io (Short Call) with Access Fail
Document Revision No: 1.0
Cutover Drive Test Report
Time is Almighty Page 12 of 16
2.6 Active PN Plot (Long Call)
2.6.1 PRE- Active PN Plot
Document Revision No: 1.0
Cutover Drive Test Report
Time is Almighty Page 13 of 16
2.7 No. of PN in active set
2.7.1 PRE- No. of PN in active set
Document Revision No: 1.0
Cutover Drive Test Report
Time is Almighty Page 14 of 16
2.8 Forward RLP Throughput
2.8.1 PRE- Forward RLP Throughput
Document Revision No: 1.0
Cutover Drive Test Report
Time is Almighty Page 15 of 16
3 PERFORMANCE STATISTICS FOR THE
PRE-CUT & POST CUT DRIVE TEST
Following Comparison are obtained from pre and post drive test for Ramayampet
3.1 Long Call Report
3.2 Short Call Report
3.3 Data Report
3.4 Handoff Detail report
Document Revision No: 1.0
Cutover Drive Test Report
Time is Almighty Page 16 of 16
Acceptance Status
Accepted:
Remark:
TTSL Representative:
ZTE Representative
Date:

More Related Content

What's hot

Sdcch Blocking Analysis
Sdcch Blocking AnalysisSdcch Blocking Analysis
Sdcch Blocking AnalysisAssim Mubder
 
Lte drive test parameter introduction
Lte drive test parameter introductionLte drive test parameter introduction
Lte drive test parameter introductionRay KHASTUR
 
Umts access kpi troubleshooting guide rrc
Umts access kpi troubleshooting guide   rrcUmts access kpi troubleshooting guide   rrc
Umts access kpi troubleshooting guide rrcPrashant Gaurav
 
03 gsm bss network kpi (sdcch congestion rate) optimization manual
03 gsm bss network kpi (sdcch congestion rate) optimization manual03 gsm bss network kpi (sdcch congestion rate) optimization manual
03 gsm bss network kpi (sdcch congestion rate) optimization manualtharinduwije
 
WCDMA RF optimization
WCDMA RF optimizationWCDMA RF optimization
WCDMA RF optimizationbasioni
 
Gsm rf-optimization
Gsm rf-optimizationGsm rf-optimization
Gsm rf-optimizationkarimfeel
 
Umts network protocols and complete call flows
Umts network protocols and complete call flowsUmts network protocols and complete call flows
Umts network protocols and complete call flowssivakumar D
 
2G optimization_with_optima
2G optimization_with_optima2G optimization_with_optima
2G optimization_with_optimaZIZI Yahia
 
Huawei - Access failures troubleshooting work shop
Huawei - Access failures troubleshooting work shopHuawei - Access failures troubleshooting work shop
Huawei - Access failures troubleshooting work shopnavaidkhan
 
Wcdma dt analysis using TEMS Investigation
Wcdma dt analysis using TEMS InvestigationWcdma dt analysis using TEMS Investigation
Wcdma dt analysis using TEMS InvestigationMichael Ofili
 
Lte basic parameters
Lte basic parametersLte basic parameters
Lte basic parametersLinh Phạm
 
Hw lte rf-optimization-guide
Hw lte rf-optimization-guideHw lte rf-optimization-guide
Hw lte rf-optimization-guidetharinduwije
 
Huawei wcdma ran10.0 overview
Huawei wcdma ran10.0 overviewHuawei wcdma ran10.0 overview
Huawei wcdma ran10.0 overviewRiadh Bachrouch
 
395317358-LTE-Resource-Usage-Optimization.pptx
395317358-LTE-Resource-Usage-Optimization.pptx395317358-LTE-Resource-Usage-Optimization.pptx
395317358-LTE-Resource-Usage-Optimization.pptxSudheeraIndrajith
 
Wcdma power control
Wcdma power controlWcdma power control
Wcdma power controlMostafa Adel
 

What's hot (20)

Drive Test Nemo
Drive Test NemoDrive Test Nemo
Drive Test Nemo
 
Lte optimization
Lte optimizationLte optimization
Lte optimization
 
Sdcch Blocking Analysis
Sdcch Blocking AnalysisSdcch Blocking Analysis
Sdcch Blocking Analysis
 
Lte drive test parameter introduction
Lte drive test parameter introductionLte drive test parameter introduction
Lte drive test parameter introduction
 
Umts access kpi troubleshooting guide rrc
Umts access kpi troubleshooting guide   rrcUmts access kpi troubleshooting guide   rrc
Umts access kpi troubleshooting guide rrc
 
Lte1841
Lte1841Lte1841
Lte1841
 
03 gsm bss network kpi (sdcch congestion rate) optimization manual
03 gsm bss network kpi (sdcch congestion rate) optimization manual03 gsm bss network kpi (sdcch congestion rate) optimization manual
03 gsm bss network kpi (sdcch congestion rate) optimization manual
 
WCDMA RF optimization
WCDMA RF optimizationWCDMA RF optimization
WCDMA RF optimization
 
Gsm rf-optimization
Gsm rf-optimizationGsm rf-optimization
Gsm rf-optimization
 
Umts network protocols and complete call flows
Umts network protocols and complete call flowsUmts network protocols and complete call flows
Umts network protocols and complete call flows
 
Lte kpis
Lte kpisLte kpis
Lte kpis
 
2G optimization_with_optima
2G optimization_with_optima2G optimization_with_optima
2G optimization_with_optima
 
Huawei - Access failures troubleshooting work shop
Huawei - Access failures troubleshooting work shopHuawei - Access failures troubleshooting work shop
Huawei - Access failures troubleshooting work shop
 
Wcdma dt analysis using TEMS Investigation
Wcdma dt analysis using TEMS InvestigationWcdma dt analysis using TEMS Investigation
Wcdma dt analysis using TEMS Investigation
 
LTE optimization
LTE optimizationLTE optimization
LTE optimization
 
Lte basic parameters
Lte basic parametersLte basic parameters
Lte basic parameters
 
Hw lte rf-optimization-guide
Hw lte rf-optimization-guideHw lte rf-optimization-guide
Hw lte rf-optimization-guide
 
Huawei wcdma ran10.0 overview
Huawei wcdma ran10.0 overviewHuawei wcdma ran10.0 overview
Huawei wcdma ran10.0 overview
 
395317358-LTE-Resource-Usage-Optimization.pptx
395317358-LTE-Resource-Usage-Optimization.pptx395317358-LTE-Resource-Usage-Optimization.pptx
395317358-LTE-Resource-Usage-Optimization.pptx
 
Wcdma power control
Wcdma power controlWcdma power control
Wcdma power control
 

Viewers also liked

WCDMA Tems Parameters Investigation and Drive Testing
WCDMA Tems Parameters Investigation and Drive TestingWCDMA Tems Parameters Investigation and Drive Testing
WCDMA Tems Parameters Investigation and Drive TestingS Mohib Naqvi
 
Dt parameters
Dt parametersDt parameters
Dt parameterssangwa85
 
Qiod final inspection report.xls
Qiod final inspection report.xlsQiod final inspection report.xls
Qiod final inspection report.xlsY K Simon
 
Report on wireless System CDMA security
Report on wireless System CDMA securityReport on wireless System CDMA security
Report on wireless System CDMA securityViVek Patel
 
CDMA1X Pilot Panorama introduction
CDMA1X Pilot Panorama introductionCDMA1X Pilot Panorama introduction
CDMA1X Pilot Panorama introductionTempus Telcosys
 
C cf radio propagation theory and propagation models
C cf radio propagation theory and propagation modelsC cf radio propagation theory and propagation models
C cf radio propagation theory and propagation modelsTempus Telcosys
 
RG000006 CDMA 1X handoff algorithm
RG000006 CDMA 1X handoff algorithmRG000006 CDMA 1X handoff algorithm
RG000006 CDMA 1X handoff algorithmTempus Telcosys
 
Tempus Telcosys Telco and IT
Tempus Telcosys Telco and ITTempus Telcosys Telco and IT
Tempus Telcosys Telco and ITPankaj Dixit
 
ORG010202 CDMA 1x Handoff Algorithm
ORG010202 CDMA 1x Handoff AlgorithmORG010202 CDMA 1x Handoff Algorithm
ORG010202 CDMA 1x Handoff AlgorithmTempus Telcosys
 

Viewers also liked (20)

Drive Test
Drive TestDrive Test
Drive Test
 
WCDMA Tems Parameters Investigation and Drive Testing
WCDMA Tems Parameters Investigation and Drive TestingWCDMA Tems Parameters Investigation and Drive Testing
WCDMA Tems Parameters Investigation and Drive Testing
 
Dt parameters
Dt parametersDt parameters
Dt parameters
 
Qiod final inspection report.xls
Qiod final inspection report.xlsQiod final inspection report.xls
Qiod final inspection report.xls
 
Report on wireless System CDMA security
Report on wireless System CDMA securityReport on wireless System CDMA security
Report on wireless System CDMA security
 
CDMA Project
CDMA ProjectCDMA Project
CDMA Project
 
08. DRIVE TEST Analysis
08. DRIVE TEST Analysis08. DRIVE TEST Analysis
08. DRIVE TEST Analysis
 
Gsm1
Gsm1Gsm1
Gsm1
 
Channelconfih s9
Channelconfih s9Channelconfih s9
Channelconfih s9
 
3g
3g3g
3g
 
CDMA1X Pilot Panorama introduction
CDMA1X Pilot Panorama introductionCDMA1X Pilot Panorama introduction
CDMA1X Pilot Panorama introduction
 
C cf radio propagation theory and propagation models
C cf radio propagation theory and propagation modelsC cf radio propagation theory and propagation models
C cf radio propagation theory and propagation models
 
3g
3g3g
3g
 
BSS Dimensioning
BSS DimensioningBSS Dimensioning
BSS Dimensioning
 
RG000006 CDMA 1X handoff algorithm
RG000006 CDMA 1X handoff algorithmRG000006 CDMA 1X handoff algorithm
RG000006 CDMA 1X handoff algorithm
 
Tempus Telcosys Telco and IT
Tempus Telcosys Telco and ITTempus Telcosys Telco and IT
Tempus Telcosys Telco and IT
 
03 Wireless Concept
03 Wireless Concept03 Wireless Concept
03 Wireless Concept
 
Ch 04 HANDOVER_gvl
Ch 04 HANDOVER_gvlCh 04 HANDOVER_gvl
Ch 04 HANDOVER_gvl
 
ORG010202 CDMA 1x Handoff Algorithm
ORG010202 CDMA 1x Handoff AlgorithmORG010202 CDMA 1x Handoff Algorithm
ORG010202 CDMA 1x Handoff Algorithm
 
GSM Introduction
GSM IntroductionGSM Introduction
GSM Introduction
 

Similar to CDMA Drive Test Report Format

fdocuments.in_ericsson-documentsmx-ericsson-field-guide-for-utran.pdf
fdocuments.in_ericsson-documentsmx-ericsson-field-guide-for-utran.pdffdocuments.in_ericsson-documentsmx-ericsson-field-guide-for-utran.pdf
fdocuments.in_ericsson-documentsmx-ericsson-field-guide-for-utran.pdfSaidHaman
 
Ericsson documents.mx ericsson-field-guide-for-utran
Ericsson documents.mx ericsson-field-guide-for-utranEricsson documents.mx ericsson-field-guide-for-utran
Ericsson documents.mx ericsson-field-guide-for-utranThananan numatti
 
W handover-and-call-drop-problem-optimization-guide-20081223-a-3 3
W handover-and-call-drop-problem-optimization-guide-20081223-a-3 3W handover-and-call-drop-problem-optimization-guide-20081223-a-3 3
W handover-and-call-drop-problem-optimization-guide-20081223-a-3 3Christian Rodriguez
 
High_Speed_TCP_for_Large_Congestion_Windows.pdf
High_Speed_TCP_for_Large_Congestion_Windows.pdfHigh_Speed_TCP_for_Large_Congestion_Windows.pdf
High_Speed_TCP_for_Large_Congestion_Windows.pdfSHIKHAARYA26
 
High_Speed_TCP_for_Large_Congestion_Windows.pdf
High_Speed_TCP_for_Large_Congestion_Windows.pdfHigh_Speed_TCP_for_Large_Congestion_Windows.pdf
High_Speed_TCP_for_Large_Congestion_Windows.pdfSHIKHAARYA26
 
SJ-20140527134054-013-ZXUR 9000 UMTS (V4.13.10.15) Radio Parameter Reference_...
SJ-20140527134054-013-ZXUR 9000 UMTS (V4.13.10.15) Radio Parameter Reference_...SJ-20140527134054-013-ZXUR 9000 UMTS (V4.13.10.15) Radio Parameter Reference_...
SJ-20140527134054-013-ZXUR 9000 UMTS (V4.13.10.15) Radio Parameter Reference_...tunaVNP
 
02 gsm bss network kpi (sdcch call drop rate) optimization manual
02 gsm bss network kpi (sdcch call drop rate) optimization manual02 gsm bss network kpi (sdcch call drop rate) optimization manual
02 gsm bss network kpi (sdcch call drop rate) optimization manualtharinduwije
 
P1 cl39 bm_dt kpi_acceptance report
P1 cl39 bm_dt kpi_acceptance reportP1 cl39 bm_dt kpi_acceptance report
P1 cl39 bm_dt kpi_acceptance reportaqazad
 
54 gsm bss network performance ps kpi (rtt delay) optimization manual[1].doc
54 gsm bss network performance ps kpi (rtt delay) optimization manual[1].doc54 gsm bss network performance ps kpi (rtt delay) optimization manual[1].doc
54 gsm bss network performance ps kpi (rtt delay) optimization manual[1].doctharinduwije
 
SJ-20140527134054-018-ZXUR 9000 UMTS (V4.13.10.15) Calling Trace Operation Gu...
SJ-20140527134054-018-ZXUR 9000 UMTS (V4.13.10.15) Calling Trace Operation Gu...SJ-20140527134054-018-ZXUR 9000 UMTS (V4.13.10.15) Calling Trace Operation Gu...
SJ-20140527134054-018-ZXUR 9000 UMTS (V4.13.10.15) Calling Trace Operation Gu...tunaVNP
 
50 gsm bss network ps kpi (download rate) optimization manual[1].doc
50 gsm bss network ps kpi (download rate) optimization manual[1].doc50 gsm bss network ps kpi (download rate) optimization manual[1].doc
50 gsm bss network ps kpi (download rate) optimization manual[1].doctharinduwije
 
Tems investigation 13.1 release note
Tems investigation 13.1 release noteTems investigation 13.1 release note
Tems investigation 13.1 release notetelecom_200
 
Technical report pinger
Technical report  pingerTechnical report  pinger
Technical report pingerRaheel Raza
 
SJ-20140527134054-011-ZXUR 9000 UMTS (V4.13.10.15) Performance Index Referenc...
SJ-20140527134054-011-ZXUR 9000 UMTS (V4.13.10.15) Performance Index Referenc...SJ-20140527134054-011-ZXUR 9000 UMTS (V4.13.10.15) Performance Index Referenc...
SJ-20140527134054-011-ZXUR 9000 UMTS (V4.13.10.15) Performance Index Referenc...tunaVNP
 
NetSIm Technology Library- Cognitive radio
NetSIm Technology Library- Cognitive radioNetSIm Technology Library- Cognitive radio
NetSIm Technology Library- Cognitive radioVishal Sharma
 

Similar to CDMA Drive Test Report Format (20)

fdocuments.in_ericsson-documentsmx-ericsson-field-guide-for-utran.pdf
fdocuments.in_ericsson-documentsmx-ericsson-field-guide-for-utran.pdffdocuments.in_ericsson-documentsmx-ericsson-field-guide-for-utran.pdf
fdocuments.in_ericsson-documentsmx-ericsson-field-guide-for-utran.pdf
 
Ericsson documents.mx ericsson-field-guide-for-utran
Ericsson documents.mx ericsson-field-guide-for-utranEricsson documents.mx ericsson-field-guide-for-utran
Ericsson documents.mx ericsson-field-guide-for-utran
 
W handover-and-call-drop-problem-optimization-guide-20081223-a-3 3
W handover-and-call-drop-problem-optimization-guide-20081223-a-3 3W handover-and-call-drop-problem-optimization-guide-20081223-a-3 3
W handover-and-call-drop-problem-optimization-guide-20081223-a-3 3
 
Handover 3g
Handover 3gHandover 3g
Handover 3g
 
High_Speed_TCP_for_Large_Congestion_Windows.pdf
High_Speed_TCP_for_Large_Congestion_Windows.pdfHigh_Speed_TCP_for_Large_Congestion_Windows.pdf
High_Speed_TCP_for_Large_Congestion_Windows.pdf
 
High_Speed_TCP_for_Large_Congestion_Windows.pdf
High_Speed_TCP_for_Large_Congestion_Windows.pdfHigh_Speed_TCP_for_Large_Congestion_Windows.pdf
High_Speed_TCP_for_Large_Congestion_Windows.pdf
 
SJ-20140527134054-013-ZXUR 9000 UMTS (V4.13.10.15) Radio Parameter Reference_...
SJ-20140527134054-013-ZXUR 9000 UMTS (V4.13.10.15) Radio Parameter Reference_...SJ-20140527134054-013-ZXUR 9000 UMTS (V4.13.10.15) Radio Parameter Reference_...
SJ-20140527134054-013-ZXUR 9000 UMTS (V4.13.10.15) Radio Parameter Reference_...
 
02 gsm bss network kpi (sdcch call drop rate) optimization manual
02 gsm bss network kpi (sdcch call drop rate) optimization manual02 gsm bss network kpi (sdcch call drop rate) optimization manual
02 gsm bss network kpi (sdcch call drop rate) optimization manual
 
172809159 sip
172809159 sip172809159 sip
172809159 sip
 
P1 cl39 bm_dt kpi_acceptance report
P1 cl39 bm_dt kpi_acceptance reportP1 cl39 bm_dt kpi_acceptance report
P1 cl39 bm_dt kpi_acceptance report
 
Oc130 v4hp3000ug
Oc130 v4hp3000ugOc130 v4hp3000ug
Oc130 v4hp3000ug
 
be_report - report
be_report - reportbe_report - report
be_report - report
 
54 gsm bss network performance ps kpi (rtt delay) optimization manual[1].doc
54 gsm bss network performance ps kpi (rtt delay) optimization manual[1].doc54 gsm bss network performance ps kpi (rtt delay) optimization manual[1].doc
54 gsm bss network performance ps kpi (rtt delay) optimization manual[1].doc
 
SJ-20140527134054-018-ZXUR 9000 UMTS (V4.13.10.15) Calling Trace Operation Gu...
SJ-20140527134054-018-ZXUR 9000 UMTS (V4.13.10.15) Calling Trace Operation Gu...SJ-20140527134054-018-ZXUR 9000 UMTS (V4.13.10.15) Calling Trace Operation Gu...
SJ-20140527134054-018-ZXUR 9000 UMTS (V4.13.10.15) Calling Trace Operation Gu...
 
50 gsm bss network ps kpi (download rate) optimization manual[1].doc
50 gsm bss network ps kpi (download rate) optimization manual[1].doc50 gsm bss network ps kpi (download rate) optimization manual[1].doc
50 gsm bss network ps kpi (download rate) optimization manual[1].doc
 
Tems investigation 13.1 release note
Tems investigation 13.1 release noteTems investigation 13.1 release note
Tems investigation 13.1 release note
 
TR-069_Amendment-5
TR-069_Amendment-5TR-069_Amendment-5
TR-069_Amendment-5
 
Technical report pinger
Technical report  pingerTechnical report  pinger
Technical report pinger
 
SJ-20140527134054-011-ZXUR 9000 UMTS (V4.13.10.15) Performance Index Referenc...
SJ-20140527134054-011-ZXUR 9000 UMTS (V4.13.10.15) Performance Index Referenc...SJ-20140527134054-011-ZXUR 9000 UMTS (V4.13.10.15) Performance Index Referenc...
SJ-20140527134054-011-ZXUR 9000 UMTS (V4.13.10.15) Performance Index Referenc...
 
NetSIm Technology Library- Cognitive radio
NetSIm Technology Library- Cognitive radioNetSIm Technology Library- Cognitive radio
NetSIm Technology Library- Cognitive radio
 

More from Tempus Telcosys

Ultrasite technical for 4op
Ultrasite technical for 4opUltrasite technical for 4op
Ultrasite technical for 4opTempus Telcosys
 
Introduction to Genex Assistance
Introduction to  Genex AssistanceIntroduction to  Genex Assistance
Introduction to Genex AssistanceTempus Telcosys
 
Transmission management in BSS
Transmission management in BSSTransmission management in BSS
Transmission management in BSSTempus Telcosys
 
Cdma2000 network problem analysis with mobile station 20030212-a-v1.0
Cdma2000 network problem analysis with mobile station 20030212-a-v1.0Cdma2000 network problem analysis with mobile station 20030212-a-v1.0
Cdma2000 network problem analysis with mobile station 20030212-a-v1.0Tempus Telcosys
 
QCTest™ CDMA Air Interface Tester (CAIT™) 3.1 User’s Guide
QCTest™ CDMA Air Interface Tester (CAIT™)  3.1 User’s GuideQCTest™ CDMA Air Interface Tester (CAIT™)  3.1 User’s Guide
QCTest™ CDMA Air Interface Tester (CAIT™) 3.1 User’s GuideTempus Telcosys
 
C cf introduction to antenna
C cf introduction to antennaC cf introduction to antenna
C cf introduction to antennaTempus Telcosys
 
CDMA 1x Introduction to Power Control Issue2.1
CDMA 1x Introduction to Power Control Issue2.1CDMA 1x Introduction to Power Control Issue2.1
CDMA 1x Introduction to Power Control Issue2.1Tempus Telcosys
 
CDMA 2000 Principle Issue4.0
CDMA 2000 Principle Issue4.0CDMA 2000 Principle Issue4.0
CDMA 2000 Principle Issue4.0Tempus Telcosys
 
Transmission fundamentals
Transmission fundamentalsTransmission fundamentals
Transmission fundamentalsTempus Telcosys
 
Training on microwave communication
Training on microwave communicationTraining on microwave communication
Training on microwave communicationTempus Telcosys
 

More from Tempus Telcosys (19)

Gsm
GsmGsm
Gsm
 
BASIC GSM
BASIC GSMBASIC GSM
BASIC GSM
 
02 channel concept
02 channel concept02 channel concept
02 channel concept
 
Ultrasite technical for 4op
Ultrasite technical for 4opUltrasite technical for 4op
Ultrasite technical for 4op
 
Introduction to Genex Assistance
Introduction to  Genex AssistanceIntroduction to  Genex Assistance
Introduction to Genex Assistance
 
Transmission management in BSS
Transmission management in BSSTransmission management in BSS
Transmission management in BSS
 
3g cdma-qualcom
3g cdma-qualcom3g cdma-qualcom
3g cdma-qualcom
 
Introduction to mapinfo
Introduction to mapinfoIntroduction to mapinfo
Introduction to mapinfo
 
Cdma2000 network problem analysis with mobile station 20030212-a-v1.0
Cdma2000 network problem analysis with mobile station 20030212-a-v1.0Cdma2000 network problem analysis with mobile station 20030212-a-v1.0
Cdma2000 network problem analysis with mobile station 20030212-a-v1.0
 
QCTest™ CDMA Air Interface Tester (CAIT™) 3.1 User’s Guide
QCTest™ CDMA Air Interface Tester (CAIT™)  3.1 User’s GuideQCTest™ CDMA Air Interface Tester (CAIT™)  3.1 User’s Guide
QCTest™ CDMA Air Interface Tester (CAIT™) 3.1 User’s Guide
 
C cf introduction to antenna
C cf introduction to antennaC cf introduction to antenna
C cf introduction to antenna
 
CDMA 1x Introduction to Power Control Issue2.1
CDMA 1x Introduction to Power Control Issue2.1CDMA 1x Introduction to Power Control Issue2.1
CDMA 1x Introduction to Power Control Issue2.1
 
CDMA 2000 Principle Issue4.0
CDMA 2000 Principle Issue4.0CDMA 2000 Principle Issue4.0
CDMA 2000 Principle Issue4.0
 
Gsm system antenna
Gsm system antennaGsm system antenna
Gsm system antenna
 
Transmission fundamentals
Transmission fundamentalsTransmission fundamentals
Transmission fundamentals
 
Training on microwave communication
Training on microwave communicationTraining on microwave communication
Training on microwave communication
 
LOS Survey
LOS SurveyLOS Survey
LOS Survey
 
Introduction to mapinfo
Introduction to mapinfoIntroduction to mapinfo
Introduction to mapinfo
 
GSM , RF & DT
GSM , RF & DTGSM , RF & DT
GSM , RF & DT
 

Recently uploaded

FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 

Recently uploaded (20)

FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 

CDMA Drive Test Report Format

  • 1. Document Revision No: 1.0 Cutover Drive Test Report Time is Almighty Page 1 of 16 Drive Test Report of Ramayanpet Cluster Name: T&R DocumentVersion1.0 ZTE CORPORATION ZTE Plaza, Keji Road South, Hi-Tech Industrial Park, Nanshan District, Shenzhen, P. R. China 518057 Tel: (86) 755 26771900 800-9830-9830 Fax: (86) 755 26772236 URL: http://support.zte.com.cn E-mail: doc@zte.com.cn
  • 2. Document Revision No: 1.0 Cutover Drive Test Report Time is Almighty Page 2 of 16 Contents 1 OVERVIEW.................................................................................................................. 3 1.1 Evaluation Objectives....................................................................................... 3 1.2 Evaluation Process............................................................................................ 3 1.3 Devices Used in one DT team .......................................................................... 4 1.4 DT Routes......................................................................................................... 6 2 Drive Plots for the Pre-cut & Post Cut ................................................................ 7 2.1 Mobile Rx Power (Long Call) .......................................................................... 7 2.1.1 PRE-Mobile Receive Power Plot (Long Call) ...................................................... 7 2.2 Mobile Tx Power (Long Call) .......................................................................... 8 2.2.1 PRE- Mobile Transmit Power (Long Call) ........................................................... 8 2.3 Forward Frame Error Rate (F-FER).................................................................. 9 2.3.1 PRE- Forward Frame Error Rate (F-FER)............................................................ 9 2.4 Aggregate Ec/Io (Long Call) with Drop call .................................................. 10 2.4.1 PRE- Aggregate Ec/Io (Long Call) with Drop call ............................................. 10 2.5 Aggregate Ec/Io (Short Call) with Access Fail.............................................. 11 2.5.1 PRE- Aggregate Ec/Io (Short Call) with Access Fail ........................................ 11 2.6 Active PN Plot (Long Call)............................................................................. 12 2.6.1 PRE- Active PN Plot .......................................................................................... 12 2.7 No. of PN in active set .................................................................................... 13 2.7.1 PRE- No. of PN in active set .............................................................................. 13 2.8 Forward RLP Throughput............................................................................... 14 2.8.1 PRE- Forward RLP Throughput ......................................................................... 14 3 PERFORMANCE Statistics for the Pre-cut & Post Cut Drive Test..................... 15 3.1 Long Call Report............................................................................................. 15 3.2 Short Call Report ............................................................................................ 15 3.3 Data Report ..................................................................................................... 15 3.4 Handoff Detail report...................................................................................... 15
  • 3. Document Revision No: 1.0 Cutover Drive Test Report Time is Almighty Page 3 of 16 1 OVERVIEW This report presents the results of the Drive Test performed for Ramayampet for the TTSL- T&R CDMA 2000 1XRTT network. 1.1 Evaluation Objectives The objective of this evaluation is site Ramayampet Sl. No. Cell Number Sector Site Name Latitude Longitude Azimuth PN Sector Antenna Type M Tilt ZTE BSC 1 41 0 Ramayampet 18.116083 78.427694 30 135 739624 4 4 1 41 1 Ramayampet 18.116083 78.427694 130 303 739624 3 4 1 41 2 Ramayampet 18.116083 78.427694 260 471 739624 3 4 1.2 Evaluation Process The site performance is evaluated through Pre & Post drive tests on the agreed drive routes within the specified coverage zone. Network Coverage and call performance have been compared and verified by these tests. Table -1 Evaluation Procedures of Network in Ramayampet Period Work contents Test Items Participating personnel Duration 16/03/2008 Pre-DT Long voice call; Short voice call; Data download The satisfactory completion of this evaluation came from the co-endeavor of the TTSL and ZTE Corporation.
  • 4. Document Revision No: 1.0 Cutover Drive Test Report Time is Almighty Page 4 of 16 1.3 Devices Used in one DT team Table -2 Tools and Software used in one DT team DRIVE TEST TOOLS ITEMS QUANTITY COMMENTS ZXPOS CNT1 (with dongle) 1 Drive Test Tool ZXPOS CNA1 (with dongle) 1 Analysis Tool Laptop 1 Provide the Platform where we Install the Drive Test and Analysis Tool, and do the Drive Test activity and analysis of the drive test data, Handset with data cable 3 The handset type is PANTECH Test Mobile for the Drive Test activities. One is for the short call, one is for the long call, the other one is for data download. Power Inverter 1 To provide AC power supply to Drive test equipments. External GPS 1 For logging the routes Vector Map(MapInfo format) 1 Provide the Information regarding Roads, Railway Tracks, Streets etc, which is helpful during the drive Test activity to make the drive Test route.
  • 5. Document Revision No: 1.0 Cutover Drive Test Report Time is Almighty Page 5 of 16 Table -3 Voice Call Duration Time Table -4 Data Call Setup Data Call Setup Type File Size 1X data call FTP Down Load 2MB (Zip File) FTP server IP 172.23.129.245 Short Call Setup Configuration Time(sec) Call Setup Time 10s Call Holding Time 30s Idle Time 10s Long Call Setup Configuration Time(sec) Call Setup Time 10s Call Holding Time Infinite Idle Time 0 s
  • 6. Document Revision No: 1.0 Cutover Drive Test Report Time is Almighty Page 6 of 16 1.4 DT Routes The DT routes are shown in following figure:
  • 7. Document Revision No: 1.0 Cutover Drive Test Report Time is Almighty Page 7 of 16 2 DRIVE PLOTS FOR THE PRE-CUT & POST CUT 2.1 Mobile Rx Power (Long Call) 2.1.1 PRE-Mobile Receive Power Plot (Long Call) Figure -1 Rx Power test result
  • 8. Document Revision No: 1.0 Cutover Drive Test Report Time is Almighty Page 8 of 16 2.2 Mobile Tx Power (Long Call) 2.2.1 PRE- Mobile Transmit Power (Long Call)
  • 9. Document Revision No: 1.0 Cutover Drive Test Report Time is Almighty Page 9 of 16 2.3 Forward Frame Error Rate (F-FER) 2.3.1 PRE- Forward Frame Error Rate (F-FER)
  • 10. Document Revision No: 1.0 Cutover Drive Test Report Time is Almighty Page 10 of 16 2.4 Aggregate Ec/Io (Long Call) with Drop call 2.4.1 PRE- Aggregate Ec/Io (Long Call) with Drop call
  • 11. Document Revision No: 1.0 Cutover Drive Test Report Time is Almighty Page 11 of 16 2.5 Aggregate Ec/Io (Short Call) with Access Fail 2.5.1 PRE- Aggregate Ec/Io (Short Call) with Access Fail
  • 12. Document Revision No: 1.0 Cutover Drive Test Report Time is Almighty Page 12 of 16 2.6 Active PN Plot (Long Call) 2.6.1 PRE- Active PN Plot
  • 13. Document Revision No: 1.0 Cutover Drive Test Report Time is Almighty Page 13 of 16 2.7 No. of PN in active set 2.7.1 PRE- No. of PN in active set
  • 14. Document Revision No: 1.0 Cutover Drive Test Report Time is Almighty Page 14 of 16 2.8 Forward RLP Throughput 2.8.1 PRE- Forward RLP Throughput
  • 15. Document Revision No: 1.0 Cutover Drive Test Report Time is Almighty Page 15 of 16 3 PERFORMANCE STATISTICS FOR THE PRE-CUT & POST CUT DRIVE TEST Following Comparison are obtained from pre and post drive test for Ramayampet 3.1 Long Call Report 3.2 Short Call Report 3.3 Data Report 3.4 Handoff Detail report
  • 16. Document Revision No: 1.0 Cutover Drive Test Report Time is Almighty Page 16 of 16 Acceptance Status Accepted: Remark: TTSL Representative: ZTE Representative Date: