PONENTE: Miguel Á. Castillo Acero
VP Desarrollo Tecnológico

12-12-13
•

Visión General de Aernnova

•

Estrategia Tecnológica de Aernnova

•
Dos Ejemplos de Desarrollo Tecnológico en Aernnova...
BASIC OVERVIEW
ACTIVITIES

MAIN DATA

 Leading Tier 1 group of Aerostructures. Aernnova’s
core activity is the design, de...
Historical Milestones

Fibertecnic’s creation
for composite
components
fabrication.

1986

1993

- Sikorsky S-92 D&B/RSP c...
Headquartered in Spain, Aernnova has expanded its presence globally through its
Manufacturing Facilities and Engineering C...
•

Visión General de Aernnova

•

Estrategia Tecnológica de Aernnova

•
Dos Ejemplos de Desarrollo Tecnológico en Aernnova...
Aernnova strategy is to develop
technologies instead of acquiring them

Key Drivers
SELECTION
PROCESS

Market Drivers

– A...
R&D Technology
Aernnova, R&D Centers

R&D Basic Research
Universities, Scientific Institutions

Pág. 8

OEM
AERNNOVA

OEM,...
•

Visión General de Aernnova

•

Estrategia Tecnológica de Aernnova

•
Dos Ejemplos de Desarrollo Tecnológico en Aernnova...
FABRICACIÓN DE ALTO VALOR AÑADIDO
AERNNOVA desarrolla herramientas de simulación numérica en paralelo al desarrollo de sus...
MEJORA DEL PROCESO DE MONTAJE DE ESTRUCTURAS (I)

1

2

ENSAYOS VIRTUALES DEL REMACHADO
(FEM detallados)

CARACTERIZACIÓN
...
MEJORA DEL PROCESO DE MONTAJE DE ESTRUCTURAS (II)

3

Diseño del ensayo y bancada
de validación

Pág. 12

4
Simulación FEM...
OPTIMIZACIÓN DE PROCESO DE PEEN- FORMING (I)
Complejidad Incremental en el Desarrollo:
Criterios de madurez por hitos defi...
OPTIMIZACIÓN DE PROCESO DE PEEN- FORMING (II)
3.- Peen-forming en placas
Modelo de Simulación
Placas Sencillas

Pág. 14

S...
•

Visión General de Aernnova

•

Estrategia Tecnológica de Aernnova

•
Dos Ejemplos de Desarrollo Tecnológico en Aernnova...
Aeronautics R&D mainly linked to the participation of big programs that require:
• Financial Muscle with Institutional Aid...
Upcoming SlideShare
Loading in …5
×

Inspiring Day "Industria y Fábrica del Futuro" (Miguel Ángel Castillo - Aernnova)

503 views
363 views

Published on

Inspiring Day es un foro de encuentro donde visualizar escenarios futuros, desarrollar negocio o identificar nuevas oportunidades de diversificación, a través de la investigación y el desarrollo tecnológico.

Este evento tuvo lugar en Sevilla, en Parque Aerópolis, el 12 de diciembre de 2013.

Más información en <a>www.tecnalia.com/inspiringday/</a>

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
503
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
6
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Inspiring Day "Industria y Fábrica del Futuro" (Miguel Ángel Castillo - Aernnova)

  1. 1. PONENTE: Miguel Á. Castillo Acero VP Desarrollo Tecnológico 12-12-13
  2. 2. • Visión General de Aernnova • Estrategia Tecnológica de Aernnova • Dos Ejemplos de Desarrollo Tecnológico en Aernnova y Fabricación de Alto Valor Añadido o o • Pág. 2 Montaje de estructuras con Tolerancias Estrechas Proceso de Conformado por Peen Forming Resumen
  3. 3. BASIC OVERVIEW ACTIVITIES MAIN DATA  Leading Tier 1 group of Aerostructures. Aernnova’s core activity is the design, development and production of complete aerostructures for OEM’s.  Revenues Mill. USD 2011 2012 715 857 812 900 Consolidated • Aerostructures and Composites Components, Tier 1 (D&B or BtP) • Engineering (Complete WP’s and sustainining engineering) • Aerometallic 2010 Aggregated  Activities: 2009 530 546 661 732  Employees 4.500  R & D Exp. 12 % / Revenues BUSINESS MODEL  LONG TERM COMPETITIVENESS based on Technology, Global Footprint and Flexibility  TECHNOLOGY  GLOBAL FOOTPRINT Europe  Spain , Romania América  México, USA, Brazil Asia  China, India (2011 - 2012)  FLEXIBILITY Pág. 3 Strong Design and Manufacturing Engineering Adaptation to Customers’ Needs
  4. 4. Historical Milestones Fibertecnic’s creation for composite components fabrication. 1986 1993 - Sikorsky S-92 D&B/RSP contract (AFT Fuselage, MRB, HS, Interior). - First EMB 145 prototype delivered (May 1995). 1995 EMB 145 wings D&B/RSP contract (March 1993). Sino Swearingen SJ30 complete aircraft assembly for five prototypes. - Acquisition of INTEC-AIR (sheet metal components) in Cadiz - Assembly Plant in Brazil. 1996 1999 2000 2001 Bombardier CRJ 700/900 empennage Miñano Plant starts construction Pág. 4 EMB 170/190 empennages and rear fuselages D&B/RSP contract. Set up of 4 new plants: 2 for assembly (Berantevilla and Sevilla), for large machining (Tarazona) and for composites (Orense). -Acquisition of ICSA (composite components and associated aerostructures) in Tolledo New assembly plant in Seville. 2002 2004 - New assembly and metallic components facility in Mexico. AIRBUS A-380 D&B/RSP for the internal structure of the section 19 fuselage. - New engineering center in the USA. 2007 2008 - Bombardier C-Series Central Wing Box D&B Contract - AIRBUS A-350 Rudder AIRBUS A-350 horizontal stabilizer and pressure Bulkhead D&B contracts. - Eurocopter Superpuma Contract. 2009 … - Hawker Beechcraft contract for 5 business aircraft wings. AGUSTA rear fuselage NH-90 - Integration of all Alava assembly activities in Berantevilla.
  5. 5. Headquartered in Spain, Aernnova has expanded its presence globally through its Manufacturing Facilities and Engineering Centers in Europe, America and Asia       SPAIN Major Assemblies (2) Engineering (2) Composites (4) Aerometallic (3) Product Support USA Engineering CHINA ROMANIA    MEXICO Major Assemblies Aerometallic BRAZIL   Pág. 5 Major Assemblies Engineering  Tooling   INDIA Engineering Assemblies and Met. Comp. JV Special Projects
  6. 6. • Visión General de Aernnova • Estrategia Tecnológica de Aernnova • Dos Ejemplos de Desarrollo Tecnológico en Aernnova y Fabricación de Alto Valor Añadido o o • Pág. 6 Montaje de estructuras con Tolerancias Estrechas Proceso de Conformado por Peen Forming Resumen
  7. 7. Aernnova strategy is to develop technologies instead of acquiring them Key Drivers SELECTION PROCESS Market Drivers – Allows Aernnova to anticipate and satisfy market needs – Creates differentiating technology and IPR, which allows Aernnova to build competitive advantage • Benchmarking – Drives the development and enhancement of methods, technologiescomposites, processes, and tools metal, assembly Partners Customer Requirements • Pros and cons with respect to drivers • Current TRL Technologies • Maturity timing Aernnova Top Level Strategy • Suitability for next business opportunities Demonstrators Pág. 7
  8. 8. R&D Technology Aernnova, R&D Centers R&D Basic Research Universities, Scientific Institutions Pág. 8 OEM AERNNOVA OEM, Aernnova AERNNOVA AND EXTENDED TECHNOLOGY ENTERPRISE PARTNERS D System
  9. 9. • Visión General de Aernnova • Estrategia Tecnológica de Aernnova • Dos Ejemplos de Desarrollo Tecnológico en Aernnova y Fabricación de Alto Valor Añadido o o • Pág. 9 Montaje de estructuras con Tolerancias Estrechas Proceso de Conformado por Peen Forming Resumen
  10. 10. FABRICACIÓN DE ALTO VALOR AÑADIDO AERNNOVA desarrolla herramientas de simulación numérica en paralelo al desarrollo de sus procesos productivos avanzados. Dos ejemplos de desarrollo tecnológico recientes para: 1.- La mejora de tolerancias resultado del montaje de estructuras de avión 2.- La optimización de la materia prima en la producción de elementos metálicos por mecanizado El desarrollo para su posterior uso de herramientas de simulación propias, antes del despliegue de los nuevos procesos productivos, habilita ahorros de tiempo, minimiza las inversiones y reduce los costes de no calidad, entre otros puntos clave. Pág. 10
  11. 11. MEJORA DEL PROCESO DE MONTAJE DE ESTRUCTURAS (I) 1 2 ENSAYOS VIRTUALES DEL REMACHADO (FEM detallados) CARACTERIZACIÓN EXPERIMENTAL DE LA UNIÓN REMACHADA MODELO FEM SIMPLIFICADO DE LA UNIÓN Pág. 11 ANÁLISIS DE INFLUENCIA DE PARÁMETROS - Diámetros bulones - Interferencia agujero- bulón - Pares de apriete - Adición de arandelas - Perpendicularidad - Espesores y materiales...
  12. 12. MEJORA DEL PROCESO DE MONTAJE DE ESTRUCTURAS (II) 3 Diseño del ensayo y bancada de validación Pág. 12 4 Simulación FEM de los ensayos de validación 5 Ensayos de validación
  13. 13. OPTIMIZACIÓN DE PROCESO DE PEEN- FORMING (I) Complejidad Incremental en el Desarrollo: Criterios de madurez por hitos definidos a priori para validación intermedia 1.- Impacto simple Caracterización Material Parámetros críticos: 2.- Impactos Múltiples Simulación Impacto Simple Validación Modelo Material Primer Modelo Recuperación Elástica • Espesor • Diámetro bola • Flujo • Velocidad media Modelo Impactos Múltiples Tensión s11 promedio dentro de la zona de impacto. Espesor 8mm Tensión (Mpas) 100 0 Sim ulac Vs Perfilom _P3-5_PathY Instante_1_CT_16,05% Instante_2_CT_29,53% Instante_3_CT_40,84% Instante_4_CT_50,34% Instante_5_CT_58,31% Instante_6_CT_65,00% Instante_7_CT_70,62% Instante_8_CT_75,33% Instante_9_CT_79,29% Instante_10_CT_82,62% Instante_11_CT_85,41% Instante_12_CT_87,75% Instante_13_CT_89,72% Instante_14_CT_91,37% Instante_15_CT_92,75% Instante_16_CT_93,92% Instante_17_CT_94,89% Instante_18_CT_95,71% Instante_19_CT_96,03% Instante_20_CT_96,03% -100 0,02 0 -2,5 -1,5 -0,5 0,5 1,5 U3(m m ) 2,5 -200 -0,02 -0,04 -300 -0,06 -0,08 PathY_Perfilom etría PathY_Sim ulacion -0,1 -400 -0,12 Y(m m ) -500 0 Pág. 13 1 2 3 4 Espesor (mm) 5 6 7 8 Validación Perfiles Esfuerzos Residuales
  14. 14. OPTIMIZACIÓN DE PROCESO DE PEEN- FORMING (II) 3.- Peen-forming en placas Modelo de Simulación Placas Sencillas Pág. 14 Segundo Modelo Recuperación Elástica 4.- Peen-forming en paneles rigidizados Validación Modelo Placas Modelo de Simulación Paneles Rigidizados Tercer Modelo Recuperación Elástica Validación y Verificación
  15. 15. • Visión General de Aernnova • Estrategia Tecnológica de Aernnova • Dos Ejemplos de Desarrollo Tecnológico en Aernnova y Fabricación de Alto Valor Añadido o o • Pág. 15 Montaje de estructuras con Tolerancias Estrechas Proceso de Conformado por Peen Forming Resumen
  16. 16. Aeronautics R&D mainly linked to the participation of big programs that require: • Financial Muscle with Institutional Aid and support • Technology Readiness to bid and win Offers: 5 Cs • Capacity, • Capability, • Credibility, • Confidence, • Competitiveness No matter if the Technology Development Projects are immersed in big commercial developments or stand alone: THERE MUST BE A ROI Aernnova is currently recognized by our customers as a 5Cs Tier 1 in airframe structures, with a Technology Plan 2012-2016 and a successful track record of ROI Pág. 16

×