KanBIM PT: SinergiasBIM-Lean em movimento       Nuno Cachadinha          FCT-UNL                         FCT, 16FEV2011
MotivaçãoConceitos importantesO KanBIM PTComo podemos fazer isto acontecer?
“What´s measured, improves”   Peter Drucker   Porquê sinergias?   Porquê Lean?   Porquê BIM?
Alguns conceitos importantes: Prioridade Índice de maturidade Análise de colisões Last Planner System
KanBIM – Production Control          Start            9          Master Plan                                              ...
Lintels and ring             beams Basement 1                                            Framing for false                ...
Electrical connection                                                                HVAC end unit zone 1                 ...
Erect columns                                                                                                             ...
John SmithDrywalls Team  Task List Floor Plan                                                Side B-                      ...
John SmithDrywalls Team  Task List     Status Type                   Task                                  Location Floor ...
John SmithDrywalls Team  Task List Floor Plan                                                Side B-                      ...
John SmithDrywalls Team                                                                                   Side B-         ...
John SmithDrywalls Team  Task List                Task                              Location                            Pl...
You chose to stop task:                      Framing – Internal 4” partition at apartment 16-17                      Pleas...
John SmithDrywalls Team  Task List                Task                               Location                             ...
John SmithDrywalls Team  Task List                Task                             Location                           Plan...
Project Server                                               Planner   Smart Board                                        ...
Como podemos fazer istoacontecer? Boa tecnologia Parceiros certos “Fazer-se ao mar”
A melhor forma de termos ofuturo que queremos é criá-lo                       Obrigado
Acção: Construção 2011 - Apresentação 05 - KANBIM PT: Sinergias BIM - Lean em Movimento, Prof. Nuno Cachadinha /FCT-UNL
Upcoming SlideShare
Loading in …5
×

Acção: Construção 2011 - Apresentação 05 - KANBIM PT: Sinergias BIM - Lean em Movimento, Prof. Nuno Cachadinha /FCT-UNL

799 views
708 views

Published on

Published in: Education, Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
799
On SlideShare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
22
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Acção: Construção 2011 - Apresentação 05 - KANBIM PT: Sinergias BIM - Lean em Movimento, Prof. Nuno Cachadinha /FCT-UNL

  1. 1. ACÇÃO: CONSTRUÇÃO 2011UM DIA DE VISÃO, PARCERIAS, PROJECTOS, NEGÓCIOS E NETWORKING 16 Fevereiro 2011 FCT/UNL MONTE DA CAPARICA KANBIM PT: SINERGIAS BIM - LEAN EM MOVIMENTO Prof. Nuno Cachadinha /FCT-UNL Organização
  2. 2. 08h30 - Recepção e entrega de documentação 09h00 - Sessão de Abertura Director da FCT Universidade NovaPrograma 09h30 - PAINEL OPORTUNIDADES EMERGENTES CONSTRUÇÃO 2011 - NOVAS OPORTUNIDADES E INOVAÇÃO Prof. Valadares Tavares PLANIT VALLEY (PAREDES) SMART & CONNECTED COMMUNITIES Living PlanIT INTERNACIONALIZAÇÃO DAS EMPRESAS DE CONSTRUÇÃO PORTUGUESAS ESTRATÉGIAS E DESAFIOS Eng. Tiago Martins e Miguel Labrincha / FCT-UNL INOVAÇÃO NA CONSTRUÇÃO Eng. Ricardo Carvalho / DST Debate Painel 11h00 - NETWORKING / INTERVALO PARA CAFÉ 11H30 - PAINEL LEAN CONSTRUCTION KANBIM PT: SINERGIAS BIM - LEAN EM MOVIMENTO Prof. Nuno Cachadinha /FCT-UNL LEAN JUSTICE - CONSTRUCTION MEDIATION Dra. Maria da Conceição Oliveira OPORTUNIDADES E DESAFIOS PARA A LEAN CONSTRUCTION EM PORTUGAL Eng. João Matias e João Martins / FCT-UNL CLIP, LAST PLANNFlor ER, KPI Doutor António / Rumo ao Objectivo Debate Painel 13h00 - NETWORKING / INTERVALO PARA ALMOÇO (LIVRE) 15h00 - PAINEL BIM BUILDING INFORMATION MODELING VALOR BIM EM PROJECTO, CONSTRUÇÃO E EXPLORAÇÃO Eng. Alvaro Sardinha / TECAD “ARCHITECTUREOR REVOLUTION” Arq. Levi Dacosta, Arq. Bernardo Vaz Pinto / Lisbon Design Studio BIM EM AQUECIMENTO, VENTILAÇÃO E AR CONDICIONADO Eng. Miguel Ferreira / CERTITERM IMPLEMENTAÇÃO DE BIM NA REALIDADE DA CONSTRUÇÃO NACIONAL Eng. Tiago Vasconcelos e Pedro Madeira / FCT-UNL Debate Painel 16h30 - NETWORKING / INTERVALO PARA CAFÉ 17h00 - PAINEL REABILITAÇÃO REABILITAÇÃO: O FUTURO Eng. Vitor Cóias / GeCORPA REABILITAÇÃO E SUSTENTABILIDADE - NOVAS ABORDAGENS Diogo Pereira e Alexandra Rueff / FCT-UNL REABILITAÇÃO DE CENTROS HISTÓRICOS Eng. Catarina Lopes / Eastbanc RECENTES OBRAS EMBLEMÁTICAS DE REABILITAÇÃO EM PATRIMÓNIO PROTEGIDO Eng. Ana Melo / Soares da Costa Debate Painel 18h30 - Encerramento Subdirectora para a Inovação e Empreendedorismo da UNL FCT
  3. 3. KanBIM PT: SinergiasBIM-Lean em movimento Nuno Cachadinha FCT-UNL FCT, 16FEV2011
  4. 4. MotivaçãoConceitos importantesO KanBIM PTComo podemos fazer isto acontecer?
  5. 5. “What´s measured, improves” Peter Drucker Porquê sinergias? Porquê Lean? Porquê BIM?
  6. 6. Alguns conceitos importantes: Prioridade Índice de maturidade Análise de colisões Last Planner System
  7. 7. KanBIM – Production Control Start 9 Master Plan End Construction Planner Site 10 Look ahead Construction 8 Engineers Section / plan zone Construction 4 Planner Health & Planner Safety Inspector managers Section / Section / Client Section / Detailed zone zone zone 3 Detailed Candidate Work managers manager User Trade Tasks Work managers Packages User manager Complete ? Trade Trade team managers leader 7 2 Weekly Plan Trade team User (Control Cards) leader Construction Planner Trade managers Section / zone Trade team managers leaders 1 Work in Trade team Process Health & leader Safety Material/ Task Equipment Work packages Kanbans s Tas Exit ks 5 Tas Logistics Manager ks
  8. 8. Lintels and ring beams Basement 1 Framing for false ceiling Entrance floor Framing West side Lobby Basement 1 Complete to ceiling Basement 1PartitionsBasement 2
  9. 9. Electrical connection HVAC end unit zone 1 Testing HVAC - Zone 1 Main ducts – Ducts 20-31 Secondary ducts – Ducts 10a-20a Main ducts – Ducts 33-42End Units –Zone 1
  10. 10. Erect columns Floor 6 Grids E1 to H4 Erect columns Floor 6 Grids E5 to H8 Erect Hollowcore Floor 5 Grids A5 to D8 Strip and clean Floor Prepare and pour topping 5 Grids A1 to D8 Floor 5 Grids A1 to D8 Support installation of hoist South side Sprinkler pipes facade Erect Hollowcore Floor 5 Grids A1 to D4 Floor 4 Main ducts – Ducts 53-63 Cut HVAC access End Units – holes Floor 4 Grid B3- Sprinkler pipes Zone 1 Main distribution board – C4 Floor 3 Wiring Entrance floor Lintels and ring Main ducts – Lobby beams Basement 1 Ducts 20-31 Testing HVAC - Zone 1 Framing for false Side A West side Secondary ducts – ceiling Entrance floor Framing West side Basement 1 Main ducts – Ducts 10a-20a Electrical connection Lobby Basement 1 Ducts 33-42 HVAC end unit zone 1 Partitions Complete to Basement 1 Side A East side ceiling Basement 1 Framing East side Basement 1 Close openings above Basement 1 HVAC Stairwell 2 Pipe installation in drywalls Duct installation in drywalls Basement 1 West side basement 1 West side Basement 1 Complete to ceiling Basement 2 Partitions Lintels and ring Basement 2 beams Basement 2 Fix cracks West side basement 3 Install main lines W12 Basement 2 Fire fighting pump roomPartition wallsStorerooms Basement3 Install main lines Basement 3 Fire fighting pump room
  11. 11. John SmithDrywalls Team Task List Floor Plan Side B- internal Section 4” partition Side A- internal 1 4” Framing- partition d internal 4” partition GO Framing- 0 Filters Framing- internal 4” internal 4” partition d Side B- internal partition 4” partition C 85 % Side A- internal 50 4” % partition 10 Side A- STOP % internal Start 85 % 4” partition 100 % 1 Complete 70 % Framing- d internal 4” 10 partition % Stop Control 2d Card Control Card Exit
  12. 12. John SmithDrywalls Team Task List Status Type Task Location Floor Plan Framing Internal 4” partition Apartments 24-26 Side B- GO Side A Internal 4” partition internal Apartments 22-23 Section 4” partition Framing Side A- 1 Internal 4” partition internal Apartments 20-21 4” Framing- partition d internal 4” partition GO 1 Side B Internal 4” partition Framing- 0 Apartments 18-19 Filters d Framing- internal 4” internal 4” partition d internal Side B- 0 Framing partition Internal 4” partition Apartments 16-17 4” partition d C C Side B 85 Internal 4” partition Apartments 14-15 Side A- % internal 50 4” % STOP Side A 10 Internal 4” partition Apartments 12-13 Side A- partition STOP % internal Start 85 4” 1 Side A % 100 Internal 4” partition Apartments 10-11 partition 1 Complete d % 70 d 2d Framing % Internal 4” partition Framing- Apartments 08-09 internal 4” 10 partition % Stop Control 2d Card Control Card Exit
  13. 13. John SmithDrywalls Team Task List Floor Plan Side B- internal Section 4” partition Side A- internal 1 4” Framing- partition d internal 4” partition GO Framing- 0 Filters Framing- internal 4” internal 4” partition d Side B- internal partition 4” partition C 85 % Side A- internal 50 4” % partition 10 Side A- STOP % internal Start 85 % 4” partition 100 % 1 Complete 70 % Framing- d internal 4” 10 partition % Stop Control 2d Card Control Card Exit
  14. 14. John SmithDrywalls Team Side B- internal Task List 4” partition 1 Floor Plan d You chose to report task: Framing- Side B – Internal 4” partition at apartment 18-19 internal 4” Section as complete. partition Planned duration: 2 days; Actual duration: 1 day 0 Please report any problems you encountered during execution: Side A- internal d 4” partition Filters 1 Preceding activities not finished Lack of materials d Workspace was not ready Equipment was not available Lack of information Framing- Team issues Framing- internal 4” internal 4” partition partition Start Safety issues Management Instruction Complete Weather No problems Stop Control Complete Cancel Card Exit
  15. 15. John SmithDrywalls Team Task List Task Location Planned Duration Task Maturity Priority Floor Plan Framing internal 4” partition Level 1 Apartment 24-26 1 day 30% Task name Section Preceding Last Events activities Task name + Preceding Activities Task name Workspac GO e • Flooring Apartment 25 was stopped GO + Workspace Filters Informatio n Framing • Apartment 25 is clear + Information Apartment 24-26 Task name Safety • Changes plan was approved + Safety Materials • Nothing to report Task name + Materials STOP Equipmen Start t • Rails delivered • Studs – 30 meters missing Team + Equipment Complete Task name • Nothing to report + Team Stop Close • Nothing to report Control Card Exit
  16. 16. You chose to stop task: Framing – Internal 4” partition at apartment 16-17 Please provide the reason for stopping this task Unavailable Previous work Missing materials Equipment Workspace Faulty materials Equipment Fault Framing- internal 4” Missing information Safety issues partition Wrong Equipment A-L-43-R5 Design Errors Team Weather ID-L-73-1-R2 Management Instruction DW-D-6-R1 Select E-W-23 Stop objects Cancel completedExit
  17. 17. John SmithDrywalls Team Task List Task Location Planned Duration Task Maturity Priority Floor Plan Framing internal 4” partition Level 1 Apartment 24-26 1 day 30% Task name Section Preceding Information Show Details activities Task name Interior design sheet #6 name Dry GO detail layout Status wall Description Expecte Reliabili Name Task Source Workspac d ty e GO Architectural Approve A-L-43-R5 HOK Filters Informatio layout d n Framing ID-L-73-1-R2 Interior design Under Barak & Apartment 24-26 Task name Thursday 80% Safety layout revision Partners DW-D-6- Dry wall detail Available Arup Materials R1 sheet #6 Task name Electrical wiring Waiting Tomorro E-W-23 90% Mace STOP Start Equipmen diagram approval w t Team Complete Task name Stop Close A-L-43-R5 ID-L-73-1-R2 DW-D-6-R1 E-W-23 Control Card Exit
  18. 18. John SmithDrywalls Team Task List Task Location Planned Duration Task Maturity Priority Floor Plan Framing internal 4” partition Level 1 Apartment 24-26 1 day 30% Task name Section Preceding Safety activities Task name Reliabili Responsibl Safety Preconditions Status nameExpected Workspac GO Task ty e e Safety instruction given GO Eduard Confirmed to crew Wise Filters Informatio n Framing Eduard Crew qualified Apartment 24-26 Confirmed Task nameWise Safety Personal safety Eduard Available equipment available Wise Materials Work zone cleared of Eduard Confirmed Task name hazards Wise STOP Equipmen Eduard Start t Fall protection in place Confirmed Wise Team Complete Task name Stop Close Control Card Exit
  19. 19. Project Server Planner Smart Board Data View Trade 4 Trade 3 Trade 2 Smart Board Model View Trade 1Exit
  20. 20. Como podemos fazer istoacontecer? Boa tecnologia Parceiros certos “Fazer-se ao mar”
  21. 21. A melhor forma de termos ofuturo que queremos é criá-lo Obrigado

×