Your SlideShare is downloading. ×
0
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
4 Ok802  Bok Center  Terry B
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

4 Ok802 Bok Center Terry B

281

Published on

Telecommunication wiring infrastructure at the BOK Center, Tulsa OK

Telecommunication wiring infrastructure at the BOK Center, Tulsa OK

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
281
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide
  • Trans-Tel Central – the winning bidder to install the cable infrastructure for the new arena. Vision 2025 is the City of Tulsa’s plan of growth for the future
  • Transcript

    • 1. Vision 2025 at work Tulsa Event Center
    • 2.  
    • 3.  
    • 4.  
    • 5. View from the west side of the arena
    • 6.  
    • 7. East side view
    • 8.  
    • 9.  
    • 10.  
    • 11.  
    • 12.  
    • 13. Installation of the hockey rink
    • 14.  
    • 15. Main Level – Concession
    • 16. Premium Level
    • 17. Typical rough-in of CAT6 and CATV cables
    • 18. Overhead cable tray – installed by general contractor
    • 19. Sub Contractor Crew Chief – directs cable installation
    • 20. Technician installing vertical cable tray in one of 19 telecom closets
    • 21. Custom fitting to allow tray to form to the conduits provided by general contractor
    • 22. Custom fitting of the vertical cable tray
    • 23.  
    • 24. Technician operates a scissor lift installing CAT6 cable
    • 25. Technician operates boom lift to be in position to install outside camera’s.
    • 26. Camera’s were installed on the west eyebrow RG6 cables were extended down both sides of the arena
    • 27.  
    • 28. View from the West Eyebrow
    • 29.  
    • 30.  
    • 31.  
    • 32. Technician labeling cables before installing on the east eyebrow
    • 33. Security Office Cabinets Front View Rear View
    • 34.  
    • 35.  
    • 36. Front view of equipment rack in the Security Office
    • 37. Initial preparation of CATV distribution Fiber patch panel Room 1B31.04
    • 38. Premium Level A Quadrant Distribution of the Cable TV System
    • 39. View from the Upper Level Concourse
    • 40. Typical Equipment Cabinet - being prepped to terminate Belden Fiber Optic cable and Belden CAT 6 Media Twist cable
    • 41. Trans – Tel Central Inc: Bryan Shank – Director of Engineering Bill Wright – Account Executive Carol Harper – Director of Administration David Uhles – Project Support Manager Terry Bowler – Project Manager Belden Inc Technical & Product Support Sandy Stines - Sales Representative
    • 42. Subcontractor Support DCI Communications Mike Weaver – Project Manager Fred Anderson – Crew Chief Santos Yvanez – Crew Chief Material & Product Support Graybar Inc John Smith – Area Manager Elizabeth Smith – Customer Service Representative Les Brown – Customer Service Representative
    • 43. Opening the BOK Center on 9/6/08 The Eagles

    ×