Ten + Considerations When Building a New Data CenterRandy OrtizVP, Data Center Design & Engineering
Analysis is not paralysis when building a new data center2
Ten+ Considerations When Building a New Data Center    1.   Availability required or commonly known as the Uptime         ...
Ten+ Considerations When Building a New Data Center     3.   Location impacts            Close to headquarters            ...
Ten+ Considerations When Building a New Data Center    5.       Life cycle cost modeling                         •        ...
Ten+ Considerations When Building a New Data Center    8.    Staffing Capabilities          (Facilities)                  ...
Our Approach     •   Internap’s process of evaluating cost & energy benefits for new data         centers includes all of ...
Our intelligent IT          Infrastructure solutions          can take your business          to a higher level.3,700+ Ent...
Upcoming SlideShare
Loading in...5
×

Ortiz internap

638

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
638
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Ortiz internap"

  1. 1. Ten + Considerations When Building a New Data CenterRandy OrtizVP, Data Center Design & Engineering
  2. 2. Analysis is not paralysis when building a new data center2
  3. 3. Ten+ Considerations When Building a New Data Center 1. Availability required or commonly known as the Uptime Institute’s Tier level. • Typically the more available your site is the larger the expense expense. • Carefully evaluate availability needs to avoid over sizing and over designing your data center. 2 2. Anticipated day one loads and incremental growth • Power profile of existing equipment • Track IT equipment patterns3
  4. 4. Ten+ Considerations When Building a New Data Center 3. Location impacts Close to headquarters DR site? Energy rates Hardness of location (environmental & physical) Free cooling opportunities Availability and reliability of power Availability and reliability of network carriers 4. Design & construction consulting and vendor selection lti d d l ti Selecting the correct team can make or break your project!4
  5. 5. Ten+ Considerations When Building a New Data Center 5. Life cycle cost modeling • p g Computing needs • Facility needs • Financial impacts 6 6. Green evaluation to PUE • There is a cost to being green 7. Modular approach (MEP) • Sizing for what you need and easy transition 3.50 3.00 2.50 2.00 1.50 1.00 0.50 0.00 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 255 Figure 4 - Data Center Power Utilization Effectiveness (PUE)
  6. 6. Ten+ Considerations When Building a New Data Center 8. Staffing Capabilities (Facilities) Do you have access to the correct personnel to operate you ac ty your facility? 8. Budget Analysis Alignment with corporate expectations and goals p g 10. Regulatory or outside influences Be sure to consider impact to cost in becoming HIPAA, SOC or other compliance certifications6 CONFIDENTIAL
  7. 7. Our Approach • Internap’s process of evaluating cost & energy benefits for new data centers includes all of the above and some not listed. • Internap utilizes an Internap audit tool that generates a report comparing the ROI of the overall cost against several factors including the cost to being energy efficient.7
  8. 8. Our intelligent IT Infrastructure solutions can take your business to a higher level.3,700+ Enterprise Customers 500 Employees 2010 Revenue: $244M NASDAQ: INAP8
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×