1.81 million (2001 census)
Growth Rate: 1.4% Per annum
Energy
Introduction
Reliable
Comfortable
Safer
{
{
Vision
Our vision is to be a world-class metro rail
system that enhances the quality of life for
the citizens of Kochi
M...
Project Profile
Route Length (between dead ends) 25.612 Km
Number of Stations 23
Total estimated cost (without taxes)- Rs ...
{ 5,181.79 crore (US$943.09 million)
Project Time & Cost
Total cost
The Central Government: contribution of 1,002.23 crore...
Project plan
Construction
Station Locations
Coach design and basic parameters
Selection of Technology
Passenger Safety Fea...
Tickets are expected to be priced between 10 and 30
Operation Philosophy
Make the MRT System more attractive and economica...
Kochi metrorail project
Kochi metrorail project
Upcoming SlideShare
Loading in...5
×

Kochi metrorail project

127

Published on

Kochi metrorail project

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
127
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Kochi metrorail project"

  1. 1. { Kochi Metro Rail } Group Members: Aiman Deepti Gajalakshmi Imran Raghuraman Suryadev Maity
  2. 2. Introduction
  3. 3. Introduction 1.81 million (2001 census) Growth Rate: 1.4% Per annum
  4. 4. Energy Introduction Reliable Comfortable Safer
  5. 5. {
  6. 6. { Vision Our vision is to be a world-class metro rail system that enhances the quality of life for the citizens of Kochi Mission To provide a reliable, safe, efficient, viable and customer friendly rapid transit system for the greater Kochi area that is environmentally sustainable Strategic Goals Operational Goals
  7. 7. Project Profile Route Length (between dead ends) 25.612 Km Number of Stations 23 Total estimated cost (without taxes)- Rs 3733 crores Completion cost (by Year 2016) (i) including escalation and Central taxes only Rs. 4910 Crores (ii) including escalation, Central and State taxes Rs. 5146 Crores Capacity/train : 600 passengers (initial) Financial Indices a) FIRR 3.04% b) EIRR 14.2% Fare : Rs 12/- to Rs 30/
  8. 8. { 5,181.79 crore (US$943.09 million) Project Time & Cost Total cost The Central Government: contribution of 1,002.23 crore (US$182.41 million).The Kerala Government: contribution of 1,772.23 crore (US$322.55 million) & 2,174 crore (US$395.67 million) will be raised as loan from Japan International Cooperation Agency (JICA) Surcharge : 250 Crore annually Taxes and duties: 616 crores
  9. 9. Project plan Construction Station Locations Coach design and basic parameters Selection of Technology Passenger Safety Features Planning and Design Criteria for Stations
  10. 10. Tickets are expected to be priced between 10 and 30 Operation Philosophy Make the MRT System more attractive and economical Train Operation Plan Traffic Demand
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×