DELPHIX Soluzione di virtualizzazione DB Oracle e SQL. Npo Sistemi è il primo partner in Italia per le soluzioni di virtualizzazione dei DB Oracle e SQL. Risparmio di spazio storage e flessibilità ai …

DELPHIX Soluzione di virtualizzazione DB Oracle e SQL. Npo Sistemi è il primo partner in Italia per le soluzioni di virtualizzazione dei DB Oracle e SQL. Risparmio di spazio storage e flessibilità ai massimi livelli con il self-provisioning delle aree virtuali di test, sviluppo e QA dei DB.

More in: Technology
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
No Downloads

Views

Total Views
206
On Slideshare
0
From Embeds
0
Number of Embeds
1

Actions

Shares
Downloads
7
Comments
0
Likes
1

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide
  • So far we have talked about the weight of infrastructure on app delivery. Of course, to control and manage that infrastructure, firms layer on a large set of bureaucratic processes, change control, approvals, procurement, governance, etc etc. So the operational and organizational hurdles then create an even bigger drag on IT and app development.Here’s an example from one banking customer.Once the app developer puts in a request for a new development environment, there’s at least a week long wait for management approvals. Then project DBA work with the sysadmin and storage groups for capacity. If more capacity needs to be allocated, it’s 3 more days. If more needs to be purchased, weeks or months. If a copy of production data is needed, the process needs to wait on a production DBA, who might be busy with production issues. Recovering the database to a specific point in time and configuration can also take days.It is very common for two weeks to pass between a developer request and a ready environment. The process can be repeated for multiple environments, for data refreshes, and for integration across multiple systems.With Delphix, turns stop signs into green lights. Provisioning, refresh, rollback, and data integration happen nearly instantly and do not trigger approvals from production systems or require additional storage. That is why KLA is able to deliver 5 times the output from its SAP teams…Without Delphix, it’s impossible for organizations to implement the level of agile processes they desire. The management of data, and the bureaucracy of data management, slows things down too much.
  • Lo sviluppo Agile è caratterizzato da ciclipiùcorti; piùprogettiparalleli; frequenteiterazione; test continui; e piccoli team integrati. In pratica, questo è difficile da raggiungere a causa di chiariproblemilegatialleinfrastrutture.Spese di Configurazione e Smontaggio:Ogniprogettopuòrichiederedozzine di copiedei database, ciascuna per squadra o, in alcunicasi, per sviluppatore. Senzadubbio – ci possonovoleregiorni o settimanesemlicemente per installare, caricare e configurare le copie.Similmente, decommissionare I database alla fine di ogniciclo o assicurareche I dati del clientesianoprotettipuòrichiederegiorni.La questione è chequando I tuoicicli di svilupposonolegati al tempo e sonoprevisti per durare solo qualchesettimana, perdereunabellafetta di tempo solo per installare e smontareogniciclomettemoltapressionesisviluppatori e tester.Costi:Traditional approaches might have dozens of programmers sharing a development system over several months. In contrast, with agile – we’re talking about cycles that only last a few weeks and greater parallelization. To minimize risk, it is common for companies to make full production copies for each project in a cycle.10 to 20 parallel feature projects implies 10 to 20x infrastructure costs.The resulting costs whether its for DB licenses, storage, or servers – can create a huge a capital cost barrier to agile development adoption – or conversely can erode its benefits.Ripristino:At some point in any agile development cycle, the code and data from multiple parallel projects has to be integrated for system testing – in other words to make sure the output from the sub-projectsalso works when combined. Ensuring that the integrated QA test environment properly represents the production environment is in itself a major challenge. For example if the data and schemas from project databases are not sync’d correctly, bugs may not surface until in production, resulting in actualoutages that can be very expensive. If that happens then the application has to return to QA for investigation and repair but the original test environment may already be torn down. And so now you have to reproduce or rollback to the original test conditions and that is generally just as challenging as recreating the test databases from production.Key QuestionsHow long are your development cycles and what % of each cycle is used for setup and teardown?Do agile development teams lose time waiting for shared development environments to become available?What is the latent elasticity demand? i.e. # of current copies vs. total project teams and vs. total developers?
  • Nelcontestodellosviluppo agile,Delphixtipermette di:Semplicareconfiguarazione e smontaggio – ottimizzarel’attuale tempo di testingFunzionalitàcompleta del database virtuale in pochi secondi e autonomamenteRiduzione del tempo di Configurazione in pochiminutiRiduzione del 95% nel tempo finale di cnfigurazione e smontaggioTagliodeicosti – eliminarepiù del 90%deicostiEliminatoil 90%dello storage di copie e backupfor copies and backups $MM level benefit for most organizations relative to full physical copiesRipristinoRapido – migliora la qualitàdelleapplicazioniRitorno a quasiasipuntonel tempo in pochiminuti (o SCN)Sincronizzareilripristinoattraversocopie per test integratiEvitarediscordanzedeidati o deglischemi – prevenzionedeiproblemiPrincipalicaratteristicheIllimitatecopie complete a supportare lo sviluppatore o i team necessarie con lo sviluppo agileFornitura e aggiornamento autonomi in pochiminuti per ottimizzarel’attuale tempo di testing per ilciclo agileIntegrataspedizione e archiviazionedei log per rapidoripristinocritico per cicliagilicortidopoiqualil’ambientevienesmantellatoCasoStubHubLo scopo di StubHub’s di fornireunacopia del database persviluppatore è statobloccatodaicosti di storage e processi di configuarazione e smontaggiochelimitavanogliattuali test dei tempi per I testideicicliagili. Lo sforzofucompensato da requisitiregolatorichenecessitavano la coperturadeidatisensibilinellecopiedei test di database.Con Delphix, StubHuborastamirandoalle 100 copievirtualinascostedeisuoi 4TB di produzioneeliminando (per 3 anni) 2.4M$ in costi di storage e 1.9M$ richiesti per configurare e smontaregliambienti per ogninuovociclo agile.L’abbassamentodeicostidellosviluppo agile e la fornitura di piu test per icicli ha avuto un chiaroimpattonellaqualitàdelleapplicazioni. Per esempio, StubHubrecentemente ha recentemente impedito una interruzione della produzione a causa della tabella del codice di scansione catturandolonellafase di sviluppo con Delphix.
  • Bene, diamounosguardo ad alcuniclienti e osserviamo come usanoDelphix.KLA Tencor is a Fortune 1000 semiconductor manufacturer.Theirbusiness is highly cyclicaland revenues fluctuate significantly with global demand and other factors. So a key imperative for the company is agility and variability to ensure that they can scale up and down easily with existing resources. Along the same lines, avoiding capital costs is huge because these costs hit the books as a depreciating item and can eat into margins at a time when revenues may be on a down swing. These objectives were a challenge for KLA because its business relies heavily on itsSAP landscape of 7 key applications backed by 10 production databases with 8 copies each, adding up to 40 TB of storage. With iPhones and iPads driving incredible growth, frequent changes to the SAP environment are required. At the backend this translates into constant demand for non-production database provisions and refreshes that were taking four to five administrators from different teams an average of two weeks just to refresh one database. As a result, IT could only deliver monthly or bi-monthly refreshes. The stale data in turn increased the risk of production failures, which could be very expensive for the business. The need to synchronize these tasks for consistency across SAP applications only compounded the problem. Most importantly, this operational inefficiency was delaying the backlog of other key IT projects.  With the deployment of Delphix, KLA Tencor has dramatically improved IT agility and operational efficiency. Databaseprovisioning and refresh tasksthat were taking 5 people 2 weeks is now self serviced in 20 minutes by the requesting user. This has eliminated the organizational dependencies as well. They are also able to easily synchronize provisioned copes across SAP applications down to the second – this is a unique Delphix capability that is a huge benefit for master data management type projects. The reduced effort for these tasks allowed KLA to go from 6 - 12 refreshes a year to over 120 refreshes per year per database. And KLA estimates that this also yields in a 10 – 20x reduction in the risk of production failures from stale data.But the single biggest agility benefit was that they are now able to complete application projects 5 times as fast as before. And that’s huge for a cyclical business like KLA. Beyond the agility benefits there were also hard cost savings. By consolidating 45 virtual DBs on 2 Delphix servers, roughly a ratio of 20:1, KLA eliminated over 400 thousand $ of Tier-1 SAN infrastructure costs.
  • Procter and Gamble è un altrocliente, a Fortune 50 manufacturer and a huge SAP customer. Because P&G has outsourced its SAP operations to a third party, it had limited ability to refresh the development, test, and cutover database copies for each of its many SAP landscapes. The outsourcer only refreshes once per month, so development processes and reporting processes take a long time. In addition, the ongoing monthly storage costs for these many large databases runs into the tens of millions of dollars.With Delphix, P&G is able to refresh databases on demand (ie in minutes instead of once per month), so it’s SAP development is turbocharged.It is also able to reduce database storage requirements by over 90%, eliminating over ten million dollars in the first three years.Finally, using Delphix’s rollback and auto-provisioning capabilities, P&G can instantly recover from SAP outages due to database transaction failures or corruption. As a result, it’s global distribution and supply chain operations are protected. Industry estimates are that an ERP outage costs $14,000 per minute, over $20 million per day. Protecting against SAP downtime pays for Delphix many times over.
  • Informatica hausatoDelphix per dimezzareil tempo di progettazione per ilprogettoMaster Data ManagementThis internal deployment had a 12 month schedule, significantly driven by the need to synchronize data from 6 different production systems. Getting access to these systems in a timely manner in order to get fresh data was difficult, and there were certain windows when the data was available.With Delphix, the project was delivered in 6 months instead of 12, resulting in $16 million in additional revenue during those extra six months. At the same time, error rates dropped from 25% to 5%. Informatica is able to covert customers from marketing to sales faster and better.By cutting both opex and capex in this project, the customer was able to free up dollars that normally are allocated to “keeping the lights on” and reallocate them to funding innovation – i.e. generating more business.

Transcript

  • 1. www.nposistemi.it Idee, Tecnologie e Competenze al Servizio delle Imprese DELPHIX e la virtualizzazione dei database
  • 2. Chi è Delphix • Azienda americana creata nel 2011 dal Padre di Avamar - Jedidiah Yueh President and CEO di Delphix . (Avamar = software per la deduplica) • Delphix permette la creazione di database virtuali • Database ad oggi supportati: Oracle e Microsoft SQL
  • 3. Chi è Delphix • Delphix introduce il concetto di FLESSIBILITA’ nella gestione dei dati relativi a copie di database della produzione attraverso un software intelligente che elimina le infrastrutture ridondanti e la lentezza dei processi. • i Clienti Delphix possono fornire applicazioni business migliori, più velocemente e ad un costo nettamente inferiore
  • 4. La Virtualizzazione ha trasformato l’Informatica Applicazione Applicazione Applicazione Sistema Operativo Sistema Operativo Sistema Operativo Livello di virtualizzazione • • • • Taglio dei Costi Incremento della Produttività Predisposizione per il Cloud Migliori tempi di ripristino Hardware condiviso Desktop: Server: Database:
  • 5. Senza Delphix - Infrastruttura standard degli ambienti di test e sviluppo Il processo di test e sviluppo crea in genere grossi ritardi nella delivery di applicazioni Enterprise Production Development Unit Test QA Integration Reporting
  • 6. Con Delphix - meno storage e aumento delle prestazioni e controllo Delphix sostituisce la complessità dell’HW con un SW intelligente che permette di virtualizzare database enterprise Production Development Unit Test QA Cutover Test Reporting 10:1 Consolida 10+ nello spazio di 1 VDB I DBs performno e funzionano come quelli fisic Self-Service Database Provisioning, Integration, Refresh e Rollback
  • 7. Perché Delphix • Trasforma i modi e i tempi della delivery in produzione delle applicazioni di tipo Enterprise • Le aziende Enterprise investono ingenti somme di denaro e di tempo per costruire e supportare le applicazioni business che girano sui database di produzione.
  • 8. Perché Delphix • Approvare, creare e aggiornare le copie di database per lo sviluppo di quelle applicazioni - per il troubleshooting e l'analisi – può richiedere settimane di tempo e milioni di euro sia in termini di capitale che di spese operative. • l'IT non riesce a stare dietro alle richieste provenienti dal business per gli ulteriori sviluppi applicativi e per ottenere dati sempre più aggiornati
  • 9. Impatto su Infrastrutture e Risorse condivise l’autonomia elimina i colli di bottiglia e permette un time -to-market più veloce SENZA DELPHIX: settimane perse per l’approvazione e ritardi nella fornitura Developers Management DBA System Admin Storage Admin Submit Request Approve Request $$ (2 Weeks) Approve Request $$ (2 Weeks) Approve Request $$ (1 Week) (2 Days) (3 Days) (3 Days) Disk Capacity? (3 Days) Request Additional Storage? Submit Request Begin Work 3 Clicks to Provision, Refresh File System Configured? Provision Capacity CON DELPHIX: Sviluppo rapido e autonomo Developers Begin Work …….5-10 Weeks of Approvals, Delays, and Provisioning…… (10 Minutes) Coordinate Replication w/ Infrastructure Configure LUNS & Build File System ReParameterize & Configure DB (3 Days) Mount Recovery DB to Specific PIT
  • 10. Senza Delphix sviluppo e test standard Subsetting, copia sviluppo condivisa #1 DB di Produzione Giorni o settimane per la configurazione Subsetting, copia sviluppo condivisa #2 Progetto Team A Progetto Team B Progetto Team C Configurazione e caricamento dei dati Test Progetto Team D • • • Tempo di esecuzione interrogazioni La lunghezza nei tempi di installazione, di caricamento dei dati e configuazione non permette di procedere con cici di sviluppo flessibili I costi altissimi rappresentano una barriera all’implementazione di ulteriori ambienti di sviluppo e test. L’alternativa è utilizzare copie condivise  ma aumenta il rischio di errori L’effort significativo necessario per l’ulteriore lentezza nei ripristini limita la creazione di copie 10 di sviluppo
  • 11. Con Delphix: sviluppo Flessibile grazie alla virtualizzazione dei dati Progetto team A Progetto team B Progetto team C Prod A Prod B Configurazione e caricamento dei dati Test Tempo di esecuzione interrogazioni • Massimizza I tempi di sviluppo: configurazione e caricamento dei dati in pochi minuti (riduzione del 95%) • Scalabilità senza aumentare i costi: disponibilità copie di DB per progetto o per sviluppatore (90% in meno dei costi connessi allo storage) • Semplifica i test di integrazione : crea, aggiorna e ripristina copie in un esatto momento nel tempo
  • 12. Quando Delphix Applicazioni di tipo Enterprise che si appoggiano su database Oracle o SQL ? Uno o più DB di Produzione critici per il business e una serie di copie fisiche di quel/quei DB della produzione come ambienti di sviluppo e test? Creazione di Database Virtuali su cui lavorare (fare modifiche, test ecc.)
  • 13. Vantaggi  80% del beneficio totale: Agility o Flessibilità Fai 5 volte di più Paghi 10 volte meno Dimezzi i rischi Implementazione flessibile e accelerazione nei tempi di sviluppo del progetto Diminuisce drasticamente i costi connessi agli applicativi e alle risorse per lo sviluppo e di test dei DB Diminuisce nettamente la dipendenza tra disponibilità del progetto e risorse condivise
  • 14. I Vantaggi  20% del beneficio totale: Risparmi consistenti nell'utilizzo di storage  creazione di copie di database riducendo l'utilizzo dello storage del 70-90%  Continuous Data Protection:  ripristino della situazione ad un preciso momento senza l'utilizzo dei tradizionali strumenti di backup e recovery  più velocemente (creando un database virtuale a quel preciso momento)  senza occupare lo spazio storage (on-line o off-line) tradizionalmente necessario per le copie di backup da ripristinare.
  • 15. «Macchina del Tempo» per Database Esempio: In qualunque punto nel tempo, l’aggiornamento dell’applicativo può introdurre errori nel DB di produzione New Patch Contains Faulty Tax Calculation Code… Inaccurate Quarterly Tax Payments Region 1: Region 2: Region 3: $235,685.03 $195,334.56 $984, 583.01 … Con Delphix e’ possibile fare troubleshooting partendo da un qualunque punto prima del verificarsi dell’errore
  • 16. Progetti consegnati più velocemente al mercato – in ogni vertical 700+ Apps on Oracle Accelerate Outsourced AppDev 40 TB Data Warehouse 21-->4 Day Acct Close Operational Reporting Master Data Management 500% SAP Output Gain Disaster Recovery Testing Agile Dev with Masked Data 16
  • 17. Referenza Obiettivi • Accelerare la consegna delle applicazioni • Drastico abbassamento dei costi connessi a infrastruttura e operation Risultati • Prima: I team SAP consegnavano 2 progetti in 6 mesi. • Dopo: I team SAP consegnano 11 progetti in 6 mesi • Prima: 80 ore per il provisioning e il refresh per ogni richiesta • Dopo: meno di 30 minuti per il provisioning e il refresh in autonomia 550% Più progetti nello stesso tempo “Abbiamo provato una nuova tecnologia ed è andata alla grande. Delphix ci fornisce la flessibilità necessaria per espandere la nostra infrastruttura di progetto quando ne abbiamo bisogno” Rajiv Gupta Senior IT Manager, Enterprise Services
  • 18. Referenza Obiettivi • Taglio dei costi mensili dello storage • Miglioramento della disponibilità delle applicazioni per i Clienti Risultati • Prima: Altissimi costi mensili connessi allo storage • Dopo: Oltre il 90%+ riduzione dei costi connessi allo storage • Prima : Progetti applicativi in ritardo a causa di refresh limitati a cadenza mensile • Dopo : Creazione in autonomia di copie di produzione per gli sviluppatori $12M Riduzione Storage 18
  • 19. Business Case Case Study: Obiettivi • Consegna del “Master Data Management” rispettando tempi e budget Risultati Prima : Piano di consegna in 12 mesi Dopo : MDM consegnati in 6 mesi  16.000.000$ di aumento nelle vendite in 3 mesi. Prima : Difficolta di accesso ai dati da 6 sistemi di produzione Dopo : Riduzione della complessità  minore dipendenza fra struttura condivisa e sviluppatore JAN FEB MAR APR MAY JUN JUL AUG Before OPEX Services (Time, Matls) Project Developers DBAs (Project, Production) Maint/ Depr (Storage, Backup) CA PEX New Storage SEP OCT NOV W/ Delphix $1,250,000 $160,000 $410,000 $350,000 $625,000 $80,000 $76,000 $35,000 $250,000 DEC MDM CONSEGNATI IN 6 MESI 50% di tempo in meno $16M di entrate aggiunte $0 Budget Freed to Fund Innovation: $1,604,000 “Il risparmio e la riduzione della complessità conquistati con Delphix non hanno precedenti” Tony Young, CIO, Informatica
  • 20. Gruppo Npo S.S. 11 Padana Superiore 28 20063 Cernusco s/Naviglio MI Tel. +39 02 925961 Fax +39 02 92590092 info@marketing@nposistemi.it www.nposistemi.it