  • 2008 Framework Plan approved by Council in December 2008; foundation for the next phase which is implementation. Not starting from scratch. These principles were ased on the overall vision of St Elizabeths East Campus becoming a new neighborhood that stimulates economic regeneration in Ward 8 and the surrounding communityCreated with input from a variety of stakeholders through the 2003 planning process and 2008 updateIntended to guide future planning and development activities on the campus
  • Master plan is about land use and transportation. Both are subcomponents of a master plan4 steps must be undertaken before development occurs on the site: Complete the master plan, identifying the first phase of developmentComplete the road network designZone the site Construct the infrastructure, roads, and vertical buildings
  • Based on the current realities and new information obtained sine the approval of the framework plan, a master plan is being createdSite lacks zoning and infrastructure, which presents a development risk This master planning process will zone the site and define the infrastructure needed for this redevelopmentMaster planning the site will define development phasing for the campusOnce complete, it (master plan) will be submitted to the Historic Preservation Review BoardPhasing
  • How will this master plan be used?
  • St. Elizabeths Presentation: Public Mtg #1

    1. 1. St Elizabeths East Public Meeting<br />May 12, 2011<br />
    2. 2. ST Elizabeths East<br />Development Principles<br />Capture the Unique Identity to Create a Sense of Place<br />Reinvigorate the Campus as an Important Neighborhood Center<br />Preserve and Celebrate Heritage Resources <br />Embody the District's Urban Design & Sustainability Goals <br />Improve Connectivity and Open Up the Campus<br />Enhance Multi-modal Transportation Networks <br />Create a Strong Public Realm <br />Support Wider Economic Development Initiatives <br />
    3. 3. St Elizabeths East Campus Master Plan<br />Implementation Process:<br />Identify the first phase of development within the master plan that identifies community preferences for uses and amenities<br />Define utility infrastructure needs <br />Define the system of roads that will support East Campus development<br /><ul><li>Connect to surrounding neighborhoods
    4. 4. Meet projected area growth in the next twenty years</li></ul>Zone the site and obtain Historic Preservation approval for infill development<br />Build the plan<br />
    5. 5. St Elizabeths East Campus Master Plan <br />Why? - A Master Plan is required in order to:<br /><ul><li>To define where development starts and identify communitypreferred uses in phase 1
    6. 6. Understand the re-use of historic buildings and potential impacts of new development to historic resources (buildings, views, landscapes)
    7. 7. Identify utility and infrastructure needs to support sustainable development
    8. 8. Create design guidelines</li></li></ul><li>Transportation Infrastructure<br />DDOT East Campus Transportation Environmental Assessment <br />
    9. 9. St Elizabeths East Campus Master Plan<br />Implementation Process:<br />Identify the first phase of development within the master plan that identifies community preferences for uses and amenities<br />Define utility infrastructure needs <br />Define the system of roads that will support East Campus development<br /><ul><li>Connect to surrounding neighborhoods
    10. 10. Meet projected area growth in the next twenty years</li></ul>Zone the site and obtain Historic Preservation approval for infill development<br />Build the plan<br />
    11. 11. Transportation Infrastructure<br />Context<br /><ul><li>St Elizabeths DHS Consolidation
    12. 12. South Capitol Street
    13. 13. Street Car
    14. 14. Far South East Livability Study
    15. 15. 11th Street Bridges</li></li></ul><li>Transportation Infrastructure EA<br />Project Area<br />
    16. 16. Transportation Infrastructure EA<br />East Campus Roads Environmental Assessment<br />Project Planning<br />Where we are<br />PE, Alternatives & Environmental Approvals<br />Final Design<br />Construction<br />
    17. 17. Transportation Infrastructure EA<br />Needs<br /><ul><li>Provide connections to the community
    18. 18. Make St Elizabeths East campus accessible and open to the community
    19. 19. Make the campus walkable
    20. 20. Remove the roadway deficiencies by reconstructing the roadways and connecting the network
    21. 21. Provide multi modal transportation options including transit, bikes, pedestrians</li></li></ul><li>Transportation Infrastructure EA<br />Environmental Assessment Process<br /><ul><li>National Environmental Policy Act (NEPA)
    22. 22. Section 106 of the National Historic Preservation Act
    23. 23. Alternatives Development
    24. 24. Traffic Analysis
    25. 25. Impact Assessment
    26. 26. Public Involvement / Agency Coordination</li></li></ul><li>St Elizabeths East<br />Schedule<br />Community Advisory Committee Meeting<br />Community Advisory Committee Meeting<br />Community Advisory Committee Meeting<br />Draft Environmental Assessment<br />Master Plan with Phase 1 Development Area<br />Historic Preservation Consultation<br />Historic Preservation Consultation<br />Historic Preservation Consultation<br />
    27. 27. St Elizabeths East Outcomes<br />Outcomes<br /><ul><li>Requirements and phasing of development defined
    28. 28. Impacts to historic resources identified and addressed
    29. 29. Site zoned and infill development sites approved
    30. 30. Transportation network that supports East Campus defined
    31. 31. Funding to support roads, utilities, community facilities and other needs identified
    32. 32. Process to select development partner initiated</li></li></ul><li>St Elizabeths East<br />Stay informed / engaged:<br />www.stelizabethseast.com<br />comments@stelizabethseast.com<br />

    ×