Your SlideShare is downloading. ×
Sporting Park Construction Update (2/23/11)
Sporting Park Construction Update (2/23/11)
Sporting Park Construction Update (2/23/11)
Sporting Park Construction Update (2/23/11)
Sporting Park Construction Update (2/23/11)
Sporting Park Construction Update (2/23/11)
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Sporting Park Construction Update (2/23/11)

1,382

Published on

Sporting Kansas City's state-of-the-art, $180 million plus Sporting Park is currently under construction in Kansas City, Kansas near The Legends at Village West. This stadium construction update for …

Sporting Kansas City's state-of-the-art, $180 million plus Sporting Park is currently under construction in Kansas City, Kansas near The Legends at Village West. This stadium construction update for the week of February 23, 2011 is courtesy of Turner Construction. For more information on Sporting Park, visit SportingKC.com/virtualvenue or watch the webcam at www.sportingwebcam.com

Published in: Sports
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,382
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. From: Nick Durand To: David Ficklin - OnGoal Rory O’Connor – OnGoal Office: Kansas City Lee Turner – OnGoal Date: 2.23.2011 Andy Heitmann – Turner Dave Dudzik - Turner Re: Sporting Kansas City Brandon Valdez-Turner Project Update – Week of 2.23.2011 Current Activities this Week: Site/Playing field: Grading site on the East side of building to be ongoing. Cleaning up areas in preparation of plaza work is ongoing. Underground drainage and irrigation at the playing field is ongoing. Concrete Flatwork: Area 1-Suite and Press level tub intermediate stairs are ongoing. Area 1- Platform for Stadium Suite bar area is complete. Area 3-Base slab at cauldron club extended out for curtain wall installation is complete. Finishing of exposed concrete walls to be ongoing. Area 1- SOG work at SW toilet entry to be completed. Installation of field drainage and irrigation lines. Masonry: Block installation at NW transformer area to be ongoing. Block installation at Terrace Bar is ongoing. Block installation at SW toilet entry to be ongoing. Sealing and final wash of block on the East side to begin. Stone: Area 1-Stone installation in area H to be ongoing. Steel: Installation of roll up doors in concessions is ongoing. Installation of stone support steel at Stadium Suite is ongoing. Area 3-Subroof under Stair #1 to be ongoing. Installation of SE corner screen wall tubes is ongoing. Installation of bar joists and roof decking in area H to begin. Installation of dock overhead doors to begin. Installation of Suite level intermediate stairs.Building the Future
  • 2. Roofing and Sheet metal: Area 1-Alucobond metal panel installation at Suite and Press level on field side is near complete. Alucobond metal panel and subgirt installation is ongoing at Concourse buildings. Drilling anchors for exterior fins is ongoing in all areas. Area 3-Concourse building roofing is ongoing in the SE. Louver installation at East side is complete. Gutter shrouds at canopy gutter are ongoing. Canopy deck flashing installation is ongoing. Polycarbonate: Area 1-Polycarbonate installation is ongoing. Area 2-Polycarbonate installation is ongoing. Block work at SW toilet entrance. Metal Stud Framing/Drywall/Ceilings: Area 1- Drywall installation is near complete. Area 3-Drywall installation and finishing is near complete. DAFS installation is ongoing at exterior soffits. Stud framing for North screenwall/ metal panels is ongoing. Drywall installation in concessions/retail areas is Ongoing. FRP installation in Concessions is ongoing. Ceiling grid installation is ongoing on all levels. Glass: Area 1-Storefront at 24-27 lines installation is complete. Area 1-installation of aluminum door frames is ongoing. Area 1-installation of store fronts at VIP entrance is complete. Installation of storefronts at Main Concourse retail buildings is ongoing. Installation of Press level Solar innovation sliders is ongoing. Area 1- installation of interior storefronts is ongoing. MEP: Ductwork installation in the west tower is complete Installation of metal panels at concessions. and is ongoing on the East side field level. Plumbing rough is complete in the west tower and is ongoing on the East side field level.Building the Future
  • 3. Site-SE and SW transformers have been energized. NW transformer is now set and primary cables are being pulled to transformer. Installation of the backbone cable is complete and is terminated in the IT rooms. All racks and cabinets in the West tower have been assembled and termination of cables is near complete. Concession building rough in for all MEP is near complete. Installation of permanent lights and speakers in soffits is ongoing. Fixtures and devices are being installed in the West tower and termination of branch circuits is ongoing. South scoreboard module installation is complete. Sub air equipment is installed and all secondary work is complete. Area 1-installation of toilet fixtures on Suite and Field level is ongoing. Broadcast cable pulls from loading dock to the Video Production room is ongoing. Tie –in of canopy gutters to downspouts is ongoing. North scoreboard structure installation to begin. Elevators: F1 elevator installation is near completion. Installation of storefronts at V.I.P entrance. P2 & P3 elevator installation is ongoing. P4 & P5 elevator installation is ongoing. P1 has been delivered and installation to begin. Painting: Area 1-Painting at Field level is ongoing. Area 1-Painting in Main Concourse buildings is ongoing. Area 1-Painting on Press and Suite level is near complete. Sealing of exposed concrete floors is ongoing. Resinous flooring at field level is ongoing. Resinous flooring in Concessions, Suite, and Press is ongoing. Painting of stair structure and walls is ongoing. Tile: Tile in Suites on Suite level is complete. Tile installation in club areas at Suite and Press levels Tile installation at Field Club. has begun. Tile in restrooms at all levels is ongoing.Building the Future
  • 4. Food Service: Countertop installation in Concessions is complete. Installation of all counters and kitchen equipment at Mezz level, Suite level, and Press level to be ongoing. Cooler installation in concessions and cauldron club is near complete. Exhaust hood installation in cauldron club to begin. Projected Activities occurring next Week: Concrete Flatwork: Area 1-Suite and Press level tub intermediate stairs to be completed. Finishing of exposed walls to be completed. Cauldron Club topping slab installation to begin. Stone/masonry: Block installation at NW transformer area to be complete. Block installation at Terrace Bar to be ongoing. Painting is ongoing in RR’s at Main Block installation at SW toilet entry to be complete. Concourse. Stone installation in area H to be ongoing. Steel: Installation of roll up doors in concessions to be complete. Installation of stone support steel at Stadium Suite to be ongoing. Area 3-Subroof under Stair #1 to be complete. Installation of SE corner screen wall tubes to be complete. Installation of bar joists and roof decking in area H to be completed. Installation of dock overhead doors to be ongoing. Roofing and Sheet metal: Canopy gutter shroud installation to be ongoing. Area 3-North East concourse roof to begin. Installation of metal panels at concessions to be ongoing. Overhead door installation at loading dock. Field measuring for metal panels at Stadium Suite to be complete. Installation of coping cap at concourse roof to be ongoing.Building the Future
  • 5. Metal Stud Framing/drywall soffits: Area 1- Drywall installation to be complete. Area 3-Drywall installation and finishing to be complete. DAFS installation to be ongoing at exterior soffits. Stud framing for North screenwall/ metal panels to be complete. Drywall installation in concessions/retail to be complete. FRP installation in Concessions to be ongoing. Ceiling grid installation to be ongoing on all levels. Glass: Area 1-Aluminum door frame installation to be ongoing. Installation of storefronts at Main Concourse buildings to be ongoing. Installation of interior glazing at Field and Mezz. level to be near complete. Installation of Solar innovation sliders at back of suites on Press level to be ongoing. Locker installation at field level. MEP: NW transformer to be energized. Installation of North Scoreboard to be ongoing. Preliminary hydrostatic testing of the fire sprinkler lines to begin. Energizing mechanical equipment to begin commissioning/start up. Paint: Area 1-Painting of the Suite and Press level areas to be near complete. Painting of the Main Concourse buildings to be ongoing. Painting at Field level to be ongoing. Sealing of concrete floors to be ongoing. Painting of stair #4 and #9 to be complete. Resinous flooring to be ongoing in concessions. Playing Field: Installation of underground drainage and irrigation lines to be ongoing. Drilling for fin anchors is ongoing.Building the Future
  • 6. Additional Photos:Framing for metal panels at North main Subroof installation under Stair #1.concourse.Tile and millwork installation at Executive Suites. South scoreboard module installation is complete. Building the Future

×